Softedemy. is a company for project management, training, Planning consultancy services. Softedemy started as a training website back in 2021 and we succeeded to deliver creative learning materials and tools to our planning engineer members on the website. In August 2021, the company was officially launched to expand its website services and to provide creative project management support to construction projects. We are a team of professional planning engineers that can find a solution for every problem.
Website : www.softedemy.com
Website : www.softedemy.com
Solved Unable to Connect Database in Primavera P6| Please run the database configuration tool
🌐 WhatsApp: wa.me/+923155537580
🛒 Store Link: www.softedemy.com/Shop
📧 Email: info@softedemy.com
🌍 Website: www.softedemy.com
This video addresses the Primavera P6 Error: Unable to Connect to the Database and provides a step-by-step guide to resolving it. The tutorial covers common causes, troubleshooting techniques, and database configuration methods for both new and existing users, ensuring smooth project management in Primavera P6.
[00:00] Introduction
[00:00] Overview of the Unable to Connect Database in Primavera P6 error.
[00:15] Information on support channels for addressing the Primavera P6 database connection error, including WhatsApp, email, and the website.
[02:00] Identifying the Data...
🛒 Store Link: www.softedemy.com/Shop
📧 Email: info@softedemy.com
🌍 Website: www.softedemy.com
This video addresses the Primavera P6 Error: Unable to Connect to the Database and provides a step-by-step guide to resolving it. The tutorial covers common causes, troubleshooting techniques, and database configuration methods for both new and existing users, ensuring smooth project management in Primavera P6.
[00:00] Introduction
[00:00] Overview of the Unable to Connect Database in Primavera P6 error.
[00:15] Information on support channels for addressing the Primavera P6 database connection error, including WhatsApp, email, and the website.
[02:00] Identifying the Data...
Просмотров: 31
Видео
Primavera P6 ERROR Project file import Failed | P6 Import Error Solved! in Minutes .
Просмотров 283Месяц назад
🌐 WhatsApp: wa.me/ 923155537580 🛒 Store Link: www.softedemy.com/Shop 📧 Email: info@softedemy.com 🌍 Website: www.softedemy.com This video provides a detailed guide to resolving the Primavera P6 ERROR: Project File Import Failed. It focuses on troubleshooting P6 XER Import Errors, identifying missing or invalid WBS parent IDs, and correcting P6 Import File Validation Errors to ensure successful p...
Fixing Schedule and Performance Percent Complete Not Rolling Up (WBS Level) in Primavera P6
Просмотров 1,9 тыс.3 месяца назад
📞 Contact Us WhatsApp :wa.me/ 923155537580 🌆 Introduction to Fixing Zero Schedule Percent Complete and Performance Percent Complete at WBS Level in Primavera P6 🕰️ Identifying the Issue: Schedule Percent Complete and Performance Percent Complete are zero at the WBS level. ⚙️ Explaining the Causes: Understanding why Percent Complete shows zero in Primavera P6. 🔍 Checking for Cost-Loaded Schedule...
Assign Activity Codes in Primavera P6 with Excel (FAST & EASY!)
Просмотров 1,2 тыс.5 месяцев назад
📞 Contact Us WhatsApp :wa.me/ 923155537580 - 🌆 Introduction to assigning activity codes in Primavera P6 using Excel for efficient project management. - 🕰️ Explanation of the initial setup in Primavera P6 lacking WBS codes, setting the stage for code assignment. - ⚡️ Overview of the different types of activity codes in Primavera P6: Global, EPS, and project-specific. - 🛠️ Creation of main head c...
Automate Your Project Control: Primavera P6 to Excel Schedule Comparison ( Pro Tool) . Reports
Просмотров 1,3 тыс.7 месяцев назад
📞 Contact Us WhatsApp :wa.me/ 923155537580 🔗 Get the Tool : www.softedemy.com/product/1-primavera-p6-to-excel-schedule-comparison-dashboard-pro-tool/ Contact us on info@softedemy.com Welcome to Softedemy, your Project Control and Engineering Software Academy! In this video, we will guide you through the comprehensive features of our Schedule Comparison Dashboard Excel tool, designed to seamless...
Cumulative AT completion Total cost vs Cumulative planned value cost for recovery in Primavera P6
Просмотров 6919 месяцев назад
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Cumulative AT completion Total cost vs Cumulative planned value cost for recovery in Primavera P6 📌 Timestamps: 0:00 - Introduction to Softedemy and Overview of Today's Topic 1:00 - Comparing Cumulative At-Completion Total Cost with Cumulative Planned Value Cost 2:04 - Detailed Analysis of At-Comple...
