The Worst JOB I Have EVER BEEN TO - Electrician

Поделиться
HTML-код
  • Опубликовано: 24 фев 2022
  • Here we have a delightful build a special something that I've never ever seen before it's bad
    link here for Tradify for 50% of 3 months. bit.ly/3HEISts
    Use code BUNDY25 at unilite.co.uk/product-categor... for 25% off
    Use code BUNDY10 at www.expertelectrical.co.uk for 10% discount
    Join this channel to get access to perks:
    / @nbundyelectrical
    This video is for entertainment purposes only and is in no way intended as a guide or 'how to'.

Комментарии • 383

  • @henryeadie7972
    @henryeadie7972 2 года назад +54

    Hager Board and 2 car chargers, sure Artisan hasn't been there? 😂

  • @sparkequinox
    @sparkequinox 2 года назад +67

    How anyone this incompetent actually gets the thing to work at all, is impressive.

    • @steve11211
      @steve11211 2 года назад +9

      Probably cause they were the cheapest?

    • @raychambers3646
      @raychambers3646 2 года назад +6

      Usual reply is " works don't it ? " ,which is when I bang my head on the wall.

  • @grahamcole4240
    @grahamcole4240 Год назад +14

    I did my apprenticeship starting in 1968 and in all my years as an electrician I have never seen such a bloody mess as this.. Well done sorting it out.

    • @Eurobrasil550
      @Eurobrasil550 9 месяцев назад

      You should see some of the 'work' here in Brasil! Especially as some areas have dual. Voltage 127/220v!
      Dual outlet sockets, one of either voltage, but physically exactly the same are common!

  • @OffGridSupplies
    @OffGridSupplies 2 года назад +28

    I really hope there will be litigation. The builder is responsible for damage to the existing installation and a complete rework of the kitchen etc. Unfortunately, they have probably gone bankrupt!

  • @tazdevil875
    @tazdevil875 2 года назад +23

    Well, on the plus side, the plumbers pipe work is nice :-)

    • @alidavemason4417
      @alidavemason4417 2 года назад +2

      Agree, however non of the pipes are insulated.

  • @Ampex196
    @Ampex196 2 года назад +20

    It's what we would call, in the old days, 'a bugger's muddle'.
    There's nothing worse than sorting out someone else's mess. I'd be sorely tempted to pull the whole lot out and start from scratch - to hell with the cost.

    • @michaelmayfield4304
      @michaelmayfield4304 2 года назад +1

      Just to keep from seeing smoke and fire a week later

    • @jamescpalmer
      @jamescpalmer Год назад

      That's a great name I'm taking that XD Applying this to software dev from now on

  • @doomain6769
    @doomain6769 2 года назад +27

    All the Qualifications and requirements for good honest electricians to have, update regularly, pay for annually, to be deemed competent to do domestic work. And then there's the people with nothing that get these jobs and make a right mess of someone home.

    • @cuebj
      @cuebj 2 года назад +3

      Fact is, lots of people want the sh1t job, turned down proper quotes, and boast of the low cost until sh1t hits the smoke detector (if installed!). Not talking of buy to let either. Continue to be astonished at some neighbours' choice of tradespeople.
      Trouble is - we've used registered, professional, long-established, recommended sparks who have been very sloppy too - despite me installing conduit and boxes and them saying it's "an electrician's dream"

    • @bramcoteelectrical1088
      @bramcoteelectrical1088 Год назад

      What a mess...

  • @prolecelectricalservices3813
    @prolecelectricalservices3813 2 года назад +76

    And for the record…….CPC’s must be connected through, regardless whether it is a class 2 fitting or not. Anyone who says different needs to continue with their education.

    • @chrisjones7504
      @chrisjones7504 2 года назад +6

      Completely agree. I think diyers don't understand that it's also there to protect the cable too.

