Goregaon Mulund Link Road Project Update | Goregaon Mulund Link Road Progress

Поделиться
HTML-код
  • Опубликовано: 13 сен 2024
  • oregaon-Mulund Link Road (GMLR) is a 12-km long road infrastructure project that will connect Mulund directly to Goregaon. After, Ghodbunder road, Jogeshwari-Vikhroli Link Road (JVLR), and Santacruz Chembur Link Road, GMLR is the fourth east to the west corridor in Mumbai.
    The total estimated cost of the project is 6,225 crores1. It will reduce the traffic congestion and cut down the travelling time. As of now, it takes 80 minutes to travel from Mulund to Goregaon. Once the new road of GMLR is operational, this travel time will be reduced to as quick as 20 minutes.
    Support Us (UPI) - droneman@ibl
    Support Us by Joining Our Patreon : / droneman
    Connect me on -
    Twitter - / dronemanyt
    Instagram - / dronemanyt
    Get 1 month Free access
    Epidemic Sound Music Link - share.epidemics...
    #GMLR
    #goregaon
    #droneman
    Goregaon Mulund Link Road Project
    Goregaon Mulund Link Road Project Update
    Goregaon Mulund Link Road Project Progress
    Goregaon Mulund Link Road Project Latest Update
    Goregaon Mulund Link Road Project Ground Report

Комментарии • 136

  • @arifmomin9199
    @arifmomin9199 10 месяцев назад +76

    This will be a great relief for Mumbaikars post completion. We would also like an update pertaining to the Thane Borivali project. I personally feel Thane Borivali is an extremely critical project for all of us

    • @ap2149
      @ap2149 10 месяцев назад +8

      TBLR will be the most important link for suburban residents..

    • @rohit_rds
      @rohit_rds 10 месяцев назад +1

      Is it a Local train project ?

    • @Useranonymous23907
      @Useranonymous23907 9 месяцев назад

      Mumbai city’s 3 airport / Immense revenue generating project
      Chances are bright for Much needed international airport at Dapchari, Palghar (passenger+ cargo) due to constantly heavy growing passenger air traffic as Mumbai city is expanding and spreading .

    • @nikhilchikkmath
      @nikhilchikkmath 9 месяцев назад +1

      ​@@Useranonymous23907Palghar doesn't come in Mumbai and there is no need for an airport in a village like Palghar, pathetic idea!!🤘

    • @ChiSa123
      @ChiSa123 9 месяцев назад +1

      ​@@nikhilchikkmath Yeah better to accelerate Pune Airport I think as it was initially proposed to be mainly a cargo airport!

  • @phoenix_tech-y7z
    @phoenix_tech-y7z 10 месяцев назад +15

    East west connectivity by metro and locals is required. Only roads are not going to reduce congestion and travel time.

  • @rajpawar9343
    @rajpawar9343 10 месяцев назад +10

    Problem is these type of projects looks good in damn CAD renders but in reality they're often messed up.

  • @vedants.vispute77
    @vedants.vispute77 10 месяцев назад +20

    Lack of interchanges in the city is one of the main problems in the city. Highways/Freeways should not have any traffic signals.

  • @APK81
    @APK81 10 месяцев назад +3

    breathtaking photography...cinematic visuals when ur drone passes by those skycrapers

  • @ChetanAptesVLogs
    @ChetanAptesVLogs 10 месяцев назад +4

    Long awaited project coming into reality. I had been hearing about this link road since 2007! Like I always say, keep spreading happiness!!

  • @PUNSHIBAROT
    @PUNSHIBAROT 10 месяцев назад +5

    Mumbai real-estate price have become so costly that after few decades only rich people will live in Mumbai, even Navi-Mumbai and Thane have become very costly. Government should improve connectivity from Dombivili, badlapur to Mumbai.

    • @jamesgeorge777
      @jamesgeorge777 10 месяцев назад

      The Magenta Line - Mumbai Metro Line 14 - Kanjurmarg to Badlapur (Via Koparkhairane-Ghansoli, Mahape, Shilphata, Palava, Dombivili, Kalyan, Ambarnath) will solve the connectivity issue.