Latest Primavera P6 23.12 Version: 6 New Features Explained | Primavera P6 Upgrades 2024 Version
Просмотров 1,2 тыс.9 месяцев назад
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Primavera P6 23.12: 6 New Features Explained | Project Management & Scheduling Upgrades Join Softedemy's detailed walkthrough of the most recent updates in Primavera P6 Version 23.12, designed to elevate your project management, scheduling, and resource allocation skills to the next level. This vide...
Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works
Просмотров 4,2 тыс.11 месяцев назад
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-03/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Interview Assignment 03 for Planning Engineer by using Primavera P6 | Building Works 1:15 - Overview of Today's Assignment 2:11 - Discussing WBS Level 3 and Long Lead Items 3:09 - Estimation of Productivity Rate and Labor Equipment Re...
Interview Assignment 02 for Planning Engineer by using Primavera P6 | Basic Planning Engineer
Просмотров 1,8 тыс.Год назад
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-02/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Interview Assignment 02 for Planning Engineer by using Primavera P6 | Basic Planning Engineer 0:00 - Introduction to Softedemy & Project Control Engineering 0:50 - Discussion on Assignments & Academic Assignments vs. Interview Assignm...
Planning Engineer Interview Assignment 01 by using Primavera P6 | Construction of Office Building
Просмотров 16 тыс.Год назад
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/p6-interview-assignment-01/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Planning Engineer Interview Assignment 01 by using Primavera P6 | Construction of Office Building 📌 Timestamps: 0:00 - Introduction to Softedemy: Project Control & Engineering Software Academy 0:50 - Overview: Planning Engineers Int...
Calculating Earned Schedule Analysis excel from Primavera P6 vs Earned Value Formula Template Sheet
Просмотров 2,9 тыс.Год назад
WhatsApp:wa.me/ 923155537580 File Link : www.softedemy.com/product/earned-schedule-analysis-excel/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Calculating Earned Schedule Analysis in Excel from Primavera P6 vs. Earned Value Formula Template Sheet 📌 Timestamps: 0:12 - Welcome & Introduction to Softedemy 0:27 - Explanation on Earned Value Management System in PMI 0:47 - ...
Earned Value Analysis in Primavera P6 | Earned Value Management EVM in Project Management | Software
Просмотров 6 тыс.Год назад
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Earned Value Analysis Sheet :www.softedemy.com/product/earned-value-analysis-sheet/ Earned Value Analysis in Primavera P6 | Earned Value Management EVM in Project Management | Software Timestamps 0:00 - Introduction to Softedemy and Project Control 0:50 - Basics of Earned Value Management Systems in...
Convert Updated Schedule into Baseline Schedule | Remove Progress from Primavera P6 Schedule
Просмотров 7 тыс.Год назад
WhatsApp:wa.me/ 923155537580 Store Link: www.softedemy.com/Shop Contact us on info@softedemy.comm Convert Update Schedule to Baseline Schedule | Remove Progress from Primavera P6 Schedule Removing Actuals in Primavera P6: We'll guide you step-by-step on how to remove actual start dates, reset remaining duration, and units to their original state. Challenges & Errors: Learn about the hurdles fac...
Resources Calculation with Productivity Rates in Projects at all Industries | Assign in Primavera P6
Просмотров 9 тыс.Год назад
WhatsApp:wa.me/ 923155537580 Productivity rates Link : www.softedemy.com/product/productivity-rates/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com Timestamps 0:00 - Introduction to Softedemy 2:45 - Types of Productivity Rates 4:24 - Duration Calculation 4:56 - Definition of Crew and Its Role 5:37 - Quantity and Crew Number Formula 6:04 - Impact of Changing Productivity Rat...
PV=EV Revised Schedule P6 Tool | Planned value Equal Earned Value | Schedule % Equal Performance %
Просмотров 5 тыс.Год назад
WhatsApp:wa.me/ 923155537580 Tool Link : www.softedemy.com/product/pv-ev-revised-schedule-p6-tool/ Store Link: www.softedemy.com/Shop Contact us on info@softedemy.com PV=EV Revised Schedule P6 Tool | Planned value Equal Earned Value | Schedule % Equal Performance % 👋 Welcome to Softedemy! In today's comprehensive guide, we dive deep into mastering project management with a focus on Planned Valu...