    • @prolecelectricalservices3813
      @prolecelectricalservices3813 2 года назад +4

      @@chrisjones7504 Plus its regulation that a CPC is present at each point in a circuit

    • @cooper512
      @cooper512 2 года назад +1

      People who don’t get this don’t understand their fundamental principles

    • @James_scott86
      @James_scott86 2 года назад +1

      I mean that’s first week at college stuff, if you’re not doing things like that then what other corners are you cutting?

    • @jaycee1980
      @jaycee1980 2 года назад +1

      @@chrisjones7504 even as a DIYer i understand that!

  • @dylanshenton6001
    @dylanshenton6001 2 года назад +4

    What a state that was, props to you both for making it all safer. A great example of keeping your cool and working your way through the s***

  • @cranefamily
    @cranefamily 2 года назад +11

    I am sure Dave would have got more satisfaction helping sort out that mess, than a beer in his right hand or maybe not 😂 great work guys

  • @stuartthespark
    @stuartthespark 2 года назад +32

    Adam, don't go putting your hand into a live board or touch random cables use a long nose insulated pliers if you want to move a cable.

    • @lewishardy3622
      @lewishardy3622 2 года назад +3

      Grow up

    • @stuartthespark
      @stuartthespark 2 года назад +12

      @@lewishardy3622 safety first

    • @inputimmersion9577
      @inputimmersion9577 2 года назад +8

      @@lewishardy3622 Nah, i know a guy who did the same thing but on an industrial 3 phase system and it blew a literal hole in his arm. It was so deep he didn't even feel it and he had to have plastic surgery to fix it. Always use tools unless entirety of the board is dead.

    • @AllStarNES
      @AllStarNES 2 года назад

      @@lewishardy3622 Pipe down

    • @lewishardy3622
      @lewishardy3622 2 года назад

      @@AllStarNES what are you? A plumber?

  • @andrewcadby
    @andrewcadby 2 года назад +11

    35:35 The 1mm T+E to the UFH spur actually (probably) complies with the requirements for overload protection.
    433.3.1(ii) allows you to omit overload protection where the characteristics of the load means it's unlikely to carry overload current (and fault current protection is met, which it will be by the 32A breaker). UFH, being a simple resistive load, has these characteristics.
    So unless the UFH is intended to pull more than 16A (the rating of 1mm T+E method C), it can't overload the 1mm cable.
    1mm doesn't, however, meet 524.1 (min conductor for power circuit 1.5mm).
    None of this changes the fact that it's a crock and need sorting, but food for thought though.

    • @brianoneill350
      @brianoneill350 2 года назад

      When he says it feeds the heating.if he means feeds the heating controls then 1 mm would be fine.

    • @brianoneill350
      @brianoneill350 2 года назад

      The table 52.3 allows non sheathed and sheathed flexible cable to be used for a specific appliance as specified in the product standard and for any other application down to .75 mm. Signalling and control can be 0.5 mm.

    • @andrewcadby
      @andrewcadby 2 года назад +3

      @@brianoneill350 Flexible cable, as defined by BS7671: A cable whose structure and materials make it suitable to be flexed while in service.
      This means fine stranded flex. The 1mm T+E between the FCU and RCDFCU wouldn't meet this.

  • @linksone6287
    @linksone6287 2 года назад

    Blinding video Nick/ Adam. Thanks for the continued knowledge bro! 👊🏽

  • @steve11211
    @steve11211 2 года назад +11

    Wow, well done.. I think I would have taken a quick look at that lot and just said rewire cause god knows what else is hiding under the floorboards...

    • @cuebj
      @cuebj 2 года назад

      That's what I did

  • @jayAsparks
    @jayAsparks 2 года назад +3

    I hope you are on a day rate for this fine bodgery. You will keep finding bodges the deeper you dig. Fair play for taking this work on though lots will turn straight back out the door.

  • @steveb1856
    @steveb1856 2 года назад +8

    Best argument against dual RCD boards, allows total bollocks but will still work, should be mandatory to fit full RCBO boards!

    • @jaycee1980
      @jaycee1980 2 года назад +1

      How far do you go down the rabbit hole there? It's like the argument against ring circuits - most of the arguments are "... so if some dickhead splits the ring"... well... dont let dickheads work on electrical installations!

