Cross Country Pipeline project. - 48" TANAP Gas Pipeline Construction, Turkey.
Trans Anatolian Natural Gas Pipeline (TANAP) project Turkey, 48" TANAP Gas Pipeline Project, Activities include Right of Way (ROW) preparation, Pipe Transportation, Pipe stringing, Pipe joint fit-up, Pipe joint welding with Automatic Welding Machines. Construction Equipment used are Liebherr Excavators, Liebherr Pipe Layer / Side boom, Liebherr Paywelder, CRC Internal Line up Clamps, CRC Internal Automatic Welding machines, CRC Automatic external pipe welding machines etc. Cross Country Pipeline.
Просмотров: 3 652

Видео

Fiber Optic Cable splicing / jointing.
Просмотров 2,5 тыс.3 года назад
Fiber Optic Cable splicing / jointing with fusion splicer T-400S of Sumitomo Electric. FOC cable splicing for Broadband Internet Connections and Telecommunication cables.
Gas Pipeline Construction - Pipeline Lowering in to the trench in normal terrain.
Просмотров 62 тыс.4 года назад
Gas Pipeline Construction - Pipeline installation in to the trench in normal terrain. Pipeline lowering-in to the trench using Liebherr pipe layers. This video will demonstrate how to lower a pipeline section safely.
Gas Pipeline Construction - FOC Chambers.
Просмотров 3325 лет назад
Gas Pipeline Construction - Fiber Optic Cable Chambers in a precast yard.
Gas Pipeline Construction - Equipment set up for lowering-in.
Просмотров 1,1 тыс.5 лет назад
Gas Pipeline Construction - Side Boom and other equipment set up for Pipeline section lowering-in at River crossing. Dewatering by submersible pumps.
Gas Pipeline Construction - Rock Blasting.
Просмотров 1,6 тыс.5 лет назад
Gas Pipeline Trench excavation by Blasting of rocks on the Right of Way.
Gas Pipeline Section Lowering-in at River Crossing.
Просмотров 66 тыс.5 лет назад
Gas Pipeline Construction Project - Pipeline Lowering-in at River Crossing with Liebherr Side Booms (Pipe Layers). Sheet Piling done to avoid collapse of river banks.
How to make Gozleme, Turkish food.
Просмотров 2,2 тыс.6 лет назад
Best street food in Turkey - Gozleme.
Pipeline Bedding and Padding with Allu Bucket
Просмотров 29 тыс.7 лет назад
Gas Pipeline Construction Project - Bedding, Pre-padding and Post Padding without screening plant.

Комментарии

  • @edmcelhone4501
    @edmcelhone4501 3 дня назад

    that looks like some sandstone hard diging

  • @atiqurrahaman6
    @atiqurrahaman6 Месяц назад

    What type of welding in Automatic welding like SMAW or GTAW

  • @garysoutar451
    @garysoutar451 Месяц назад

    Worked on the St Fergus too Mossmorran pipeline 1980s am sure the used floating barges to cross the Tay and Earn rivers in Scotland because there was no way you were blocking any Salmon rivers. I never seen that cause I was forth ahead .

  • @svmnsp
    @svmnsp 2 месяца назад

    I was PM for detailed engineering

  • @JoseMaciasraudales
    @JoseMaciasraudales 8 месяцев назад

    Natrai trabajo de operador

  • @ОромжонНоркулов
    @ОромжонНоркулов 9 месяцев назад

    ok

  • @bartbley1269
    @bartbley1269 11 месяцев назад

    Looks like they screwed the welders by lowering it in with not enough pipe into the bell hole . 6 feet (2 meters) past the end of the bell hole is a minimum standard

  • @johnnyhunter4345
    @johnnyhunter4345 11 месяцев назад

    Looks disorganized and inefficient...lot of wasted time and motions.....would not fly in America...

  • @johnnyhunter4345
    @johnnyhunter4345 11 месяцев назад

    We used concrete collars bolted on pipe to keep in trench in river

  • @RICHOil
    @RICHOil 11 месяцев назад

    It is simply a great job for those of us who like laying gas pipeline lines. I invite you to my channel, friends of the industry. youtube.com/@RICHOil?si=npvd06lwODBuBz03

  • @nolanjohnston7050
    @nolanjohnston7050 Год назад

    Amateur hour!

  • @akmalhossain9834
    @akmalhossain9834 Год назад

    Circus asalam walekum chahie Sanam bacche ghar par Patang wala boliye 0:03 0:03

  • @kv9765
    @kv9765 Год назад

    That is by far one of the worst starts I’ve seen with lowering in for trying to get the pipe on the ground. Catch that swing, it should never hit the side walls like that, while it might not do much damage, that is complete amateur hour for those boom hands .

    • @donpeifer696
      @donpeifer696 Год назад

      That was pitiful watching that pipe swinging hitting the edges of the ditch. The GREEN TEAM?

  • @joemakowichuk3888
    @joemakowichuk3888 Год назад

    What was that like who’s welding that tie in

  • @mlctv6475
    @mlctv6475 Год назад

    I miss this job...1993 Qatif Junction and Ju' aymah pipeline, Saudi Arabia.

    • @kv9765
      @kv9765 Год назад

      Are Liebherrs that old?

  • @imadayache3935
    @imadayache3935 2 года назад

    سايدبوم

  • @peterlanum6970
    @peterlanum6970 2 года назад

    The rest of the crew is long gone, you would need 100 of these things to keep up.

  • @mudassaraslam512
    @mudassaraslam512 2 года назад

    How long pipeline can be lowered with side booms in single operation?

