Garage Build #17 - Cutting Relief Cuts in Concrete

Поделиться
HTML-код
  • Опубликовано: 29 ноя 2024
  • ХоббиХобби

Комментарии • 16

  • @balazslakatos9817
    @balazslakatos9817 Год назад +4

    finally I know whats relief cuts, thanks.

    • @stefanmeyers2808
      @stefanmeyers2808 10 месяцев назад

      I use Mulco Supra or Mulco Expert, available in Canada at Home Hardware.

    • @balazslakatos9817
      @balazslakatos9817 10 месяцев назад

      @@stefanmeyers2808 I guess this answer belongs to other comment :)

  • @houndsmanone4563
    @houndsmanone4563 Год назад +1

    What caulking did you use? Thanks 👍🏽🤠 11/17/23

  • @joeykoebel3462
    @joeykoebel3462 Год назад +1

    Ok so how deep did you cut ??? Completely through? Saw blade looked only 1-1/1/2” deep

    • @seanwilson2925
      @seanwilson2925 Год назад +4

      1/4 inch per inch of concrete. So a 4 inch slab at 1 inch. A 6 inch slab at 1.5

    • @dtkent1
      @dtkent1 Год назад +1

      nice when did you cut? how long after the pour?

  • @mikethedesertrat
    @mikethedesertrat 9 месяцев назад +1

    Would using a guide board layed down next to your line help keep the cut straight?

  • @leelunk8235
    @leelunk8235 5 месяцев назад

    DO YOU RECOMMEND RELIEF CUTS ALL THE WAY THROUGH?

    • @appalachiandiy2415
      @appalachiandiy2415  5 месяцев назад

      @@leelunk8235 no. Just an inch or so deep

    • @leelunk8235
      @leelunk8235 5 месяцев назад

      @@appalachiandiy2415 THE PREVIOUS HOUSE I HAD, 1/3 OF MY BACKYARD I DECIDED TO REMOVE GRASS AND DO CONCRETE, THE DUDES WHO I CONTRACTED, ASKED ME IF I WANT THE STRESS CUTS HALF WAY THROUGH OR ALL THE WAY THROUGH, I SAID ALL THE WAY, I WAS UNEDUCATED ON IT, THEY DID THE CUTS A FEW HRS AFTER POURING, AND A WEEK LATER I SAW CHIPPING ALL OVER IN DIFFERENT PARTS OF THE CUTS, I ALSO NOTICED WEED AND GRASS GROWING THROUGH THE CUTS, I PAID 3,150 FOR THE JOB, I LEARNED A VALUABLE LESSON AND A FEW YEARS LATER SOLD THE HOUSE. THAT'S MY STORY, WHAT YOU THINK OF THAT B.S

    • @leelunk8235
      @leelunk8235 5 месяцев назад

      @@appalachiandiy2415 THE PREVIOUS HOUSE I HAD, 1/3 OF MY BACKYARD I DECIDED TO REMOVE GRASS AND DO CONCRETE, THE DUDES WHO I CONTRACTED, ASKED ME IF I WANT THE STRESS CUTS HALF WAY THROUGH OR ALL THE WAY THROUGH, I SAID ALL THE WAY, I WAS UNEDUCATED ON IT, THEY DID THE CUTS A FEW HRS AFTER POURING, AND A WEEK LATER I SAW CHIPPING ALL OVER IN DIFFERENT PARTS OF THE CUTS, I ALSO NOTICED WEED AND GRASS GROWING THROUGH THE CUTS, I PAID 3,150 FOR THE JOB, I LEARNED A VALUABLE LESSON AND A FEW YEARS LATER SOLD THE HOUSE. THAT'S MY STORY, WHAT YOU THINK OF THAT B.S

    • @LEELUNK-IS-A-HUNK
      @LEELUNK-IS-A-HUNK 5 месяцев назад

      @@appalachiandiy2415 THE PREVIOUS HOUSE I HAD, 1/3 OF MY BACKYARD I DECIDED TO REMOVE GRASS AND DO CONCRETE, THE DUDES WHO I CONTRACTED, ASKED ME IF I WANT THE STRESS CUTS HALF WAY THROUGH OR ALL THE WAY THROUGH, I SAID ALL THE WAY, I WAS UNEDUCATED ON IT, THEY DID THE CUTS A FEW HRS AFTER POURING, AND A WEEK LATER I SAW CHIPPING ALL OVER IN DIFFERENT PARTS OF THE CUTS, I ALSO NOTICED WEED AND GRASS GROWING THROUGH THE CUTS, I PAID 3,150 FOR THE JOB, I LEARNED A VALUABLE LESSON AND A FEW YEARS LATER SOLD THE HOUSE. THAT'S MY STORY, WHAT YOU THINK OF THAT B.S

    • @abc-ed1nr
      @abc-ed1nr 2 месяца назад

      1/4 of the way through the slab. That’s 1” on a 4” slab or 1.5” on a 6” slab