    • @inputimmersion9577
      @inputimmersion9577 2 года назад

      Yeah only people don't wanna pay several hundred quid for a board. Make RCBO's cheaper and people will use them.

    • @KillingfalkONroblox
      @KillingfalkONroblox 2 года назад +1

      As a norwegian electrician, i gotta say, those "ring circuits" are a silly and outdated way of doing things. they were done because of the price of copper, and by doing it in a ring circuit you save money on wire circumference. But this was wayy back, like in the 1920s.
      If you UK sparks did it "normally" (like the rest of the world does it) you'd have them connected in series, and you'd have a much easier time fault finding.

    • @jaycee1980
      @jaycee1980 2 года назад +1

      @@KillingfalkONroblox You are free to fit "radials" if you want.

  • @pauliboo2
    @pauliboo2 2 года назад +2

    Looking forward to the part 2 video from this!

  • @alhughes9698
    @alhughes9698 2 года назад +1

    Nice work on 61k Subs Nick, hopefully 100k by the end of the year!

  • @dskirkpa55
    @dskirkpa55 2 года назад

    Thanks guys, another great vid. What a headache this must have been. But between you's sussed as always . Keep up the good work and of course your standard of workmanship.

  • @darrensmith8827
    @darrensmith8827 2 года назад

    Well done for sorting out that mess you guys are legends builder needs a slap

  • @jakedrums1398
    @jakedrums1398 2 года назад +44

    Builder needs reporting to trading standards. That is absolutely disgraceful

    • @raychambers3646
      @raychambers3646 2 года назад

      Had a run in with a kitchen fitter ,a friend asked me to snag the job ( he said he would outsource the elecs and plumbing) but he did the elecs badly 2 a4 sheets of snags later ,usual answer that's how it was before I just connected it , works don't it? I did sort it for her, just annoying could have done the Job in the first place .

  • @andyxox4168
    @andyxox4168 2 года назад +1

    I’m loving the fact that there are two open pipes with isolation valves right above the consumer unit …

  • @GaryB1980
    @GaryB1980 2 года назад +2

    Someone somewhere probably thought they knew what they were doing! Good work men..

  • @stephenpeacock2627
    @stephenpeacock2627 2 года назад +9

    Wow, I do diy electrics and I’d be ashamed to do such a poor job. Though I would only touch stuff within regs.

  • @Rainbowhockey
    @Rainbowhockey 2 года назад

    The lingering shot of Adam's 🎂. Mr Bundy you are really spoiling us! Also I thought he was gonna say he was stuck for a minute! 🤣

  • @chrisholt2474
    @chrisholt2474 2 года назад

    Hell, what a complete mess you have been left to sort out, unbelievable. I’m amazed you can make any sense of that mess to even begin to put it right. Well done, stunning work. 👍👍👍

  • @haydenuk02
    @haydenuk02 2 года назад +23

    Wow that’s a right mess. This is definitely a prime example of why you shouldn’t ever let builders do the electrical work. I’m no spark I’m a mechanic but I’m sure I could have done a better job than that builder did. Brilliant and quality work as always Nick and Adam and thanks for sharing this with us take care

    • @paulthomas8262
      @paulthomas8262 2 года назад

      It also illegal in a kitchen to do it without it being singed off by an electrician. Few electrician are willing to sign off for amateurs. You can't sell your house or at least you would be liable if you managed to.

    • @paulthomas8262
      @paulthomas8262 2 года назад

      There is limits to what amateurs can do like the odd spur.

    • @intercity125
      @intercity125 2 года назад

      @@paulthomas8262 Your knowledge on Part P is... 9 years out of date. As long as it isn't a whole new circuit (as in from an extra protective device in the CU) kitchen work isn't notifiable.

  • @trevorhawk2000
    @trevorhawk2000 Год назад

    props to you guys for figuring out that mess

  • @killerbean9911
    @killerbean9911 2 года назад +12

    As a plumber all I see is those two (probably live) isolation valves facing the board, just a disaster waiting to happen
    But damn that is a mess. Even I know some of that's wrong and I can barely change a lightbulb
    Right, so....