  • @mayurvichare841
    @mayurvichare841 10 месяцев назад +2

    Thank you, for bringing all of these projects,keep it up👍

  • @dhawalsinghrawat8582
    @dhawalsinghrawat8582 10 месяцев назад +11

    Also show the goregaon east phase side work of goregaon mulund flyover... Alot of work happened this year.
    Thank you

  • @jyothathi9566
    @jyothathi9566 10 месяцев назад +6

    Crucial Road projects in Mumbai should had been completed atleast 20 years ago. Its very much surprising why Governments neglected road development in a city withh humongous population.
    Just see the roads of NCR!

    • @omkart8853
      @omkart8853 10 месяцев назад

      western side property rates > eastern side property rates.
      if they join both sides in 15-20 minutes, property rates of western side will decrease.

    • @dailysanity1523
      @dailysanity1523 9 месяцев назад

      ​@@omkart8853or maybe eastern will just increase?

  • @vdiitd
    @vdiitd 10 месяцев назад +2

    Hopefully this will complete in 20 years.

  • @shazzadmiah8907
    @shazzadmiah8907 9 месяцев назад +1

    Your all the videos are so much best brother love India

  • @jaishmohammad2255
    @jaishmohammad2255 10 месяцев назад +2

    The way you explain route is damn bro 🙌🏻❤️

  • @Luxzshisha
    @Luxzshisha 10 месяцев назад +5

    coastal road project ki update
    &
    mumbai trans harbour ki update

  • @BabluYadav-rm6tu
    @BabluYadav-rm6tu 10 месяцев назад +5

    Varsova - jogeshwari -vikroli
    Malad -mulund
    Boriwali -thane
    Teen road ban jayega to pollution kam hoga ,,east west grid type 3 road ,,
    Chembur - sqntacruez bhi hai ,,andheri -ghatjoper bhi hai east west ke liye

  • @tusharmahaley
    @tusharmahaley 10 месяцев назад +4

    All these infra projects should have completed by 2010. It’s too late.

  • @jaymaharashtra1991
    @jaymaharashtra1991 10 месяцев назад +1

    Vikhroli -Ghansoli link and extended palm beach pe ek video banaye please @droneman

  • @VikramSingh-fd9uj
    @VikramSingh-fd9uj 10 месяцев назад +9

    MH gov should come out of sick mindset of keeping the things within Mumbai only. This is problem for all people. Everything is saturated, even if you build a new mumbai on 1st floor it will not be sufficient.
    Companies should go outside of mumbai, even gov should give them incentives on this.

    • @birderbhushan893
      @birderbhushan893 10 месяцев назад

      totally right mumbai is not having enough space for Devlopment

  • @warishislxlr
    @warishislxlr 10 месяцев назад +5

    Next Coastal road update

  • @VishwajeetSBehera
    @VishwajeetSBehera 7 месяцев назад

    Very nicely project explained, in professional way. Keep it up

  • @sandeepjoshi6083
    @sandeepjoshi6083 10 месяцев назад +2

    Great initiative

  • @Oh_Sauda_I_Recognized_You
    @Oh_Sauda_I_Recognized_You 10 месяцев назад +1

    Great Camera Work Droneman.

  • @mukul_jayshreefoundation1542
    @mukul_jayshreefoundation1542 9 месяцев назад

    very well prepared video! thanks guys.

  • @sgmishra72
    @sgmishra72 10 месяцев назад +2

    Sir, with your channel, I would like to tell you that Metro Railway stations between Andheri East and Dahisar is built to benefit the formidable nexus builders, politicians and corrupt officials.
    Two stations namely Akurli( Ban Dongri) and poisar( opposite Narsipada slum, each at a distance of 300 meters from Akurli Road, but no station for next 1.5 kilometres.
    Deliberately no station is given to thousands staying in Thakur Village, Samta Nagarand Thakur Complex.
    Why, the locations and bus stops actually the most footfalls and convenient locations are ignored.
    Mahindra Gate and Saidham( Dattani Park)
    Both conveniently ignored.
    Why
    Now Sethia Builders have started from one corner of Narsi pada slum, they build skyscrapers,
    Ban-dongari slum was redeveloped in the same way.
    Pathan-wadi is named as dindoshi station
    Virwani is renamed as Aarey.
    Mahananda Dairy( Vanrai) is renamed as Goregaon East. Shankar wadi as Mogra, why? Who is dictating terms to Metromen? Why Metro from Cuffe parade is not linked to Dahisar?
    In long run, it is not going to benefit our locations.😢
    Everything is so confusing.
    I give zero mark to this project 4:31