    • @ElEsDee71
      @ElEsDee71 2 года назад

      Endless, they assemble on top, weld it, check it, and a mile (or whatever) down the road the pipelayers put it in.. the system can keep going on as long as you need it to be. 🙂 You do not want flanges underground, these will give you trouble.. flanges do not flex, they rust, leak, are weak points. If they need to divide the pipe to put in a shutter or pumping system, they weld a curved pipe so it comes above ground, en only above ground will be flanged because it needs maintenance. Everything undergroung should be welded. Overnight the sidebooms will just stop, and the pipe might be secured on top with a nice beefy bulldozer to make sure everything is still upright in the morning or after heavy rainfall. I have done it a couple of times with crawler cranes, which is waaaaayyyy slower and seriously tricky.. sidebooms are old fashioned equipment that is still best suited for this job.

    • @the0hatusa
      @the0hatusa 2 года назад

      can i ask sth. when are the hidrostatic tests done? after lowering? which norm (asme) state that? regards

    • @oe542
      @oe542 Год назад

      @@the0hatusa normally the testing is done after it’s been lowered in.

  • @viorelscrob6391
    @viorelscrob6391 2 года назад

    For welding i would like to work there.

  • @mustafaemir636
    @mustafaemir636 2 года назад

    Tüm emeği geçen herkesin eklerine sağlık orda çok güzel bir çalışma oldu

  • @saravananselvakumar5223
    @saravananselvakumar5223 2 года назад

    What is that green colour coated in the welded field joints

  • @hamishtrotter7300
    @hamishtrotter7300 3 года назад

    Pretty sure they caught the sides of the trench when they started. Coating damage ?

    • @mlctv6475
      @mlctv6475 Год назад

      Easy to repair ...but before that, it would undergo holiday testing first.

    • @michaelchurch5788
      @michaelchurch5788 2 месяца назад

      Yeah right 😂 coating damage, hit the trench twice before she hit the deck

  • @shawnmoore6597
    @shawnmoore6597 3 года назад

    And the floaties on top were needed for what?

    • @liamclarke5851
      @liamclarke5851 2 года назад

      to fill with concrete so it does'nt float

  • @pradumkumar447
    @pradumkumar447 3 года назад

    Kis jagha ka hai

  • @pradumkumar447
    @pradumkumar447 3 года назад

    Nice sir 👌

  • @simranjitsinghhayersaab1096
    @simranjitsinghhayersaab1096 3 года назад

    Nice u

  • @utubedigitalmedia4590
    @utubedigitalmedia4590 3 года назад

    This is a Cross country gas pipeline construction video.

  • @bikepamoretowork1459
    @bikepamoretowork1459 3 года назад

    nice..

  • @QuakeWrapInc
    @QuakeWrapInc 3 года назад

    Great video. Our new invention allows you to build a continuous pipe of any size onsite, eliminating virtually all transportation costs and leaking joints. ruclips.net/video/EGsipDj0dEA/видео.html

  • @rohitpatil7402
    @rohitpatil7402 3 года назад

    Machine is good or bad plz suggest me

  • @MattLGreer
    @MattLGreer 3 года назад

    I can't be 100% sure but it looks like that pipe isn't coated?

    • @ahmedmuneer92
      @ahmedmuneer92 3 года назад

      yes the joints need to be coated , not sure how they gonna do it inside trench

    • @utubedigitalmedia4590
      @utubedigitalmedia4590 3 года назад

      Pipes are factory coated with 3 layer PE.

    • @utubedigitalmedia4590
      @utubedigitalmedia4590 3 года назад

      Joints were coated outside the trench prior to lowering-in.

  • @SenorAhole
    @SenorAhole 3 года назад

    Awesome job! 👌

  • @SenorAhole
    @SenorAhole 3 года назад

    German style

  • @SenorAhole
    @SenorAhole 3 года назад

    Nice!

  • @hamptonequipment5853
    @hamptonequipment5853 3 года назад

    I bet he's still there finishing that job!!!!!

  • @freekingawwsome
    @freekingawwsome 3 года назад

    Now that was so perfect. Very nicely produced.thank you for the share

  • @williamschlenger1518
    @williamschlenger1518 3 года назад

    I wish we had equipment like that back in the 1960s.We ran 16 inch gas lines with one 944cat loader with a sideboom.

  • @williamschlenger1518
    @williamschlenger1518 3 года назад

    Who makes that sideboom,is it German made?

    • @ericbrown375
      @ericbrown375 3 года назад

      It is a Lee bear 64 one of the finest pieces of equipment I have ever ran yet and the John Deere 1050 K

    • @kv9765
      @kv9765 Год назад

      @@ericbrown375not the biggest fans of the Liebherr to be honest, but I came from the open cab era so little biased. The 1050’s are the Rolls Royce for sure though

  • @williamschlenger1518
    @williamschlenger1518 3 года назад

    Unbelievable equipment.Back in 1960s the company I worked for ran 28 miles of 12 inch gas line with one 944Cat louder and four welders.

  • @bobcreamier9854
    @bobcreamier9854 3 года назад

    How to fuck a river up

    • @utubedigitalmedia4590
      @utubedigitalmedia4590 3 года назад

      River will be re-instated to the original condition after the pipeline laying work is completed.

    • @FirstGendodgegarage
      @FirstGendodgegarage 2 года назад

      grow a pair ding dong they fix it after

  • @pawansingh-xb8tf
    @pawansingh-xb8tf 3 года назад

    Gud

  • @朱拜勒轻骑兵
    @朱拜勒轻骑兵 4 года назад

    What's the next? How to remove the belt? How to do the welding for the remaining?

    • @utubedigitalmedia4590
      @utubedigitalmedia4590 3 года назад

      First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.