  • @chrisrodriguezenator
    @chrisrodriguezenator 2 года назад +1

    All that intro needs is Dave Savery in the corner waving his fist while ranting about kitchen fitters, surprised any of that mess actually works!

  • @garythespark6295
    @garythespark6295 2 года назад +2

    Finally a title that lives up to its name. 2 minutes in and it’s completely justified.

  • @macfan9946
    @macfan9946 2 года назад +1

    its a good job there are good electricians like you around, good vlog

  • @jonesgang
    @jonesgang 2 года назад +4

    The real fun of being an electrician. Looking at around 2 days to sort through all that mess. But believe it or not I have seen far worse.

    • @davidcollins7739
      @davidcollins7739 2 года назад +1

      a mate of mine told me he was rewiring a terraced house when he found the upstairs of one house was fed from the upstairs of the next one, ''s'cuse me missus, can yer turn yer power off please"

  • @firsteerr
    @firsteerr 2 года назад +4

    i ahd a similar job back in the late eighties a nice Kensington town house with a basement kitchen , very pretty i went to check it all out and started by cct identifying , so i knocked them all off , put in six amp lighting ..kitchen lights on , great , turned it off , nest six amp onb kitchen lights working ............ok turn it off try a 32 amp kitchen lights on !!!
    cut a long story short found a sixty amp switch fuse behind the coats in the hall way with ALL the lives IN and all the lives out !!!!

  • @polishlad8873
    @polishlad8873 2 года назад

    I'm the only diy guy. I really admire your work and knowledge. Keep doing a good work lad !

  • @marksmith-ew7ir
    @marksmith-ew7ir 2 года назад

    Great job done by both

  • @lh2589
    @lh2589 2 года назад +2

    Should be dividing by 230v I believe. Not that it makes a massive difference to your calculation, a little under an amp but regs uses 230 as nominal voltage for its calcs.

  • @williamlowther7051
    @williamlowther7051 2 года назад

    You get all the good jobs, excellent fault finding, well done

  • @dishydave1819
    @dishydave1819 2 года назад +2

    Last time I saw anything quite that bad it was a neighbour whose husband had replaced their Consumer Unit himself just before he left her. Amongst many many faults he'd left was a fabulous (sarcastic!) situation where two different MCB's switched off the Boiler and Central Heating ... one was a 32, one was a 16, both had 1mm cable to them, and both had to be on for the CH and boiler to work. Heaven alone knows how on earth there had not been a fire or someone electrocuted. It was only discovered when the pumped shower mixer would not turn off and it was found that there was no isolator (or fuse) on the shower pump supply and the only way to switch if off was to knock off the mains. Turned out the shower pump was being supplied from a 13a plug into a 'floating' socked under the floorboards on the ring final circuit. Anyway, fab video as always, Happy Birthday for last week Adam and keep up the fab work both of you. 💯💯💯

    • @Ragnar8504
      @Ragnar8504 2 года назад +1

      Oh yeah, ex-husbands... I was once called to a job where a lady thought someone was stealing her power because her bills seemed high and her meter was spinning much faster than her neighbour's (block of flats). The first issue was sorted rather quickly, unplugging her fridge and freezer made the meter stop spinning completely, so nothing untoward. Besides, the neighbour's meter was one doing 75 revolutions of the little disc per kilowatthour while hers did 480. Hardly surprising hers spun faster.
      The kicker was the CU though. The place was built in the mid-50s, council flats. In Austria, earthing became mandatory in 1959 for all circuits, prior to that it was only required for kitchens. The incoming mains was 2.5 mm2 on a 20-amp cutout, pre-1965 colours, i.e. red earth and grey neutral. The original sparks had just joined the three CPCs together, no earth bar in the original fuse board. When the lovely ex replaced that, he didn't recognise the CPC and simply left all the CPCs of his rewire floating. He also fused all the neutrals and connected the lives to the neutral bar. "Yes, he said we didn't have an earth here!".

