Continuous and Non-continuous Electrical Loads with NEC 2023 210.19(1)(A)
HTML-код
- Опубликовано: 1 дек 2023
- Also see: How to Bond Neutral and Ground With 2023 NEC Code Book and Handbook: • How to Bond Neutral an...
What's the Difference Between an EGC and a GEC?: • What's the Difference ...
Bonding Screws vs Bonding Straps (NEC 250.24 (B) Main Bonding Jumper: • Bonding Screws vs Bond...
NEC 2023: How to Find Torque Specs for Panels & Breakers Marked or Unmarked: • NEC 2023: How to Find ...
How to Wire a Half Hot Receptacle in a 1957 House: • How to Wire a Half Hot...
Half Hot Receptacle with Power to Switch Installation: Amazon: • Half Hot Receptacle wi...
How to Wire a Half Hot Receptacle with Power to the Receptacle: • How to Wire a Half Hot...
How to Install a Marked Controlled Receptacle: • How to Install a Marke...
Marked Controlled Receptacle: Wiring, 2023 NEC code 406.3(F) and Diagram: Amazon: • Marked Controlled Rece...
Fluke 117 Digital Multimeter, Non-Contact AC Voltage Detection, Measures Resistance/Continuity/Frequency/Capacitance/Min Max Average, Automatic AC/DC Voltage Selection, Low Impedance Modeamzn.to/3L3wjvg
Leviton 5691-2W 15 Amp, 120/277 Volt, Decora Plus Rocker Single-Pole Quiet Switch, Commercial Grade, White: Amazon: amzn.to/3ffg1zr
Leviton 16252-W 15 Amp, 125 Volt, Decora Plus Duplex Receptacle, Straight Blade, Commercial Grade, Self Grounding, White: Amazon: amzn.to/3jM9Y8v
Leviton 5693-2W 15-Amp 120/277-Volt Decora Plus Rocker 3-Way AC Quiet Switch, White: Amazon: amzn.to/2WidQoj
IDEAL Forged Heavy Duty Dual NM Wire Strippers: IDEAL.com.: www.idealind.com/us/en/shop/c...
IDEAL Forged Heavy-Duty Wire Stripper: IDEAL.com: www.idealind.com/us/en/shop/c...
IDEAL INDUSTRIES INC. 61-534 Digital Circuit Breaker Finder with Digital Receiver and GFCI Circuit Tester: Amazon: amzn.to/2oW56Ds
IDEAL Electrical 35-9305 Insulated Screwdriver Set (2 Piece) Orange, 4 in. Shaft Screwdrivers with Cushion-Grip Handles. Electrician Tool Kits
Kindle Unlimited 30 day free trial for both reading and listening: amzn.to/3DrVHFC
Bill and sparkychannel.com are participants in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com
I appreciate seeing the citations from the code. Thanks!
No problem! It's the only way to go.
Simple as Ohm's law. I was taught to remember pioneer (pie and eir) as a mnemonic . P=I*E and E=I*R. Where P= power (watts), I = current (amps), E = voltage, and R = resistance
Thanks for the tips!
Great video Bill.love it !
Thanks Andrew! @@andrewhylton4780
great tip. i was taught " Pie eater" instead lol
Thx for keeping us ''Current '' & up to code Thx for these vid's Bill
"Continuously" current that is! As opposed to being "non-continuous". Thanks Eddy!
Touche my friend @@SparkyChannel
Merry Christmas and Happy New Year
Happy new year!
Very good. I like a lot of circuit (breaker) control in a home shop or working garage. Good video.
Thanks 👍 Glad you liked it!
Great Soarky !!!
Thanks!
I saw your channel was subscribed to my channel
very interesting because this was my favorite channel when i was in 4th grade
Wiring is so much easier before the drywall is up.
I would install four 20A circuits, with three 2-gang outlets per circuit, and also a 240v 50A circuit just in case.
Thanks, Bill! Very good explanation of the circuit types and calculations.
Thanks Tim!
Great vid. But you didn’t mention that you would have to up the wire gauge for the circuit for the continuous loads to 10 awg to prevent wire insulation stress from overheating from the continuous load. Thanks.
Awesome
Thanks Dave!
Thank you sir
Welcome John!
Nicely done, Bill! Great explanation and video. 👍
Thanks Don! And thanks so much with your help on this one!!!
Good info!
Thanks!
Good explanation Sparky.
Thanks Gary! Have a great weekend!
next question is what combination of equipment makes those loads, because if that's a single load, you need a dedicated circuit for it.
Hi Ken! Hope you're well. He did say the circuits were for tools, plural. But you are correct. More questions should be asked. But I thought it would be a good opportunity to discuss continuous and non-continuous loads.
@@SparkyChannel I think I saw the same question asked in another channel. and yeah, it seemed to be general tool circuits. but yes, when people start talking about workshops, it's good to have a clear idea of what is going to be going on. and it bears mentioning, a space heater is ALWAYS a continuous load.
Excellent points! @@kenbrown2808
can you use a common neutral with this setup and the gfci's?
Now I'm going to check my pool pump circuit, not that I'm worried about it since it's 5 feet from the sub-pannel. Don't you think line lengths should be considered? Like a Tesla charger directly under a panel like I often see with 2 feet of line, seems silly to derate, doesn't it?
Great points! Length of conductor derating and conductor heat derating are going to be separate videos.
Would arc fault be another alternative depending on that person's living location?
A dual function breaker would be great for a garage. (GFCI and AFCI)
Like a kiln for clay
Thanks!
I am surprised that the time frame for continuous load is three hours.
Sounds a little arbitrary, doesn't it?
Bill, didn't know how to submit this question, so im doing it here.
There was a meeting at our local county commissioners in December (ruclips.net/user/clipUgkxFRPGqS4Fb8Lz5u9tGb3DQTT0GOQJsxE9?si=3sjvLwc2SQqoTEuV )
Talkimg about 30amp and 50amp gfci feeders for an RV park not working.
Is this situation they describe something that is not connected properly or is this a real issue?
What I want to know is what he’s doing in his garage that will take nearly 3kw for 3hrs.
He said tools, beyond that I don't know.
@@SparkyChannel The power need for tools (usually always motors within the tool) is what I found unusual, because tools are typically only on while working a piece. Even when they are on longer, their draw is much less when not actively tooling a piece. Multiple small CNCs running 3 hour programs maybe, but don't expect that to be described as tools. Ventilation or an oven is a candidate for continuous, though. In real world, we would both be asking, back up and tell me details of what you are trying to do. Nonetheless, great and precise discussion on continuous loads!
Thanks! Also, an electric space heater would be counted as a continuous load.@@RJ-ej1nr
Did he quit RUclips?
No, I'm still here. Had to take some time off to repair a flood damaged home.
Hi, Bill, there was a video, of a guy showing people, how to buy pass the main breaker for a home furnace, and he showed how to replace the switch also, on side of furnace, main line back to breaker, and in switches place, used a used a loop of cord, to plug into, a power station, or run extension cord out side to gas generator....
To power furnace, if power goes out, in dead of winter.....
Is this a major code violation, and you have a code compliant way to power furnace, other than this above mentioned....
Here is this guys video....for clarity....
ruclips.net/video/y07w1hiKIrI/видео.htmlsi=WaXRD3ZpglYhx7-w