  • @PujanPatel001
    @PujanPatel001 10 месяцев назад +1

    Please make a similar video on the Worli-Sewri connector ... I have seen, significant progress has been made on that, so some drone footage would be nice! Good work

  • @harshadparikh
    @harshadparikh 10 месяцев назад +1

    Also there is work on Thane-Sanjay Gandhi national park highway work is also going on. Can you please make video on this project also. First of all we want to know is there any concrete work has commenced on this project.

  • @Sun56736
    @Sun56736 9 месяцев назад

    Very beautiful detailed Vedio , this Vedio much awaited , please keep give regular updates on this game changing project .
    There’s lots of Real Estate development happening in both end , Mulund side is more prominently connected to commercial & residential hub Thane , Kalyan - Dombivali- Bhiwandi , Navi Mumbai & other suburbs of Mumbai- Vikhroli Powai etc
    This Marvellous Infra Project will improve East - west connectivity & there will be phenomenal Real estate boom witnessing in these areas in coming time 🙏✨

  • @TheBabar952
    @TheBabar952 10 месяцев назад

    Watching ur videos are great delight...

    • @dronemanYT
      @dronemanYT  10 месяцев назад

      Thank you so much 😀

  • @CivilTechnoIndia
    @CivilTechnoIndia 10 месяцев назад

    Great presentation💯👍

    • @dronemanYT
      @dronemanYT  10 месяцев назад

      Glad you liked it

  • @swagatsawant
    @swagatsawant 10 месяцев назад +1

    🤔
    Any update on Vikhroli- Ghansoli Creek Bridge?

  • @trueindian510
    @trueindian510 5 месяцев назад

    They should make one metro line also from malad west to airoli to dombivili.

  • @VALAR_Morgulis.
    @VALAR_Morgulis. 10 месяцев назад +1

    So much progress happening in coastal road project please update
    Coastal road project almost got a shape please make a video

  • @ididnotgetabetterid
    @ididnotgetabetterid 10 месяцев назад +1

    What about Thane Borivali link road?

  • @booksquotes948
    @booksquotes948 7 месяцев назад +1

    We need goregaon mulund metro similar to versiva ghatkopar. Roads r of no use to majority.

  • @nileshborate9
    @nileshborate9 10 месяцев назад +1

    Please cover Thane vadape road extension connecting to samruddhi expressway

  • @ambarukanasubrahmanyam51
    @ambarukanasubrahmanyam51 8 месяцев назад

    Nice 👍

  • @AmiteshRaikwar
    @AmiteshRaikwar 10 месяцев назад

    Please make video of Bengaluru electronic city suburbs project from Bengaluru junction - Baiyapanahalli Railway station to Anekal Road Railway station

  • @_bharat_rashtriya_edtiz_
    @_bharat_rashtriya_edtiz_ 10 месяцев назад

    Beautiful skyline in thumbnail.

    • @dronemanYT
      @dronemanYT  10 месяцев назад +1

      Glad you like it!

  • @Oh_Sauda_I_Recognized_You
    @Oh_Sauda_I_Recognized_You 10 месяцев назад

    Excellent updates

  • @amarjitpatil
    @amarjitpatil 10 месяцев назад +1

    Kindly please update of Miraj Pune Kolhapur railway track doubling

  • @shivajizaltte4986
    @shivajizaltte4986 10 месяцев назад

    नमस्कार, यह मार्ग बन जायेगा तो हम वेस्टर्न मे रहने वालोको राहत मिल जायेगी, इस प्रोजेक्ट का रिपोट 3 3 महीने मे देते रहियगा. धन्यवाद.

