  • @jacquesg4494
    @jacquesg4494 Год назад +5

    I am a QS of 39 years practicing in the Seychelles Islands, with a BSc Degree from UK (1984), Greenwich University London.
    I use about similar approaches and find the videos very interesting and picked up a few tips myself. I recommend them for those requiring guidance.

    • @CEPQS
      @CEPQS  Год назад

      Best of luck and I’m honored to have you recommending CEP’s content. All the best 🙏👍

  • @aphelelembongwana548
    @aphelelembongwana548 2 года назад +12

    Thank you so much for this presentation, it has really equipped me in sharpening my estimating skills as a Junior Quantity Surveyor & Estimator. Love and light from South Africa. 🙏

    • @CEPQS
      @CEPQS  2 года назад +2

      Thank you for watching brother and wish you all the best. 🙏

    • @ndumisosnooks
      @ndumisosnooks 8 месяцев назад

      Angzama bafo ngespani. I have national diploma in building

  • @sheedyasarahamed2470
    @sheedyasarahamed2470 2 года назад +1

    Thanks dear Ahamed Adel I got studied and more information from this video. Please don't stop this.
    I ask Duaa from Allah he want to give you good health and wealth

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 🙏🙂. Wish you all the best inshallah. Appreciate your kind support 🙏👍

  • @olorunyomisalami1970
    @olorunyomisalami1970 2 месяца назад

    Your explanation is impactful. Am watching this video from Nigeria. Thanks for sharing your knowledge with us. God bless you

    • @CEPQS
      @CEPQS  2 месяца назад +1

      Thank you for watching and for your kind words 😊

  • @Eli-mw3fh
    @Eli-mw3fh 2 года назад +5

    Great presentation once again. In my days as a student, I would have found so much value in this channel and I do even now. I hope those still studying or have an interest in being Quantity Surveyors appreciate the great work you are doing.

    • @CEPQS
      @CEPQS  2 года назад +1

      Thanks a lot for your kind words and support 🙏👍. And much appreciate your valuable watching time. Your testimonial is a source of motivation and once again thank you for it ❤️. Wish you all the best.

  • @theshamasvlog3432
    @theshamasvlog3432 2 месяца назад

    This is the best BOQ explanation thank you! Your efforts are appreciated! Bless! Its actually quite fun and easy once you get a few formulas going!

    • @CEPQS
      @CEPQS  2 месяца назад +1

      Thank you. It's always great to see that people are finding value in the videos. 😊

  • @moveonnasir
    @moveonnasir 2 года назад +2

    I got lot of information which helps me clear my conception of estimating total project. Great lesson brother. I hope you will give more videos on estimate.

    • @CEPQS
      @CEPQS  2 года назад

      Thank you bro 🙂 wish you all the best

  • @adamding
    @adamding Год назад +3

    I appreciated your effort to explain resource-oriented contractor's estimate vs. unit-based consultant's pricing approach. Looking back for the last 30 years, most of the innovations for estimating technology was really focused on quantity measurement, e.g. on-screen takeoff, bluebeam, Revit 3D model etc. But when it comes to pricing, while the math wasn't difficult, the calculation depends so much on the estimator's experience, judgment and effort to obtain the latest and the greatest prices. So correct me if I'm wrong, but I think Excel spreadsheet will still be used by every company (big or small) for quite some time, at least to price out the job.

    • @CEPQS
      @CEPQS  Год назад +1

      Thank you for the support and valuable feedback 🙏. Regarding the feasibility of estimation using excel, I have seen many estimation softwares like bid bow and many others, but the easiest and the most available method to use is excel so far, and hence many companies are using it. But still using an estimation software with all data bases and all will of course save time and avoid excel mistakes and so on. So if you ask me I like both options as long as the result will be correct. And thank you again for raising this point 👍

  • @bathiyamadushanka7750
    @bathiyamadushanka7750 2 года назад +2

    You have done a great job by knowledge sharing those sessions .the way of your teaching is very impressive and highly organized.I learnt lot of things by your videos.
    Good job....
    All the time success with you..🙏

    • @CEPQS
      @CEPQS  2 года назад

      Thanks a lot for your valued feedback and much appreciate your time watching my content. I’m very happy you learned from my videos and wish you all the best 🙏🙂

  • @ameerasvlog6034
    @ameerasvlog6034 2 года назад +1

    Thank you Sir Ahmed your explanation is very clear and practical, especially for me in the field of construction keep continuing this channel your helping inspiring estimator like me.