  • @deansjball
    @deansjball 2 года назад +6

    Wow. Great watch but absolutely shocking work! I'm no spark but think i could do better than the way they've left it all! Great stuff as ever Nick and Adam!

  • @johngoard8272
    @johngoard8272 2 года назад

    It's a wonder Nick how many places like this don't burn down and frankly, I don't envy you having to put things as they should be.

  • @HA05GER
    @HA05GER 9 месяцев назад

    Talking about screws through wires my mum and dad bought a new build in about 1990. We moved out on my 13th birthday in 2006. When the house wasnput up for sale we had tonhave an electrical survey of some sort. Turns out the gas pipe was screwed through one of the main feeds to the board had been like it 16 years.

  • @badrobert71
    @badrobert71 2 года назад

    Nick Bundy Investigates. Could be a TV show. Well done sorting the mess guys . Good learning for Adam also.

  • @kenhawkins5469
    @kenhawkins5469 5 месяцев назад

    Well sorted lads your a credit to your craft 😮

  • @alsanova
    @alsanova 2 года назад +1

    Wow, flaming hot mess!! If I was asked to sort this out, my brain would be on a meltdown! 🤯
    Regarding underfloor heating, would it be better to wire up to 3 pin plug and plug it in the socket there?

  • @HATCHETHAS
    @HATCHETHAS 2 года назад

    Two proper sparks that fix problems great video

  • @apollo8352
    @apollo8352 Год назад

    As a fellow electrician I did go to a house that had a new owner....the preious own built, plumbed and wired the entire house. Trouble was he did the entire wiring with figure 8 1mm squared wire usually used for sound system speakers at the most... (about 20 gauge) good for 8 amps max. Everything cooker, power outlets, etc no connectors, no junction boxes or anything.....just twist wires together and tape them up.... We went there to install a ceiling fan, but left by disconnecting the supply and calling in the regulator....(Energy Safety here).
    How it did not burn down amazed and scared me! Of course insurance would never have paid out on any claim.... What stopped it killing people was only the timber walls floors and ceiling making an earth isolated situation inside. Scary shit.

  • @klapouchy1000
    @klapouchy1000 11 месяцев назад

    Consider cable finder and reflectometer (TDR time domain reflectometer) similar to what we use here in the EU. Please get familiar with Finder and reflectometer concept based on market leading Sonel WMPLLKZ720, and Sonel WMPLTDR420 units. You can then decide if something similar would do the job for you.

  • @assassinlexx1993
    @assassinlexx1993 2 года назад

    If this is the worst case?
    Try finding the home owner using old two wire door bell wire his basement suite.
    Or a shed/ work shop. Where a piece triplex is strung to the shed and every wire inside is add to the triplex by twisting on it. With bits of old tape to hold it in place. One look and back into the truck I go.

  • @twigwonderkid
    @twigwonderkid 2 года назад

    OMG ! I appreciate I’m coming late to this. But good idea to do a one day check
    I think this is one I’d walk away from. Just where do you start with that bodge job. The customer just isn’t going to pay for the weeks of work to fix this

  • @gregp1707
    @gregp1707 2 года назад +2

    I’d be really interested to know how much the quote was for the remedial work - looks expensive!!

  • @JensenPGATourDriven
    @JensenPGATourDriven 2 года назад

    Great Content guys , Has a new Sparky learning this really highlights the Importance of quality work . And in this case it really Bad, ‘ serious stuff is electric ‘ Somebody home end of the day . And when you come across these type of jobs how will price this . And Decide if you do need to rewire this to make it safe . ⚡️👊

  • @Rory241995
    @Rory241995 2 года назад +1

    Have you considered a bell ringer for circuits seen them being used by other sparks for tracing?

  • @UberAlphaSirus
    @UberAlphaSirus 2 года назад +2

    I love fault finding, but bollocks to when sorting out sombodys cluster fuck. I feel bad for the customer, but I gotta charge accordingly for fixing it.