  • @satyamsuryawanshiofficial
    @satyamsuryawanshiofficial 10 месяцев назад +1

    I was working For widening part of this project
    Small correction for information as project was started in 2019 and widening part is already completed only some part are pending due to encroachment which is handover to on going bridge construction of this project (other than Nahur ROB)
    tunnel part was about to start soon.

  • @bbttyy
    @bbttyy 10 месяцев назад +1

    Jvlr metro plss

  • @sanketgujrathi3168
    @sanketgujrathi3168 10 месяцев назад

    Can you please take some diwali drone shots of mumbai of evening. We would love to see that.

  • @sreekanthjinka2899
    @sreekanthjinka2899 10 месяцев назад

    Thanks for update.

  • @For_greater_good
    @For_greater_good 10 месяцев назад

    Yes thank you

  • @ameykulkarni8005
    @ameykulkarni8005 5 месяцев назад

    Any video on further and latest update of Goregaon Mulund linking road?

  • @oviann
    @oviann 6 месяцев назад

    I like be close to Inorbit Mall and have a bungalow in Panvel , this link road will cut my travel time by nearly 1 hour , what used to take me 2 hrs 15 minutes, I will be able to reach my destination in 1hr 15 minutes, just waiting for this road to be completed

  • @abdulshaikh283
    @abdulshaikh283 10 месяцев назад

    Raipur dhanbad expressway pe bhi video banao plz

  • @sidh089
    @sidh089 10 месяцев назад

    good info thank u

  • @ameyapatil2424
    @ameyapatil2424 10 месяцев назад

    Sir Kharghar - Turbhe Tunnel kaa bhi same video banaiye please.

  • @Ankit_Maurya_12
    @Ankit_Maurya_12 6 месяцев назад

    What happened to tikujiniwadi borivili underground road???

  • @mehullll
    @mehullll 10 месяцев назад

    Goregaon side also work has started of bridge making

  • @Ck069
    @Ck069 10 месяцев назад

    Sabas sirji

  • @akinomato
    @akinomato 10 месяцев назад

    Please make video on Panvel Karjat rail line

  • @sumannewasker-5982
    @sumannewasker-5982 10 месяцев назад

    Aise hi Western harbour new Mumbai connectivity hai kya

  • @deepak8925
    @deepak8925 10 месяцев назад

    Puchne mai bhi darr lag raha hai, lekin any update on completion date? 😁

  • @sumannewasker-5982
    @sumannewasker-5982 10 месяцев назад

    Borivali se vashi Jana hai to easy and time saving route hai kya, nahi hai to possible nahi hai kya, metro 2 line hone wali hai but kab

  • @shahnawazshaikh399
    @shahnawazshaikh399 10 месяцев назад

    Mumbai coastal road ki video kab aayegi?

  • @thejummogamers6620
    @thejummogamers6620 10 месяцев назад

    Dada..Mumbai coastal roud dekaye

  • @DhavelPatel-z2z
    @DhavelPatel-z2z 10 месяцев назад

    Delhi Mumbai express way , vadodara to virar package 1 to 9 update

  • @natureis4062
    @natureis4062 10 месяцев назад +1

    Why all construction are always in Mumbai

    • @user-jn7bq8wh1e
      @user-jn7bq8wh1e 10 месяцев назад +1

      Thousands of people and business come to mumbai every month for work and development
      Its a port city
      So infrastructure had yo be obviously upto the standards....
      No major infra has happened for quite a long time..
      As people and business increase ..so does congestion
      So u need to keep upgrading...
      Mumbai alone contributes to 300Bn $ to our economy

  • @worldisbeautiful5006
    @worldisbeautiful5006 10 месяцев назад

    Iss road pe bikes allowed rahegi kya ? Aur kab Tak ye road banake complate hojayega ?