    • @CEPQS
      @CEPQS  2 года назад +1

      Thanks Ameera and wish you all the best in your career 🙂. Much appreciate your valuable support and watch time. Kind regards. 👍

  • @olumiladetaiwo7521
    @olumiladetaiwo7521 2 года назад +1

    Wow! Ur explanation is comprehensive with ds content I'm eager to learn more

    • @CEPQS
      @CEPQS  2 года назад

      Glad to hear that. Wish you all the best :)

  • @paincuhh
    @paincuhh 2 года назад

    What a great teaching..Now I know better about estimating and the style you use in the table..Very helpful..

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 🙏

  • @arshharshad2024
    @arshharshad2024 3 месяца назад

    this is very good content , can't get free content like this anywhere on youtube , thanks alot for sharing ur beautiful & highly interesting knowledge content🤝 from india

    • @CEPQS
      @CEPQS  2 месяца назад

      Thanks a lot for watching. all love and appreciation.

  • @serajsafari9160
    @serajsafari9160 7 месяцев назад

    Thank you for the explaination. It was really effective and helped me to improve my knowledge regarding the estimation.

  • @arbazhodekar8007
    @arbazhodekar8007 2 года назад +1

    Hats off you Sir, very needful information shared, keep sharing such things Allah bless you.!!

    • @CEPQS
      @CEPQS  2 года назад +1

      Thank you dear 🙏. Wish you all the best.

  • @imrajahmedpunekar1194
    @imrajahmedpunekar1194 3 года назад +1

    Very nice... You explained it very well.. Many Of my Queries Answered by you.. Appreciated

    • @CEPQS
      @CEPQS  3 года назад

      Thank you Imraj and appreciate your time watching this content.

  • @likha360
    @likha360 Год назад

    I'm glad I found your channel. I hope rhis channel will continue

    • @CEPQS
      @CEPQS  Год назад +1

      Thank you 🙏. Well I was away from RUclips for sometime, but coming back strongly soon. All the best

  • @bonaamule2487
    @bonaamule2487 Год назад

    Wish I found this early would have avoided so many dead end jobs. keep up the good work. Sukr shadid min Junub Al Sudan

    • @CEPQS
      @CEPQS  Год назад +1

      Thanks a lot and wish you all the best 🙏. Extended love to Janub Alsudan

  • @EngMohali
    @EngMohali 2 года назад

    Thank you sir. I got more important points that I was searching long time.

    • @CEPQS
      @CEPQS  2 года назад

      Great 👍. Wish you all the best 🙏

  • @sarfarazhussain7752
    @sarfarazhussain7752 9 месяцев назад

    Wow.. what an amzing way to delivering lecture.. 👍👍

  • @happymomentzz8887
    @happymomentzz8887 2 года назад

    The video was very informative and your way of communication is very good..Thank you very much sir

    • @CEPQS
      @CEPQS  2 года назад

      Thanks a lot and wish you all the best 👍🙏

  • @nkululekoshaunthusi4893
    @nkululekoshaunthusi4893 Год назад

    This is very informative Ahmed, thank you very much.

  • @deidrataylor2919
    @deidrataylor2919 3 года назад +1

    I understand your presentation very well thank you for such a clear delivery

    • @CEPQS
      @CEPQS  3 года назад +1

      Thank you Deidra, appreciate giving the time to watch the video ❤️

  • @SufianLau
    @SufianLau 3 года назад +2

    Well explained. Great job. Subscribed!

    • @CEPQS
      @CEPQS  3 года назад

      Thanks a lot

  • @engrnazrulkhan
    @engrnazrulkhan 3 года назад +2

    Thanks for sharing excellent explanations. But vat and tax shall be included.

