Gas Pipeline Section Lowering-in at River Crossing.

Поделиться
HTML-код
  • Опубликовано: 15 окт 2024
  • Gas Pipeline Construction Project - Pipeline Lowering-in at River Crossing with Liebherr Side Booms (Pipe Layers). Sheet Piling done to avoid collapse of river banks.

Комментарии • 25

  • @freekingawwsome
    @freekingawwsome 3 года назад +2

    Now that was so perfect. Very nicely produced.thank you for the share

  • @williamschlenger1518
    @williamschlenger1518 3 года назад +1

    I wish we had equipment like that back in the 1960s.We ran 16 inch gas lines with one 944cat loader with a sideboom.

  • @garysoutar451
    @garysoutar451 Месяц назад

    Worked on the St Fergus too Mossmorran pipeline 1980s
    am sure the used floating barges to cross the Tay and Earn rivers in Scotland because there was no way you were blocking any Salmon rivers.
    I never seen that cause I was forth ahead .

  • @johnnyhunter4345
    @johnnyhunter4345 11 месяцев назад

    We used concrete collars bolted on pipe to keep in trench in river

  • @joemakowichuk3888
    @joemakowichuk3888 Год назад

    What was that like who’s welding that tie in

  • @mustafaemir636
    @mustafaemir636 2 года назад

    Tüm emeği geçen herkesin eklerine sağlık orda çok güzel bir çalışma oldu

  • @shawnmoore6597
    @shawnmoore6597 3 года назад

    And the floaties on top were needed for what?

    • @liamclarke5851
      @liamclarke5851 2 года назад

      to fill with concrete so it does'nt float

  • @bikepamoretowork1459
    @bikepamoretowork1459 3 года назад

    nice..

  • @朱拜勒轻骑兵
    @朱拜勒轻骑兵 4 года назад

    What's the next? How to remove the belt? How to do the welding for the remaining?

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  3 года назад +1

      First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.

  • @JoseMaciasraudales
    @JoseMaciasraudales 8 месяцев назад

    Natrai trabajo de operador

  • @SenorAhole
    @SenorAhole 3 года назад

    Nice!

  • @ОромжонНоркулов
    @ОромжонНоркулов 9 месяцев назад

    ok

  • @imadayache3935
    @imadayache3935 2 года назад

    سايدبوم

  • @SenorAhole
    @SenorAhole 3 года назад

    German style

  • @bobcreamier9854
    @bobcreamier9854 3 года назад

    How to fuck a river up

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  3 года назад +1

      River will be re-instated to the original condition after the pipeline laying work is completed.

    • @FirstGendodgegarage
      @FirstGendodgegarage 2 года назад

      grow a pair ding dong they fix it after