  • @O0O0-Il
    @O0O0-Il 10 месяцев назад +1

    🚩✋ध्यान दें 👉BCCI richest crickets board with net worth$ 2.1 Billions and Richest Football Federation right now is 👉England with net worth $ 1.1 Billions... 🤔👉जबकि Rank one cricketer Virat Kohli net worth 126 millions only
    And 👉Rank 1 and 2 football players Ronaldo net worth 849 millions,, Messi 650 millions,, huge gap
    Football mein itna Paisa hai agar hamari govt. Dhyan de to AIFF duniya ka sabse richest Football Federation ban sakta hai with estimated net worth 5 Billion to 10 billions plus😮😮rrr😊😊

  • @abhijeetshinde4967
    @abhijeetshinde4967 10 месяцев назад

    Upload video on 5th and 6 th line of western local

  • @change9929
    @change9929 8 дней назад

    Do it fast.At least do something fast.This project has blocked all traffic movement.

  • @deepakjoshi6357
    @deepakjoshi6357 5 месяцев назад

    Please update current update status

  • @INVINCIBLE_MIX
    @INVINCIBLE_MIX 10 месяцев назад

    ye kaisa update tha????

  • @nitinshakya22
    @nitinshakya22 10 месяцев назад

    Narmada expressway ka update kab aayega

  • @madhavbhat1950
    @madhavbhat1950 10 месяцев назад

    all new such roads are a temporary relie

  • @sajjanpratipalak
    @sajjanpratipalak 10 месяцев назад

    Sir 60 % work completed from Goregaon side ?

  • @wasikhan7408
    @wasikhan7408 10 месяцев назад

    Bro please update on Navi Mumbai international airport please 🥺

  • @dineshhaldawnekar8542
    @dineshhaldawnekar8542 10 месяцев назад

    Basically koyi kaam nahi hua hai, aur koyi deadline bhi nahi hai. Ane wale do pidhiyon tak chalta rahega kaam, BMC ka. Usase jaldi hua to unka naam kharab hoga. Aap duss saal baad bhi yahi same update upload karen.

  • @bhavinssha89
    @bhavinssha89 10 месяцев назад +1

    Need This Road Before 5 Years. BMC Sleeping 😂

  • @raviprakashvijay3093
    @raviprakashvijay3093 10 месяцев назад

    Completion of this project?

  • @dhyeynaik1170
    @dhyeynaik1170 10 месяцев назад

    What happened to delhi mumbai expressway package 10 9 8......

    • @dronemanYT
      @dronemanYT  10 месяцев назад

      will continue soon

  • @ramtamodkar1624
    @ramtamodkar1624 10 месяцев назад

    Virar to Badlapur panvel tunnel road update please

  • @PA-wt2ul
    @PA-wt2ul 10 месяцев назад

    Which model of drone is this?

  • @chebha1
    @chebha1 10 месяцев назад

    what is the timeline for completion ?

  • @Steven-lp6nf
    @Steven-lp6nf 10 месяцев назад

    Versova Bandra sea link.. :)

  • @sameergawdevlogs
    @sameergawdevlogs 10 месяцев назад

    Link Road dekhna hai aajao droneman dikha denge 😅🤘🏻🤘🏻🤘🏻

  • @ramboviews
    @ramboviews 10 месяцев назад

    Goregaon side me bhi kam chalu hai ..

    • @dronemanYT
      @dronemanYT  10 месяцев назад +1

      thanks for the info

  • @whitefloatinglotus
    @whitefloatinglotus 10 месяцев назад +2

    Ghodbandar ka wohi haal rahega ye bane ke baadh bhi

  • @HonestSatish
    @HonestSatish 10 месяцев назад

    Anything happening for Pune Sambhaji nagar expressway? #AskDroneman

    • @dronemanYT
      @dronemanYT  10 месяцев назад +2

      land acquisition is in progress

  • @busywithoutwork
    @busywithoutwork 10 месяцев назад

    Modi heytho sab mumkin hei

  • @abhijitsonone6481
    @abhijitsonone6481 10 месяцев назад

    I hearing this since last 15 years but still no action against this. Igore this, nothing going to happen due to lack of govt will power.