  • @Ashokkumar-gs2pv
    @Ashokkumar-gs2pv Год назад

    Really Great sir i get to much information and knowledge. i really appreciate

    • @CEPQS
      @CEPQS  Год назад

      It's my pleasure

  • @sakundashhapuarachchi2546
    @sakundashhapuarachchi2546 2 года назад +1

    Sir, best explanation 👌

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 😊

  • @lobsangyolmoo5162
    @lobsangyolmoo5162 2 года назад

    Great video and love your explanation and concept . Love to see more videos in coming days . Thanks

  • @seyedahamed4847
    @seyedahamed4847 2 года назад +1

    Really superb explanations

    • @CEPQS
      @CEPQS  2 года назад

      Thank you and all the best 🙏😊

  • @luiscastro8476
    @luiscastro8476 Год назад

    thank you so much, this is so helpful and accurate!

  • @WillBockovenCRE
    @WillBockovenCRE 2 года назад +1

    Very informative, thank you

    • @CEPQS
      @CEPQS  2 года назад

      Thank you for watching and valuable feedback 🙏👍

  • @salmanfarsee7084
    @salmanfarsee7084 2 года назад

    Very informative & knowledgeable, i came here from your course at Udemy, unfortunately i was in middle of that course & i think udemy put it down from their platform😢 if you put here or their again your full course, it’ll be very helpful. Thanks again!!

  • @JSLUBANA17
    @JSLUBANA17 2 месяца назад

    very clear and nice presentation

    • @CEPQS
      @CEPQS  2 месяца назад

      Thanks a lot for watching :)

  • @nadishkasenarathna4623
    @nadishkasenarathna4623 Год назад +1

    Very good and useful

    • @CEPQS
      @CEPQS  Год назад

      Thank you

  • @technocivil
    @technocivil Год назад +1

    Amazing video. Thanks

    • @CEPQS
      @CEPQS  Год назад

      Thanks a lot 🙏

  • @triplezzz6459
    @triplezzz6459 Год назад

    Thank you for sharing, very nice

  • @erwinkahirimana5234
    @erwinkahirimana5234 2 года назад

    Thank you so much for your help ,it was very helpful 😊.

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 😊 and wish you all the best

  • @shaheelwazer7700
    @shaheelwazer7700 3 года назад +1

    Thank you very much. Great content! If you can provide the explained excel sheet we can get a better view on the context.

    • @CEPQS
      @CEPQS  3 года назад

      Hello Shaheel and thank you for watching. That is 6 hours content explained in details in our Detailed Cost Estimation for Construction Project online course.
      cost-engineering-professional.teachable.com/p/detailed-cost-estimation-for-construction-projects

  • @lavarhanchell293
    @lavarhanchell293 2 года назад

    I found this to be very helpful

    • @CEPQS
      @CEPQS  2 года назад

      Great 👍 wish you all the best 🙂

  • @KarwanLatif-tb9ed
    @KarwanLatif-tb9ed Год назад +1

    thank you for this detailed presentation...
    could you please send the link to this excel sheet to us?

  • @varungcc1086
    @varungcc1086 Год назад

    Nice Informative -

  • @laiseniakoto6448
    @laiseniakoto6448 2 года назад +1

    Wonderful and very interesting episode. I have a suggestion can you have the materials explanation too

    • @CEPQS
      @CEPQS  2 года назад

      Of course 😊 I’ll do that and thank you so much for watching and for support 👍🙏

  • @AamirKhan-sp7df
    @AamirKhan-sp7df 3 года назад

    Tnxx sir for uploading new video... ❤️❤️👍👍

    • @CEPQS
      @CEPQS  3 года назад +1

      Thank you Aamir for your continuous support ❤️👍

  • @akgulv
    @akgulv 10 месяцев назад

    Great content thanks. Just to ask something; i think the cost here is based on manhours however due to schedule sequence, some of my workers could remain idle while still paying salary for them?(assuming having own work team)

  • @flavianojose8423
    @flavianojose8423 11 месяцев назад

    Very good, is this spreadsheet provided somewhere?