How to Make Actual Cost Equal to Earned Value Cost in Primavera P6 : Step by Step Method AC=EV
Просмотров 4,5 тыс.Год назад
How to Make Actual Cost Equal to Earned Value Cost in Primavera P6 : Step by Step Method AC=EV
Solving Primavera P6 Schedule % Mismatch: Aligning Excel-based S Curve and Schedule Percent Complete
Просмотров 3,6 тыс.Год назад
Solving Primavera P6 Schedule % Mismatch: Aligning Excel-based S Curve and Schedule Percent Complete
How to Use the Primavera P6 Excel Lite Tool : Transform Your Project Controls - Complete Tutorial
Просмотров 1,7 тыс.Год назад
How to Use the Primavera P6 Excel Lite Tool : Transform Your Project Controls - Complete Tutorial
Schedule Comparison Dashboard XER Tool: Analyzing and Reporting Project Progress Baseline Comparison
Просмотров 1,2 тыс.Год назад
Schedule Comparison Dashboard XER Tool: Analyzing and Reporting Project Progress Baseline Comparison
Schedule Percent Complete Calculation in Excel | Planned Percentage | WBS Formula in Primavera P6
Просмотров 7 тыс.Год назад
Schedule Percent Complete Calculation in Excel | Planned Percentage | WBS Formula in Primavera P6
Primavera P6 The import file is invalid P6 Error: Import corrupted XER file error Resolved Finally
Просмотров 4,5 тыс.Год назад
Primavera P6 The import file is invalid P6 Error: Import corrupted XER file error Resolved Finally
Detecting And Fixing Dangling Activities In Primavera P6 Time Schedule
Просмотров 3,2 тыс.Год назад
Detecting And Fixing Dangling Activities In Primavera P6 Time Schedule
From Primavera P6 Schedule to Excel: Creating Gantt Charts with XER to XLSX Tool in Excel
Просмотров 2,5 тыс.Год назад
From Primavera P6 Schedule to Excel: Creating Gantt Charts with XER to XLSX Tool in Excel
Automatically Color WBS Levels in Excel with Primavera P6 Formatting: Step-by-Step Guide
Просмотров 3,9 тыс.Год назад
Automatically Color WBS Levels in Excel with Primavera P6 Formatting: Step-by-Step Guide
How to Import Activities into P6 from Excel under Specific WBS | Add Activities to WBS in P6
Просмотров 9 тыс.Год назад
How to Import Activities into P6 from Excel under Specific WBS | Add Activities to WBS in P6
Detailed Schedule Comparison Report XER Tool: How to Compare Two Schedules of Primavera P6
Просмотров 3,4 тыс.Год назад
Detailed Schedule Comparison Report XER Tool: How to Compare Two Schedules of Primavera P6
How to Link two or more Projects in Primavera P6 | Link with Other Projects | Interlinking
Просмотров 2,6 тыс.Год назад
How to Link two or more Projects in Primavera P6 | Link with Other Projects | Interlinking
How to Combine Projects in Primavera P6 | Primavera P6 Integrated Master Schedule
Просмотров 8 тыс.Год назад
How to Combine Projects in Primavera P6 | Primavera P6 Integrated Master Schedule
How to Create S Curve Planned vs Actual from Primavera P6 to Excel
Просмотров 14 тыс.Год назад
How to Create S Curve Planned vs Actual from Primavera P6 to Excel
How to Create WBS From Excel to Primavera P6 | How to import WBS in P6
Просмотров 17 тыс.Год назад
How to Create WBS From Excel to Primavera P6 | How to import WBS in P6
Thanks Sir ❤
Welcome
Great thanks
@@mouhcenegoudjili8319 welcome
WONDERFUL HELPED ME A LOT THANKS REALLY
@@1981mudassir welcome
that is amazing . good job thanks
@@Abu_arwa_ahmed welcome
Is there any way, we can get the schedule % complete for non 7 day Callender
@sanurazin1427 yes Check l excel lite tool www.softedemy.com/shop
I have done the same steps but while I'm importing from excel my first resource for every activity is not imported I dont know why
@paventhanm1475 without looking the sheet you export .I couldn't conclude the reason
@SoftEdemy How can I share that excel sheet with you Share your Mail Id
@paventhanm1475 check what'sapp above in description of video
I am on company laptop where none of external apps are allowed. What to do
@abdainawi share this video to it and ask them to resolve this error
Great job! Thank you so much, Engineer. I also liked your layout very much; could you please share it with me? It will be appreciated.
@@mohanadberair7599 welcome
@@SoftEdemy could you share the layout with me?
