Cisco StackWise - Stacking Cisco 3750X Switches and Verification Commands
HTML-код
- Опубликовано: 11 июл 2024
- In this video i am using Cisco 3750x switches to explain how to stack 4 switches and verify the operation of the stack. The CLI commands that I am using here are very useful to verify the stack operation.
Appreciate the video.. simple and nice.. pls keep making video tutorials
Thank you, I will
Excellent explanation! I do have a question- How do I prevent the stack from changing switches order in the stack? For example, I want switch 2 to remain the same number even though we lose switch 1. Is that based on switch priority?
Switch number won’t change as they are associated with port number too. Where did you see it changed ? Can you share the output for the command line please
Appreciate your efforts helps lot this video few clarifications , if having multiple switch Al flash need the newer iOS or only one switch flash should have mast iOS other stackable use the same , or any other way to boot the iOS from centralized store pls guide
yes. when you do a code upgrade the new code will be upgraded into the master stack and other stack members will pull the code from the master. It is the design by default. uploading the code into each flash will chock up your network bandwidth if you are doing code upgraded for 100s of switches in a campus envt.
How do you setup which one is priority???
switch#switch 2 priority
Switch Priority
Master 15
other switches 14 - 1
Cisco stack can have upto 9 switches in a stack