  • @remingiussigina1941
    @remingiussigina1941 3 года назад

    Thank you. very helpful

  • @muhammedthasneemellangal6329
    @muhammedthasneemellangal6329 2 года назад +1

    well explained 👍

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 🙏😊

  • @kurienillirickal7195
    @kurienillirickal7195 5 месяцев назад

    Hi. Materual transportation cost from contractor warehouse to site can be consider under material cost ?

  • @hafizumar6845
    @hafizumar6845 2 года назад

    Great worked by u

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 🙏😊

  • @Omthathshath568
    @Omthathshath568 Год назад +1

    Can you share one Electrical project quote format xl sheet for reference

  • @SachinKumar-cz6ow
    @SachinKumar-cz6ow 2 года назад +1

    Thank u for such informative video.... Can u please send the link to download the excel file ? Thanks

  • @bourezahkarim3172
    @bourezahkarim3172 2 года назад +1

    Thank you Ahmed for your valuable help, Baraka Allah fik.
    I am following along with you by implementing the same spreadsheets as you, I end up wondering how many lines would I have to work with in the Activity Manpower Cost sheet if I am required to do the same for an EPC project, about 3000 activities and about 200 work positions, that's about 600K lines of cost estimation for the only manpower scope!!! unless I am missing something.

    • @CEPQS
      @CEPQS  2 года назад +1

      Thank you for watching 👍and support. Some time when the project is huge traditional excel estimation doesn’t work. You might need to start looking into some ERP systems

    • @bourezahkarim3172
      @bourezahkarim3172 2 года назад

      @@CEPQS Yes! Thank god we got Primavera & MS Project 👌👌
      الله يجعلها في ميزان حسناتك يا رب

    • @mirriamchilenga4022
      @mirriamchilenga4022 Год назад

      Good explanation Ahmed , did I miss the cost of transporting materials in the building up of rates?

  • @bertramtaylor4697
    @bertramtaylor4697 11 месяцев назад

    This I appreciated. Where can I find a template?

  • @chukwukaakpati9820
    @chukwukaakpati9820 2 года назад

    What a great presentation.....Please, how do i get more details on cost estimation, planning & scheduling?

    • @CEPQS
      @CEPQS  2 года назад

      Thanks a lot for watching and support. Subscribe to the channel and stay connected is the easiest way 😊

  • @kalanappiyasiri3031
    @kalanappiyasiri3031 Год назад

    great. got a lot sir.

  • @markarthursinoy
    @markarthursinoy 8 месяцев назад

    where can I get a copy of the tables used in the video? thank you!

  • @SoulCafe7
    @SoulCafe7 2 года назад +2

    Thanks for the informative video. Can you tell in more detail about the calculation of materials for each type of work using this table as an example!?

    • @CEPQS
      @CEPQS  2 года назад

      Thanks a lot 😊, I started explaining the manpower in this video ruclips.net/video/M4EWSRz4Pc0/видео.html

    • @SoulCafe7
      @SoulCafe7 2 года назад +2

      @@CEPQS Thanks, I've watched the video. I meant how do you determine the list and consumption of necessary materials for each job, as well as their cost!?

    • @CEPQS
      @CEPQS  2 года назад

      @@SoulCafe7 this is a very big subject. If you need all the details of how to price a complete project BOQ including (materials, equipment, manpower and subcontractors), I have published an online course for that, and the link can be found in the description of any video in the channel. Cost Estimation course.

  • @akarqadir
    @akarqadir 3 года назад +1

    thanks for this informative vid, can u explain cash flow and its uses in the project in the next vid ?

    • @CEPQS
      @CEPQS  3 года назад +3

      Thanks Aikar, I’ll definitely do 👍

  • @pradiptanugraha6841
    @pradiptanugraha6841 2 года назад +1

    Thanks for the great explanation but I have a question in mind.
    Is the rate breakdown analysis the same with quantity take off? Do you have a video talking about the quantity take off? THanks

    • @CEPQS
      @CEPQS  2 года назад

      Thank you for watching and for your support🙏. Sure, there is a complete playlist for quantity takeoff ruclips.net/p/PLX2TjdCS4FjR-Tji5s7cWLfesLCRRBY8M

    • @CEPQS
      @CEPQS  2 года назад

      After watching the playlist, if you feel you still need more information, then our construction takeoff and BOQ preparation course will be very helpful for you. You can find the link to the course in the description of any video 👍

  • @vinothshalabha3200
    @vinothshalabha3200 2 года назад +1

    We need to follow BOQ or calculate separate each activities amount?