@mohanadberair7599 please contact to email or WhatsApp
Instead of going through report wizard, couldn't you just copy the same data from resource usage spreadsheet?
@@saadqureshi4291 you we can copy.
Do you have any advance video for resource and cost loading and creating wightages sheet
@@saudpm40 no not yet
@@SoftEdemy what are the steps if we have scope and we asked to create resource loaded and cost loaded schedule? how do weightages work?
@saudpm40 The process cannot be explained in text . In simple the answer is apply weights on activities in excel and import. In future if we got some spare time . We will share relevant video. You can check other sources currently
Also share the duration type you have selected
@saudpm40 its 5 year old video please check latest earned value and S curve videos. Moreover duration type suitable for construction industry is fixed duration and units. Units/time should be relaxed. Moreover in revise schedule or recovery baseline resource assignment can be assigned new. Any baseline can have resource assignment but an updated schedule should not change its resource or relationship rather scope change
@@SoftEdemy so you mean when we are preparing resource loaded schedule we should have Fixed Duration &units/time
@saudpm40 duration and units should be decided by planner and loaded into the schedule and should be fixed so it's should not change later
Why have you assigned resources after baselining and updating schedule should resoirce assignment not be before baselining and updating?
@saudpm40 it's an old video please disregard if their is mistake in explanation.check my latest earned value videos and S curve videos
@@SoftEdemy apologize if its a wrong question brother please share latest video
@saudpm40 ruclips.net/video/0jJ3ceEJyMY/видео.htmlsi=gTskBj_A9fs86gx3 Earned value video
@saudpm40 ruclips.net/video/Snnk_VU-hyE/видео.htmlsi=jJUPGrLi4df6AHja Earned schedule
@saudpm40 ruclips.net/video/sJ-Xkfq2Ojs/видео.htmlsi=5RhWhXtSICz0gJj4 Planned and actual s curve Please note that planned are from baseline whatever you have assigned. Where ever this word used
Thank you so much. I was getting this problem, after following the instructions, I was able to solve my problem.
@@kasasapeter9649 welcome
Thanks for this! This should be even default function!!
@@hiroshi-today yes
Thanks Bro it is very useful
@@aliebrahimi787 welcome
Thanks, great video, I was looking for a long time for a solution to this problem.
@@camiloalejandroamigo2436 welcome
thanks sir
@@muhammadalikhan4011 welcome
Great work Faisal bhai keep it up
@@engrmuhammadzahidabbas2258 welcome
I noticed you're using Global Change to reduce the original duration of activities and have applied a filter for activity status not equal to 'Completed.' However, this approach also impacts in-progress activities. My question is: when the % Complete Type is set to 'Physical,' reducing the original duration of in-progress activities doesn't affect their finish date because the remaining duration remains unchanged, and the finish date is calculated based on the remaining duration. How can we effectively perform crashing for these in-progress activities as well? please correct me if i am wrong. also let us know easy method to do crashing or fast tracking, as I have 40,000 activities schedule.
@mohdmuzu142 I don't think you fully understood the video. There are many additions and changes required, and we will update the content to provide more comprehensive details. First, there is no filter in the global change for setting the activity status as "not equal to completed." Second, we never instructed you to change the percentage. Please review the formula used to calculate the new start date and remaining duration. A lot of important details were missing due to video editing. For a more thorough understanding, please refer to the article where the process is described in detail. However, before closing, I must emphasize that this is not the final version. We plan to release an updated tutorial, which might take some time, but the technique is now more refined and detailed. Keep in mind that this is an older video, but it may still be useful for certain cases or projects. If it helps you, feel free to continue using it; otherwise, consider updating the method.
Dear Sir, Do you have any active promo code?
@@sagarkeysung please contact on whatsapp wa.me/+923155537580
AOA Sir, kindly advise, how to view overall project percentage in wbs level if we choose physical percent complete?
@sagarkeysung check in performance percent complete column
@@sagarkeysung because physical percent complete column by itself donot use EVM
How u add A - integer??
@@hamzarehman4948 user defined field column
Thank you for sharing great help!
Welcome
Question. How much time did you save between creating the WBS via Excel then Importing versus creating the WBS Directly in P6?
@leotrinidad7815 I use my excel lite tool.for this purpose save 90 percent time check www.softedemy.com/shop
Keep it Up.
@@PUBGWARRIORERA thanks
Hope for a detailed course on Power BI for Planning Engineers on your channel.
Sure .
