  • This method is based on years of quantity calculation of various projects and is a totally approximate method which can be used for quick estimation for budgeting and approval purpose. I hope you liked this video
    Please like share and subscribe for more videos.
    please watch
    Detailing of continuous beams : • Typical detailing of c...
    Watch other videos
    Design of T beams - • DESIGN OF T-BEAMS COMP...
    Design of two way continuous slabs : • Design of Two Way cont...
    Design of one way continuous slabs : • DESIGN OF CONTINUOUS O...
    Design of two way slabs : • DESIGN OF TWO WAY SLAB...
    Design of RCC Columns : • DESIGN OF RCC COLUMNS ...
    Design of stirrups in beams : • DESIGN OF SHEAR REINFO...
    Design of one way slabs : • DESIGN OF ONE WAY SLAB...
    Follow me on Instagram : @everything.civil
    For more news and more updates.

Комментарии • 15

  • @sanketborade5583
    @sanketborade5583 4 года назад

    Thank you so much for this information brother... Keep growing...

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Means a lot. Keep supporting dear.🙏❤️

  • @rahulmhapralkar1137
    @rahulmhapralkar1137 4 года назад

    Thank you it is very helpful please make more video for other construction material as well.👍

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      Sure I will. What materials would you like to know?

    • @rahulmhapralkar1137
      @rahulmhapralkar1137 4 года назад

      @@EverythingCivil plumbing or electrical conduit materials

  • @yasirzhari2523
    @yasirzhari2523 4 года назад

    Good explanation bro keep it up

  • @chintanpatel5087
    @chintanpatel5087 4 года назад

    Sir ,from which code did you bring this information ?would u pls share with me?

    • @EverythingCivil
      @EverythingCivil  4 года назад +1

      It's a thumb rule based on various estimators and many similar projects.

  • @biswajitdebnath6860
    @biswajitdebnath6860 Год назад

    What is the reference of thumb rule and what about repetitions

  • @mohammadkhorshedalam133
    @mohammadkhorshedalam133 4 года назад

    Shuttering area = 2.4*floor area seems too much?

    • @EverythingCivil
      @EverythingCivil  4 года назад

      Hello Mr. Alam
      The factor 2.4 includes the slab area, beam sides, beam soffits, column shuttering, and the wastage also.
      Please feel free to share any workings you have.
      Thanks.

    • @mohammadkhorshedalam133
      @mohammadkhorshedalam133 4 года назад

      @@EverythingCivil still it is very high as the slab area is 95%. So beam,beam sides, beam soffits, column shuttering, and the wastage are very small compare to flooe area.May be a factor of 1.5-1.6 is ok seems to me.

    • @chatur80
      @chatur80 3 года назад

      @@EverythingCivil does it include shuttering for staircase also?? what about shuttering calculation in case we go for basement shuttering bcoz we have retaining walls as well? Kindly reply