  • @ThePa1ch
    @ThePa1ch 2 года назад +3

    6mm and 32a breaker is fine for 32a hob and 18a oven once diversity applied.

    • @normanboyes4983
      @normanboyes4983 2 года назад

      Is it sensible to apply diversity to an Oven and a Induction hob? Really - they are often on together.

    • @jurassicsparks5220
      @jurassicsparks5220 2 года назад +2

      Of course you can.

    • @ThePa1ch
      @ThePa1ch 2 года назад +1

      @@normanboyes4983 Yes! Personally have this installed and have never had nuisance tripping or any issue. It's in the regs for domestic cooker installations for a reason...
      I dont have an issue if you want to give the client the option of having two circuits, but it's not something that needs rectifying in an existing installation IMO.

  • @Blitterbug
    @Blitterbug 2 года назад +1

    Haha! Mr Savery missed out on a good-un.

  • @thomasnoonan4171
    @thomasnoonan4171 2 года назад

    Nick and Adam , top job again lads , great video. That cowboy should be exposed as that is just dangerous in my opinion as nick said with kids . That customer once its complete the correct way will be so grateful and will be a customer for life . Well done again lads setting the standards 💪

  • @marksenior1179
    @marksenior1179 2 года назад +2

    Shame because the plumbing looks really good. Great horror film, the stuff of nightmares.

  • @JayTheSparky
    @JayTheSparky 2 года назад +3

    Wow! I’ve seen some poor work in my time but that’s up there with them! Jeez!
    Builders that “Do electrics” I’m not talking a firm who subs it out but this lot is atrocious! Just dangerous how people can leave stuff like this is beyond me!😳🤯😱

  • @imark7777777
    @imark7777777 Год назад

    I hope you're putting our RCBOs in there because who knows what else was done.

  • @brook316
    @brook316 2 года назад

    The supply and hob were wired in the same side of the fused spur, that's why it wasn't blowing.

  • @channelI748
    @channelI748 Год назад

    Young guys taking it seriously. Well done guys.

  • @stevelambert6689
    @stevelambert6689 2 года назад

    To install it like this is probably a skill in it's own right. I couldn't do it if I tried. 😀😁😂 When you see this sort of thing I often what's inside their heads. Be interesting to interview them.

  • @carlhobson1578
    @carlhobson1578 2 года назад +2

    As you say, I’m sure it’s more difficult to make that mess than to do it properly!!

  • @cuebj
    @cuebj 2 года назад

    Even worse than what we found when gutting prior to refitting our 1930s semi in 2014. Since realised that lots of home owners actually want cowboy builder to do cowboy electrics at minimal cost - even rejecting proper quotes from proper pros. They just want it covered up so out of sight and out of mind. Not talking about buy to let - it's for raising family in the time bomb!
    Similar to what found in daughter's ex-council maisonette a three years ago - 3 or 4 eras of 'electrical work' by council since original superb building in late 1950s - with all subsequent coal dust, sawdust, loose cables, light fittings, etc still under first floor boards.

  • @tombarrett1487
    @tombarrett1487 2 года назад

    Videos like this are why if ever a builder, kitchen/bathroom fitter says they can sort the electrics, I tell them to jog on.

  • @simoncarney9944
    @simoncarney9944 2 года назад +2

    WTAF has been going on here! It’s a shame Dave Savery couldn’t be there to see it, the air would have been blue! 😂

  • @RichardArblaster
    @RichardArblaster 2 года назад

    Great video 😎

  • @KeritechElectronics
    @KeritechElectronics 2 года назад

    Oh, just come to Poland and work on 1960s...90s wiring, especially improperly maintained. Aluminum or very thin copper wires, rust, loose contacts, burnt insulation, unauthorized connections, switches on neutral, self-repaired fuses (illegal here), no wire color-coding etc. That is the real WTF. Sometimes it's so bad that it makes me want to throw a grenade in and start it all from scratch.
    By the way it's so mind-boggling to see single phase high current utility, rather than three phase that is all over the place here, increasingly so in domestic settings.

