Martin Luther King, Jr. Drive and US 52 North in Winston-Salem

Поделиться
HTML-код
  • Опубликовано: 9 май 2024
  • A short drive on Martin Luther King, Jr. Drive in Winston-Salem and a longer drive on US 52 North, ending on Bethania-Rural Hall Road/NC 65 near Rural Hall.
    The construction area for a new bridge and widening project for Hanes Mill Road is entered at 08:15.
    The construction zone for the Northern Beltway interchange with US 52 is entered at 08:50. The first bridge is the new overpass for Ziglar Road. Work continues on the ramps to and from the beltway, though some ramps will remain closed until the western end of the beltway is built -- the start of that project is still years away.
    Recorded in April 2024 using a GoPro Hero10 Black camera in 4K/Ultra HD/2160p resolution.
    Telemetry was extracted with JuanIrache / gopro-utils.
    github.com/JuanIrache/gopro-u...
    Gauges were created with DashWare 1.9.1.
    Video was created with MAGIX Movie Studio 2024 Platinum, using AV1 codec.

Комментарии •