    • @CEPQS
      @CEPQS  2 года назад

      Well, it depends. If one BOQ item is more than 1 activity in the program, then in that case you split the BOQ amount from this item on the various program activities. If 1 BOQ item and 1 program activity, then same value :)

    • @CEPQS
      @CEPQS  2 года назад

      For cost estimation, you will estimate the costs for all the BOQ items, and if any item is missing, you will have to add it and estimate it.

  • @AceCPAsBookkeeping
    @AceCPAsBookkeeping 7 месяцев назад

    TLDR: Cost estimation in construction involves understanding overall project costs, using historical data and physical units, and factoring in various elements such as labor, materials, equipment, and overhead costs to arrive at accurate estimates.
    00:00 🏗 Cost estimation in construction involves understanding overall project costs, using historical data and physical units, with conceptual and definitive methods for accuracy.
    06:29 💰 Cost estimation in construction involves calculating the cost per hour and per day for labor, factoring in various elements such as basic salary, accommodation, and productivity.
    11:29 🏗 Cost estimation in construction involves calculating the cost per unit for manpower and materials, including allowances for equipment and tools needed for installation.
    15:21 🏗 Estimating project costs in construction involves considering material, equipment, manpower, and subcontractor costs, and factoring in allowances for potential additional expenses.
    20:51 💰 Cost estimation in construction involves making assumptions and using individual price lists and labor productivity, resulting in different estimates, but all of which are correct, and the process involves adding percentages on top of the estimates to arrive at the total cost.
    23:34 🏗 Cost estimation in construction involves accounting for site supervision, loading the cost of a full-time foreman onto a project, and distributing the cost of an engineer working on multiple projects, as well as calculating overhead costs based on total project value and monthly spend.
    27:22 🏗 Project costs in construction are allocated based on percentage of total company work, with overheads calculated at 6-12% and contingencies accounting for unplanned risks, while also considering profit margins and negotiating to lower project costs.
    33:39 🏗 Ask vendors and subcontractors for prices, check out the course for detailed cost estimation methods, and subscribe for more videos.

  • @dilshadmohamed3121
    @dilshadmohamed3121 2 года назад +1

    Thankyou very much sir

    • @CEPQS
      @CEPQS  2 года назад

      Thank you 🙏🙂

  • @marisolpalacios4122
    @marisolpalacios4122 10 месяцев назад

    Will be nice if you show as how did you do your Excel formulas .

  • @ashasudheesh3425
    @ashasudheesh3425 2 года назад

    I am interested to join your cost estimation course

  • @vinothshalabha3200
    @vinothshalabha3200 3 года назад +1

    Primerva P6 . complete construction project step by step sample with all explain ( WBS obs activities resources cost etc ) A to Z .pls explain everything.

    • @CEPQS
      @CEPQS  3 года назад

      Details will explained in depth in our “planning and scheduling course” 😃 [not yet released]

  • @abjertech9500
    @abjertech9500 2 года назад +7

    If u will attach this document it will be better

    • @CEPQS
      @CEPQS  2 года назад

      Thank you for the valuable feedback 🙏👍

    • @jovin992
      @jovin992 2 года назад +1

      Can you upload the excel sheet?

    • @CEPQS
      @CEPQS  2 года назад

      @@jovin992 can be found in the cost estimation course. With complete details. 👍

    • @BG-uf8kh
      @BG-uf8kh Год назад

      Where is this course?