  • @happymadison1978
    @happymadison1978 2 года назад +1

    Great video as always guys. LAP = lousy and problematic.

  • @enigmaticx326
    @enigmaticx326 2 года назад

    Nice job on the plumbing tho

  • @g7eit
    @g7eit Год назад

    Definitely the plasterers handy work 😂

  • @tommymack3210
    @tommymack3210 2 года назад

    Nice tool you got there Adam

  • @roberthardy2013
    @roberthardy2013 Год назад

    What a crack job! I use the free Day One journaling app on my iPad for notes, it’s great.

  • @ianbird6997
    @ianbird6997 Год назад

    The hob connection was mental didn’t think 6mm would fit with a 1.5 😂🤦‍♂️

  • @phillipmaciver3226
    @phillipmaciver3226 2 года назад +1

    Fault finding should be an Olympic event......you would certainly win a medal!....if a builder can be that lax with electrics, what else is he useless at?.

  • @gerdberg4188
    @gerdberg4188 Год назад

    I have had a few jobs like this , I do not have good news . Ended up taking everything apart and redoing all the boxes . So at that point it all got new switches and receptacles and plates . Only way to know for sure .

  • @leighbrowne8863
    @leighbrowne8863 2 года назад

    When ever I go to work at a property with an extension (of any kind) new kitchen or bathroom or any new building work i’m always expecting ruff electrical work. I’d like to say nothing surprises me anymore but then something does!

    • @Draxindustries1
      @Draxindustries1 2 года назад

      You're right. Nearly all new extensions , kitchens have some sort of bodge and unfinished work . People seem to accept this and just use it as a finished job.

  • @RichardArblaster
    @RichardArblaster 2 года назад +3

    I'd say this is beyond a cowboy job 😮😮😮

  • @michaelmeredith9470
    @michaelmeredith9470 2 года назад +1

    Great video sorting out the mess left by someone who should never be allowed to touch electrics. Well done

    • @happymadison1978
      @happymadison1978 2 года назад +1

      I would let them touch electrics.. left hand on line, right hand on neutral while standing in wet socks on a 33kVA substation…

  • @leechambers8195
    @leechambers8195 2 года назад

    So when you get a light fitting without an earth connection what should you do with the earth wire ?

  • @graememclaughlin720
    @graememclaughlin720 2 года назад

    Was harder to do it wrong 😑 from a gas engineer 2.5 ring, 1.5 radial for lights no copper showing and sleeve cpc 🎣

  • @alanpeters5221
    @alanpeters5221 2 года назад

    To stop this kind of work that you found cant the last sparky be tracked down to make sure they can get retrained and cannot leave dangerous work behind

  • @adamsmithelec
    @adamsmithelec 2 года назад

    I had the misfortune of having to fit some of those LAP downlights. What a load of old shit! No terminal for the CPC to maintain continuity and you can't wire directly into them with T&E without having conductors exposed outside the enclosure.

  • @joe2395
    @joe2395 2 года назад +2

    Trouble is on jobs like that is not what you can see it's what you can not see ie chased in walls and under floors,every sparks likes a challenge and help people out but in my mind why should you get a headache putting your name on the certificate,a runner comes in mind 👍

  • @ryanatkins3013
    @ryanatkins3013 2 года назад

    Lovely job 🥴🤥 fair play for working it all out.👍

  • @davidroth7586
    @davidroth7586 2 года назад +22

    I'm a kitchen fitter and loose so much work for being to experience and it's always the electrical work that's 2 expensive as I use a qualified sparky. Home owners need to learn that this is what happens when you go for cost over quality. Ime a very competent person but still wouldn't dream ov doing my own electrical work. Horses for course as my dad says. The guy who has done this work should be stoned in the streets if you ask me

  • @TheFoolishboy9
    @TheFoolishboy9 2 года назад +3

    The wiring maybe bad, but the builder did a good job on the plumbing. Would put PB plumber to shame.

