"Bonus" screws as I call them are abundant in a job like that, but none the less I take my hat off to you sir! A challenge seeker! Ain't nothin' wrong with that! It was the same thing that got myself in a career doing that stuff. Couldn't afford to pay nobody to do it, plus "cars" were my hobby anyway. Much respect!
The heating core needs replacing in my 2004 neon and needs new alternator and battery,problem is removal and install another heating core tales 8 hours
"Bonus" screws as I call them are abundant in a job like that, but none the less I take my hat off to you sir! A challenge seeker! Ain't nothin' wrong with that! It was the same thing that got myself in a career doing that stuff. Couldn't afford to pay nobody to do it, plus "cars" were my hobby anyway. Much respect!
Big G thanks Big G
The heating core needs replacing in my 2004 neon and needs new alternator and battery,problem is removal and install another heating core tales 8 hours
Chad Pope it's possible. you never know what you may run into. l made sure l had all the tools ready..
So how long did the whole project take?
Adam Diaz about 10 hours or more it's been a long time ago. it was hot in Miami.