  • @Iinshort99
    @Iinshort99 10 месяцев назад

    Bhai Mumbai me koi project Complete kyo nhi hota

    • @BabluYadav-rm6tu
      @BabluYadav-rm6tu 10 месяцев назад

      Vasooli thukre ka magic hai,, totla pawar bhi vasooli kareta suparnkha sule ke liye ,, Marathi voter hi gunde mafia vasooli kutto dawood gurga ko vote karte hai ,,isliye project late hote hai .. running traffic mein project making slow hota hai... poora vasooli tantra havi hai Maharashtra Infra making mein...court bhk vasooli karta hai environment ke chiplandu bhi infra projects ko hault pe dalte hai...sabse bade dusman environment ke chiplandu hai .

    • @vasishthabirari3469
      @vasishthabirari3469 10 месяцев назад

      The speed of construction is very slow
      That's why

    • @Shubhamrawat364
      @Shubhamrawat364 10 месяцев назад

      ​@@vasishthabirari3469because all the projects in main Mumbai city are brownfield matlab ki All the construction has to be done in a 24X7 working and moving city which will definitely delay projects to some extent.

    • @vasishthabirari3469
      @vasishthabirari3469 10 месяцев назад

      @@Shubhamrawat364 yeah that is true and yeah some big project in mumbai will completed by next year

  • @Useranonymous23907
    @Useranonymous23907 9 месяцев назад

    Mumbai city’s 3 airport / Immense revenue generating project
    Chances are bright for Much needed international airport at Dapchari, Palghar (passenger+ cargo) due to constantly heavy growing passenger air traffic as Mumbai city is expanding and spreading .

  • @R110586
    @R110586 2 месяца назад

    2050 Completion?😢

  • @sandeepjoshi6083
    @sandeepjoshi6083 10 месяцев назад

    Timelines also

  • @madhavbhat1950
    @madhavbhat1950 10 месяцев назад

    all such roads are temporary reliefs.

  • @avanishsharma1701
    @avanishsharma1701 10 месяцев назад

    ये बनेगा 2085 में 😅

  • @ParthParab-cy1hx
    @ParthParab-cy1hx 10 месяцев назад +1

    @droneman at starting you showed Mumbai local train shot that shot is from which video?

    • @dronemanYT
      @dronemanYT  10 месяцев назад +1

      That was diffrent shot,, i never used that one,, first time using in this video

    • @ParthParab-cy1hx
      @ParthParab-cy1hx 10 месяцев назад

      @@dronemanYT thanks for answering you should upload it it was great shot thanks for showing the upgrading 🇮🇳 great work you deserve more and more subscribers ✨👍🏻 great work 🙌🏻✨

  • @namangups99
    @namangups99 10 месяцев назад

    Mumbai looks like jungle of buildings with no road network 😂

  • @GeekyVicky
    @GeekyVicky 10 месяцев назад

    2027 coming!

  • @AP-do6sv
    @AP-do6sv 10 месяцев назад

    2035 se pehle nai banega

  • @ujjwal_honkan
    @ujjwal_honkan 10 месяцев назад

    This seems only 1% progress.

  • @arghyadipray5278
    @arghyadipray5278 10 месяцев назад +3

    Mulund 😂 what a name

    • @user-jn7bq8wh1e
      @user-jn7bq8wh1e 10 месяцев назад

      ?!
      What's so funny?

    • @arghyadipray5278
      @arghyadipray5278 10 месяцев назад

      @@user-jn7bq8wh1e mu-lund

    • @PlasmodiumV
      @PlasmodiumV 10 месяцев назад

      @@user-jn7bq8wh1e lund mean 'dick/penis' in Hindi

  • @lankeshshinde3798
    @lankeshshinde3798 10 месяцев назад

    Eknath Shinde is working Tirelessly.
    In 2.5 yrs UDDHAV THACKERAY DESTROYED every Mumbaikars DREAM 🤬 by stopping all projects from METRO to SAMRUDDHI.

  • @krs_94
    @krs_94 10 месяцев назад

    झवन्या मलाड नाही मालाड असं नाव आहे ते जरा मराठी नाव नीट उच्चारत जत जा सगळ्या मराठी नावाची वाट लावतो आहेस. 🔥