  • @alexnsia5008
    @alexnsia5008 Год назад

    Hi Sir, how do you decide/come up on how long a project will last or take to be completed to avoid delay penalty? Could you please kindly do a video of this? Thank you

    • @CEPQS
      @CEPQS  Год назад

      You have to prepare a program of works and update it weekly and monthly to identify delays and prepare mitigation plans if required. I personally have the theoretical knowledge of planning but not the practical one to be honest. Hence I explained the concepts in some videos here on the channel, but I can’t do primavera videos as it is not my core strength ☺️

  • @mohammedmagdy7667
    @mohammedmagdy7667 9 месяцев назад

    رجاءا بشمهندس ازاي اقدر اتواصل مع حضرتك لحضور دورة تدريبة مع حضرتك في cost estimation اكون شاكر لو ترسل لي رقم حضرتك

  • @sanelenyaka2720
    @sanelenyaka2720 Год назад

    Amazing & informative. May I please get the templates you’re using if it’s possible. Even for a fee if they’re not free.

    • @CEPQS
      @CEPQS  Год назад

      Thanks for watching and support and wish you all the best. This is the link to AA Cost Estimation Pro excel template: cost-engineering-professional.teachable.com/p/my-downloadable-219287

  • @floty888
    @floty888 5 месяцев назад +1

    zhank you habibi

  • @Mimik70-w3t
    @Mimik70-w3t 2 года назад +1

    Please can you share this excel sheet template that you are using to present😇

    • @CEPQS
      @CEPQS  2 года назад +1

      I showed how to prepare it in the video 😂. You have to try and get it done 👍. Believe me it is easy to give it ready, but you will learn when you do it yourself ❤️

    • @Mimik70-w3t
      @Mimik70-w3t 2 года назад +1

      @@CEPQS Thank you. Let me try🙌

  • @francissanoop
    @francissanoop Год назад

    can u provide this template

  • @kennetheluerkeh5418
    @kennetheluerkeh5418 2 года назад +1

    I WANT TO TAKE YOUR COURSES REGARDING PLANSWIFT , IS THERE ANY WAY OF CONTACTING YOU PRIVATELY .

    • @CEPQS
      @CEPQS  2 года назад

      Thank you for watching. Yeah sure, you can contact me at info@costengpro.com

    • @kennetheluerkeh5418
      @kennetheluerkeh5418 2 года назад +1

      @@CEPQS THE SITE PROVIDED IS BEING WORKED , WHICH MEANS I CANNOT GET IN TOUCH WTIH YOU UNTIL IT IS BEING WORKED ON

    • @CEPQS
      @CEPQS  2 года назад

      Not the site. Just mail me on “info@costengpro.com”

  • @yasirzaib7170
    @yasirzaib7170 2 года назад +1

    Wonderful information dear can you share this sheet to me

  • @mohammedmakeen9132
    @mohammedmakeen9132 3 года назад

    Thank you sir

    • @CEPQS
      @CEPQS  3 года назад

      Thank you Mohammed Makeen, appreciate your kind support ❤️

  • @kenjalia3151
    @kenjalia3151 Год назад

    How can i find Construction estimator ?

    • @CEPQS
      @CEPQS  Год назад

      This is an ongoing course on RUclips:
      COST ESTIMATION | How To Estimate The Cost Of Reinforced Concrete Structures Part 1
      ruclips.net/video/ZPwkHBAWn6g/видео.html

  • @josealfonsoramosorona7984
    @josealfonsoramosorona7984 2 года назад

    Hello, im Study civil engineering in sonora Mexico, Just one semester to done mi carrer, and i want to be a cost engineering i like to usé the numbers, wat is possibilities to take a job in usa if i have a title of civil engineering in mexico

    • @adamding
      @adamding Год назад

      I think getting a reputable Master's degree in USA would help after you finish the current degree in Mexico, but still need sponsorship from the US employer.

  • @yasirzaib7170
    @yasirzaib7170 2 года назад +1

    Dear please share these all estimated sheets with me

  • @vinothshalabha3200
    @vinothshalabha3200 2 года назад +1

    I m waiting for your new video

    • @CEPQS
      @CEPQS  2 года назад

      Soooooon 😃

  • @iamfaqkhan
    @iamfaqkhan Год назад

    Can you share this excel?

