Cross Country Pipeline project. - 48" TANAP Gas Pipeline Construction, Turkey.
Trans Anatolian Natural Gas Pipeline (TANAP) project Turkey, 48" TANAP Gas Pipeline Project, Activities include Right of Way (ROW) preparation, Pipe Transportation, Pipe stringing, Pipe joint fit-up, Pipe joint welding with Automatic Welding Machines. Construction Equipment used are Liebherr Excavators, Liebherr Pipe Layer / Side boom, Liebherr Paywelder, CRC Internal Line up Clamps, CRC Internal Automatic Welding machines, CRC Automatic external pipe welding machines etc. Cross Country Pipeline.
Просмотров: 3 652
Видео
Fiber Optic Cable splicing / jointing.
Просмотров 2,5 тыс.3 года назад
Fiber Optic Cable splicing / jointing with fusion splicer T-400S of Sumitomo Electric. FOC cable splicing for Broadband Internet Connections and Telecommunication cables.
Gas Pipeline Construction - Pipeline Lowering in to the trench in normal terrain.
Просмотров 62 тыс.4 года назад
Gas Pipeline Construction - Pipeline installation in to the trench in normal terrain. Pipeline lowering-in to the trench using Liebherr pipe layers. This video will demonstrate how to lower a pipeline section safely.
Gas Pipeline Construction - FOC Chambers.
Просмотров 3325 лет назад
Gas Pipeline Construction - Fiber Optic Cable Chambers in a precast yard.
Gas Pipeline Construction - Equipment set up for lowering-in.
Просмотров 1,1 тыс.5 лет назад
Gas Pipeline Construction - Side Boom and other equipment set up for Pipeline section lowering-in at River crossing. Dewatering by submersible pumps.
Gas Pipeline Construction - Rock Blasting.
Просмотров 1,6 тыс.5 лет назад
Gas Pipeline Trench excavation by Blasting of rocks on the Right of Way.
Gas Pipeline Section Lowering-in at River Crossing.
Просмотров 66 тыс.5 лет назад
Gas Pipeline Construction Project - Pipeline Lowering-in at River Crossing with Liebherr Side Booms (Pipe Layers). Sheet Piling done to avoid collapse of river banks.
How to make Gozleme, Turkish food.
Просмотров 2,2 тыс.6 лет назад
Best street food in Turkey - Gozleme.
Pipeline Bedding and Padding with Allu Bucket
Просмотров 29 тыс.7 лет назад
Gas Pipeline Construction Project - Bedding, Pre-padding and Post Padding without screening plant.
that looks like some sandstone hard diging
What type of welding in Automatic welding like SMAW or GTAW
Worked on the St Fergus too Mossmorran pipeline 1980s am sure the used floating barges to cross the Tay and Earn rivers in Scotland because there was no way you were blocking any Salmon rivers. I never seen that cause I was forth ahead .
I was PM for detailed engineering
Natrai trabajo de operador
ok
Looks like they screwed the welders by lowering it in with not enough pipe into the bell hole . 6 feet (2 meters) past the end of the bell hole is a minimum standard
Looks disorganized and inefficient...lot of wasted time and motions.....would not fly in America...
We used concrete collars bolted on pipe to keep in trench in river
It is simply a great job for those of us who like laying gas pipeline lines. I invite you to my channel, friends of the industry. youtube.com/@RICHOil?si=npvd06lwODBuBz03
Amateur hour!
Circus asalam walekum chahie Sanam bacche ghar par Patang wala boliye 0:03 0:03
That is by far one of the worst starts I’ve seen with lowering in for trying to get the pipe on the ground. Catch that swing, it should never hit the side walls like that, while it might not do much damage, that is complete amateur hour for those boom hands .
That was pitiful watching that pipe swinging hitting the edges of the ditch. The GREEN TEAM?
What was that like who’s welding that tie in
I miss this job...1993 Qatif Junction and Ju' aymah pipeline, Saudi Arabia.
Are Liebherrs that old?
سايدبوم
The rest of the crew is long gone, you would need 100 of these things to keep up.
How long pipeline can be lowered with side booms in single operation?
Endless, they assemble on top, weld it, check it, and a mile (or whatever) down the road the pipelayers put it in.. the system can keep going on as long as you need it to be. 🙂 You do not want flanges underground, these will give you trouble.. flanges do not flex, they rust, leak, are weak points. If they need to divide the pipe to put in a shutter or pumping system, they weld a curved pipe so it comes above ground, en only above ground will be flanged because it needs maintenance. Everything undergroung should be welded. Overnight the sidebooms will just stop, and the pipe might be secured on top with a nice beefy bulldozer to make sure everything is still upright in the morning or after heavy rainfall. I have done it a couple of times with crawler cranes, which is waaaaayyyy slower and seriously tricky.. sidebooms are old fashioned equipment that is still best suited for this job.
can i ask sth. when are the hidrostatic tests done? after lowering? which norm (asme) state that? regards
@@the0hatusa normally the testing is done after it’s been lowered in.
For welding i would like to work there.
Tüm emeği geçen herkesin eklerine sağlık orda çok güzel bir çalışma oldu
siz da orda calisiyormusunuz?
Salam sizde orda çalışdızmı
What is that green colour coated in the welded field joints
FBE
seam coating@@mlctv6475
Pretty sure they caught the sides of the trench when they started. Coating damage ?
Easy to repair ...but before that, it would undergo holiday testing first.
Yeah right 😂 coating damage, hit the trench twice before she hit the deck
And the floaties on top were needed for what?
to fill with concrete so it does'nt float
Kis jagha ka hai
Nice sir 👌
Nice u
This is a Cross country gas pipeline construction video.
nice..
Thanks
Great video. Our new invention allows you to build a continuous pipe of any size onsite, eliminating virtually all transportation costs and leaking joints. ruclips.net/video/EGsipDj0dEA/видео.html
Machine is good or bad plz suggest me
This machine is being used by Broadband service providers.
I can't be 100% sure but it looks like that pipe isn't coated?
yes the joints need to be coated , not sure how they gonna do it inside trench
Pipes are factory coated with 3 layer PE.
Joints were coated outside the trench prior to lowering-in.
Awesome job! 👌
German style
Nice!
Thanks
I bet he's still there finishing that job!!!!!
No kidding.... Not all ideas are great...
Project already completed and commissioned.
Now that was so perfect. Very nicely produced.thank you for the share
Thanks
I wish we had equipment like that back in the 1960s.We ran 16 inch gas lines with one 944cat loader with a sideboom.
Who makes that sideboom,is it German made?
It is a Lee bear 64 one of the finest pieces of equipment I have ever ran yet and the John Deere 1050 K
@@ericbrown375not the biggest fans of the Liebherr to be honest, but I came from the open cab era so little biased. The 1050’s are the Rolls Royce for sure though
Unbelievable equipment.Back in 1960s the company I worked for ran 28 miles of 12 inch gas line with one 944Cat louder and four welders.
How to fuck a river up
River will be re-instated to the original condition after the pipeline laying work is completed.
grow a pair ding dong they fix it after
Gud
What's the next? How to remove the belt? How to do the welding for the remaining?
First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.