    • @tentonhammer5469
      @tentonhammer5469 2 года назад +1

      No way on earth the same person is responsible for both. He got a pro in for the plumbing work was thinking the same thing about pb.

  • @mikepxg6406
    @mikepxg6406 Год назад

    Looks like a classic EU (Greek, Spanish, Italian, Maltese, polish) install to me. Having said that I would walk away I would not touch that with a barge pole......not enough 3 phase for me.

  • @mrclive5
    @mrclive5 2 года назад +1

    In the words of David Savery; "that is a cluster-f**k"!
    There are those jobs done by people with some knowledge, these tend to be untidy, but fairly safe.
    Then you get the job shown in this video where there is no knowledge and it's just an utter mess, thrown together with the cheapest materials available! No continuation of the CPC, basic insulation exposed, overloading of circuits etc.
    The problem I find nowadays is people think electrical work is easy and want it all doing for fifty quid and a pat on the back! Jog on. Pay a proper price and get a proper job done by a proper spark, we do exist! Never let the builder do it!

  • @Draxindustries1
    @Draxindustries1 2 года назад +2

    Kitchen is a complete mess. If you're going for the whole works , skim the ceiling/ walls , do any plaster board work, block sand the walls flat , clean up everything and paint the kitchen. Also fit any new architrave ect. Do all this before any fitting up. This gives a good base and if careful there's no painting around units afterwards.
    This kitchen has rough walls, woodwork, paint all over the window frames, no window sill ect and the builder has just slung the kitchen in over a complete mess.
    Outside there's crap everywhere with no sign of cleaning up as you go.
    As for the electrics Stevie Wonder could have done better.
    Imo that house is ruined with the standard of work done and the builder shouldn't be paid.

  • @callimero2409
    @callimero2409 2 года назад

    32:40 - young Hulk Hogan ,, just get him some sunglasses 😎

  • @IanFarquharson2
    @IanFarquharson2 2 года назад +1

    Rough as f😀😀😀 looks like my Howdens kitchen units, I would strongly suspect they’d drop the kitchen fitter if he’s been doing wiring too, and that badly in a notifiable area.

    • @IanFarquharson2
      @IanFarquharson2 2 года назад

      … not quite the same unis, there’s a 10mm gap between doors here, badly fitted wickes?

  • @mattjames106
    @mattjames106 2 года назад +2

    How people can get away with that? Shocking! Also I've noticed no one has mentioned those downlights are not fire rated. Might be worth swapping them out when you go back.

  • @zenaasura1769
    @zenaasura1769 2 года назад

    Hahahaaa what a nightmare. Had recently done up a fuse box like that. Was horrible.

  • @stevenbeaumont1698
    @stevenbeaumont1698 2 года назад

    how often does the stagecoach come thru. and were did he tie up his horse .

  • @prolegitgamer
    @prolegitgamer 2 года назад

    at 3:11 you have 2 15mm ball valves directly aimed at your fuse box that are not caped off, although turned off you cannot trust that. That is the most worrying thing imo. Hopefully no running water in those pipes.

    • @NBundyElectrical
      @NBundyElectrical  2 года назад +1

      Those pipes aren’t conned to anything dude , it’s new pipes for the front extension , they are being moved 👌

  • @viorelavram1685
    @viorelavram1685 Год назад

    Voltage in the UK is 230V, for a long long time now! Other than that! GREAT JOB!

    • @PhilJohn1980
      @PhilJohn1980 9 месяцев назад

      nominally it's 230 -6%/+10%, in reality, it's still 240.

  • @guywhoknows
    @guywhoknows 2 года назад

    That be builder is 10th edition. If it works or can be made to work...
    Call me lazy but I just don't have the patient to sort out that mess. I was wondering why there was two holes so close, forgot about the smoke alarm.
    That cooker hob oven combo fantastic. How can someone not be able to do math for load calculations.?
    Customers who go for the cheap quote and combined job...
    Or did they just say that as it was DIY.

  • @ass90
    @ass90 2 года назад

    This is heart breaking 🙁