  • In this video I'm back on my own place working on the dormer. I fit the lead flashings up the sides. Stainless steel fly/insect mesh. And do all the timberwork to the dormer. Making sure there is adequate ventilation ready for the lead to be installed.
    I hope you enjoy.

Комментарии • 20

  • @tomalley798
    @tomalley798 2 месяца назад +1

    I think you need to do more vids working on your roof. Show us your mate does the round roof.

    • @slbleadworks
      @slbleadworks  2 месяца назад

      Thank you. I’ve done another vid on my roof recently.

  • @tomalley798
    @tomalley798 2 месяца назад +1

    Now that’s what you call water and cockroach tight

    • @slbleadworks
      @slbleadworks  2 месяца назад

      Thank you and thanks for watching.

  • @markt8820
    @markt8820 2 месяца назад +1

    Great vids! I'm not in the biz, but I understand you're supposed to use construction paper behind lead , but you didn't use it on the cheeks? Why is that? Also vapour barrier on top of breather membrane? I didn't know that was a thing?
    Thanks
    Mark

    • @slbleadworks
      @slbleadworks  2 месяца назад

      Hi Mark. Yes you need to use grade A building paper. I will do before I put the lead on. I’ve Just covered the dormer with the felt breather membrane to protect the ply untill I can lead it.
      And I called it a vapour barrier. But it’s just another breather membrane as there was so many holes in the first layer.

  • @roygalley1009
    @roygalley1009 2 месяца назад +1

    I knew you'd do that in lead. I'm looking fwd to seeing the process. It's going to look amazing.

    • @slbleadworks
      @slbleadworks  2 месяца назад

      I hope so too. Thanks for watching

  • @mohammadahmad0790
    @mohammadahmad0790 2 месяца назад +1

    Does it ventilate into the soffit? Or is it just the slither at the top

    • @slbleadworks
      @slbleadworks  2 месяца назад

      It has an airflow from underneath and I did design it to vent out the slither out of the top too. But I might be changing that.

  • @Morning_Rays
    @Morning_Rays 17 дней назад +1

    Hi, thanks for your videos. Do we need lead flashing on top of soakers? What is the size of flashing please?

    • @slbleadworks
      @slbleadworks  16 дней назад +1

      I did for this detail.
      The sections were cut into 1.2m using 150mm code 4.

    • @Morning_Rays
      @Morning_Rays 14 дней назад

      ​​@@slbleadworksThank you for your answer. Do you have any video on lead flashing above soakers please? I want to know if the lead flashing above soakers is tucked behind the tiles or does it cover the tiles slightly? I was trying to check this on your video but couldn't be sure. Thanks

    • @slbleadworks
      @slbleadworks  8 дней назад +1

      @@Morning_Rays ruclips.net/video/rdAs6A-kThs/видео.htmlsi=kCIPr2NiDKPwjdnD
      This video might help you out

  • @clintshearer9131
    @clintshearer9131 2 месяца назад +1

    Is the dorma roof going to be lead as well?

    • @slbleadworks
      @slbleadworks  2 месяца назад

      No I’m having tiles up there.

  • @mrv123weir
    @mrv123weir 2 месяца назад +1

    Your gonna finish your dorma in Lead? Hats off to ya, gonna look smart that, looking forward to next vid 👍🏻

    • @slbleadworks
      @slbleadworks  2 месяца назад

      Yes that’s the plan. Just so busy at the moment so it’s having to be put on hold.

  • @thomashowes7198
    @thomashowes7198 Месяц назад

    Hi Stuart, why do you use a breather membrane and a vapour barrier over the top?

    • @slbleadworks
      @slbleadworks  Месяц назад

      Hi.
      It was a bad choice of words. It’s just a breather membrane.