Can we add these activity steps in to a bulk number of Activities, For Example, same activity steps need to be added to 1000 activities at once. Do they need to add activity by activity
@thusharakumarasinghe9869 yes in bulk can be added
I have a question: Where can we put the awarded value of individual items in our P6 project, and what is the spending plan? According to my understanding, the spending plan is the value we spend against the awarded value which is fixed.
@ankushsharma9280 these options or for finance. Use EVM instead of it
@@SoftEdemy can u share the link for EVM. and cost account is not helpful for planning engineers.
Not one specific video the evm is explained their check other cost loading video ruclips.net/video/0jJ3ceEJyMY/видео.htmlsi=-dMTEcuRjwLPQP8a
Very helpful thanks
Thank you
So weel explained, thank you so much! greetings from México
@@fernandomares1049 welcome
The first time I tried, I failed. But on my second attempt, I succeeded by making a small change. I noticed that the sequence number (Seq-Num) was set to 0 in the notepad, so I changed it to 6, as shown in the data sheet.
@@razamalik5719 yes
Great video...gain lot of knowledge....thank you sir for this valuable content
Welcome
It halts on 30% :(
Check again for wbs short code and id
can you share the excel sheet which you imported into the P6
@hannanmohsin3303 it's an old video. The file may be deleted
@@SoftEdemy i want to upload boq from excel like you did tell me how can I do it?
@@hannanmohsin3303 share the details at our contact
@@SoftEdemy you mean at your email address?
@@hannanmohsin3303 whatsapp email any
Very useful
@@azeezjep thank
👍🏻
Thanks
Thank you sir it was very helpful...
@@tabletkhan4549 welcome
my P6 dont have the Est.Weight column, I've looked up in the general but cant found any
@SyahidatulFilzahBtAbdulKadir please contact to Softedemy support to check the issue wa.me/+923155537580
Wow wow wow I got it finallyyyyy. Thank you my brother ❤❤❤❤
@@eatsleepyoutuberepeat4226 welcome
Thanks
@@karthikm5878 welcome
Thanks a lot. I was confused why the cumulative of the Schedule % complete and Performance % complete not shown… now am cleared that without cost loading it will not shows… thanks a lot 🙏🏻🙏🏻✌️
@@eatsleepyoutuberepeat4226 welcome
Great video! Question, how to you import activities along with WBS?
@@artistdigital add wbs ids with activities from P6 . Check other videos from our channel
@@SoftEdemy Yes, i found it and I subscribed as well! Thank you. Your videos are really unique. Your channel deserves success. I will be watching all the videos and not skipping the ads
@@artistdigital thanks
Thank you very much for posting. I've tried a few times, however I must be entering incorrectly because nothing is importing. I'm trying to enter in procurement sections in a project with WBS already in. Can you explain the numbering? Parent? Short? Thank you in advance
Try again
Brother you missed the WBS summary. It also type of activity
@eatsleepyoutuberepeat4226 yes .you can learn also that
Salaam sir, i going to face interview but i didn't do that course can i get based on fundamental basic knowledge regarding primavera..? Please help me to crack down interview sir😊
@syeedaijaz1 yes. No issue just learn theoretical questions. Nobody have time to judge your skills. Even the interview may donot have such a skill so he can judge your skill. So don't worry. Speek what you want. The issue actual in saudi currently is demand is high and supply is less. This competition raises salaries. Even everyone then converting to planners field. So already existing managers are also hired like that. Donot worry . You will Crack it 100 percent sure. They just need someone to visit and their personal for project should be filled just.
Thanks a lot. You supported me really through WhatsApp also 😊😊
@@eatsleepyoutuberepeat4226 welcome
Thank u so much What is the difference between press Yes or No in msg All nonlabor have been deleted? What is that msg means?
@mohamedbabikir3136 when a resource assigned with budgeted units and actual units. P6 Always ask again permission.
Very good❤
@@mohammedabualhaj7339 thanks
one suggestion for you sir your content are deep in knowledge but your english is not so good so try to explain in urdu or hindi that will better ....Please dont feel bad for my suggestion
@danishhasware3762 this is very old video . Don't worry you can check our latest video. I hope you will not disappointed. Moreover their is one lesson that if you are not in good something don't leave it . Try your best to improve it. Similar in P6 donot leave it if you don't perform currently
Moreover we cannot replace our previous content that due to language issues. The content will be their always but I will this topic will be revised in future
Sir please add lecture number to every vedio,, it's quit Confusanable without index number
@user-cw2cw9fv4s playlist are added. These are Random topics on viewers comments. Complete videos series's are in playlist already with video number and at our site with sequence