  • @dogaramags3364
    @dogaramags3364 2 года назад +1

    the charts or table is not clear for good visibility

    • @CEPQS
      @CEPQS  2 года назад

      I’ll remake the video later 👍

  • @vinothshalabha3200
    @vinothshalabha3200 2 года назад +1

    More videos explanation in primerva full A to Z

    • @CEPQS
      @CEPQS  2 года назад

      I'm planning for this, however some restrictions are there on the Primavera, and I'll to find a work around ;)

  • @lalacaubat
    @lalacaubat 3 года назад

    Thank you

    • @CEPQS
      @CEPQS  3 года назад

      Thank you Ella for watching and commenting

  • @waldrysmouss486
    @waldrysmouss486 3 года назад

    Hi can I ask for your Excel BOQ?

    • @CEPQS
      @CEPQS  3 года назад +1

      Hello waldrys and thank you for watching. You may get this BOQ and a lot more by enrolling for one of our courses below.

    • @waldrysmouss486
      @waldrysmouss486 3 года назад +1

      @@CEPQS thank you, I just checked. And I love the price.

  • @ahmed.n.shaarawy
    @ahmed.n.shaarawy 4 месяца назад

    عايز الكورس ده كامل

    • @CEPQS
      @CEPQS  2 месяца назад

      cost-engineering-professional.teachable.com/p/construction-cost-estimation-the-ultimate-guide

  • @emekandiukwu4271
    @emekandiukwu4271 2 года назад +2

    I love your explanations but the problem here is that it's not clear I can't see the figures, you could help make more bolder so we can see it clearly, thanks

    • @CEPQS
      @CEPQS  2 года назад +1

      Thank you Emeka for watching and for the valuable feedback. I’ll make sure in the future that the figures will be visible. 🙏👍

  • @nejendary
    @nejendary 4 месяца назад

    You should like advertising your business. When you said you don't like to...

    • @CEPQS
      @CEPQS  Месяц назад

      😊. A new course is released. give it a try

  • @sakeelfarook3557
    @sakeelfarook3557 Год назад

    ❤❤❤

  • @muame5225
    @muame5225 2 года назад +1

    Hay quá

    • @CEPQS
      @CEPQS  2 года назад

      Thanks

    • @mrcoolabsvlogs2830
      @mrcoolabsvlogs2830 Год назад

      Thanks for your knowledgeable videos sir, you are doing great... Kindly share or attach links for excel documents also.

  • @SadhiqueBombayContractingLLC
    @SadhiqueBombayContractingLLC 8 месяцев назад

    I want to join your course. Please share your contact details

  • @DubaiWitthi
    @DubaiWitthi Год назад

    A great Presentation. Could you please explain about the construction management? Because your presentation is very clear. And could you please send your email address also?

    • @CEPQS
      @CEPQS  Год назад

      Will try my best to do a video on construction management 👍

  • @kristianmorris9738
    @kristianmorris9738 3 месяца назад

    Where are you finding skilled carpenters for $14.06 per hour? It's $58.00 per hour in my country, excluding allowances, penalties and compulsory employer superannuation contributions. Don't even ask what electricians cost...😂

    • @KalaKarunan
      @KalaKarunan 3 месяца назад

      How to buy course

    • @CEPQS
      @CEPQS  2 месяца назад

      Don't look at the numbers. Just understand the concept :)

  • @bassamy.1146
    @bassamy.1146 6 месяцев назад

    مصري؟

  • @surveyorofua3914
    @surveyorofua3914 2 года назад

    Friends, maybe you have an unnecessary, outdated, broken geodetic equipment, which I have given a new life to.

  • @kopCopper1990
    @kopCopper1990 Год назад

    The video will be more useful if you could also share the excel so that viewers can learn and do it with you. I understand that you want to sell your course, but you are also making money from youtube. If you are trying to educate a wider group, some of which cant afford the course, then I think sharing the excel will be useful.

  • @kalakarunan6333
    @kalakarunan6333 3 месяца назад

    Thank you

    • @CEPQS
      @CEPQS  2 месяца назад

      Thank you :)

  • @ngoclevan7819
    @ngoclevan7819 2 года назад +1

    Hay quá

    • @CEPQS
      @CEPQS  2 года назад

      🙏👍