Pirton Level Crossing revisited - again

Поделиться
HTML-код
  • Опубликовано: 6 сен 2024
  • Wadborogh South, sorry, Pirton Level Crossing (I stand corrected on the name of this crossing) revisited - again. A few random trains passing. Keep watching to the end...

Комментарии • 45

  • @joshtaylor6668
    @joshtaylor6668 8 лет назад +18

    The strange chirp could be a way of a thank you for waiting at the crossing

  • @everllevels56
    @everllevels56 6 месяцев назад +1

    0:29 activation 1
    1:35 tailring1
    1:55 LEDs
    2:07 activation 2
    2:46 tailring2
    "that strange chirp of the siren and flash of the lights” is a Tailring

  • @danmagnox8006
    @danmagnox8006 7 лет назад +8

    The lights were changed due to the regulations. All standard bulb ones must be replaced by LED due to sighting issues. There are still some bulb ones left around the country, more than likely due to either lack of funding or none priority. The flash at the end tends to happen at several automatic crossings but no exact reason as to why. Brilliant video though.

    • @MTrains
      @MTrains 6 лет назад

      The late barrier raising on the other side may be to do with the chirp at the end!

  • @hmcdsinger
    @hmcdsinger 8 лет назад +7

    Heh that chirp is adorable (if you can call a level crossing adorable..)

  • @MumblesPyro
    @MumblesPyro 9 лет назад +2

    That final flash at the end means "Thanks for waiting"

    • @FlashingRedProductions
      @FlashingRedProductions 9 лет назад

      +Mr. Huddah I was at Pirton L/C today. That flash at the end i knew was still there. But sometimes when barriers had just raised it didnt do that flash (Thanks for waiting).

  • @Bobrogers99
    @Bobrogers99 5 лет назад +2

    At most UK crossings on a number of other videos, the lights, alarm and gates are activated up to two or more minutes before the train arrives, and almost never under a minute. Here, the train is there 20 seconds after activation! People who are in the habit of sneaking through other crossings after the warnings are activated could have a nasty surprise here!

    • @GreatBarrWolf
      @GreatBarrWolf 4 года назад +2

      The reason for this is that the video footage appears edited @ 0.45 - Also, with respect, the train engages the crossing @ 27 - 28 seconds from the edited version, not 20 seconds!

    • @rocketboysmc
      @rocketboysmc Год назад

      near me its between 4-5minuites and sometimes even 15minuites before the train arrives. and it casues tailbacks. plus it can be buisy on the rails and have multiple trains pass meaning the barries can be closed for up to half an hour!

  • @danielanderson5227
    @danielanderson5227 8 лет назад +3

    i like the old lights being honest

  • @cannadineboxill-harris2983
    @cannadineboxill-harris2983 Год назад +1

    I needed to know why don’t dig a tunnel and do an extension for the main line Train so that they could extend the unused abandoned underground stations.
    Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock and that includes the class 313, class 314 and class 315 remix and make them all together and also redesign them an overhead line and also make them into Five cars per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Volvo TD102KF, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Engines and also put the Loud 7-Speed Voith Gearboxes even Loud 8-Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into an 11 car per unit so it could have fewer doors, more tables, computers and mobile phone chargers.
    A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it bigger and extend it to the bank station, making it into a Triple-Track Railway Line so those 4 European countries such as Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Train tunnel into a High-Speed train?
    The Third Euro tunnel Triple-Track Train line to make it 11 times better for passengers so they could go from A to B. then put the modernised 11 car per unit A Stock and put them on a bigger modernised waterloo and city line Triple-Track train tunnel so it could go to bank station to those 4 European countries such as Germany, Italy, Poland And Sweden. The modernised refurbished 11 cars per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 37 times a lot more possible to do this kind of project that is OK for London Germany, Italy, Poland And Sweden.
    oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Germany, Italy, Poland And Sweden Easily.
    Why couldn't they extend the Piccadilly line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street and also make another brand new tunnel train stations in Chingford could they extend the DLR?
    All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Volvo TD102KF, Volvo B10M, Gardner 6LXB, Gardner 6LXC and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains.
    Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and they can order Every 17 Octagon and Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 117MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 117MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!, oh can you make all of those Coal Boxes’s 16 Tonnes for all of the 117MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!!! so please make sure that the Builders can do as they are Told!!!! And please do something about these critical Professional ideas Please Prime Minister of England, the Prime Minister of Sweden, the Prime Minister of Germany, the Prime Minister of Italy, the Prime Minister of Poland and that Includes the Mayor of London.

  • @JamieHathawaysTrainsandGames
    @JamieHathawaysTrainsandGames 7 лет назад

    Nice video I went to that crossing about eight years ago

  • @karlarodriguez1547
    @karlarodriguez1547 9 лет назад

    like the old led lights have not be here forever but theres New led lights i love it.

  • @the_alex_ellis_channel6923
    @the_alex_ellis_channel6923 8 лет назад +3

    The ending chirp and flash is most likely down to the logic that controls the crossing....if they replaced the lights, but didn't change the logic, then it will still be there.

    • @ChilternRailPhotography
      @ChilternRailPhotography 3 года назад

      Its put there on purpose by Network Rail as a sort of Thanks for waiting flash

    • @UKLevelCrossingsTrains
      @UKLevelCrossingsTrains 2 года назад +1

      @@ChilternRailPhotography Wrong

    • @ChilternRailPhotography
      @ChilternRailPhotography 2 года назад

      @@UKLevelCrossingsTrains Well thats what I was told anyway + a few other crossings do it I think and that's what most people call it I believe

    • @UKLevelCrossingsTrains
      @UKLevelCrossingsTrains 2 года назад

      @@ChilternRailPhotography It’s actually cause one barrier is slower than the other, so the crossing thinks the barrier failed to raise so reactivates, but it’s just a bit slow

    • @SouthWestCrossingsUK
      @SouthWestCrossingsUK Год назад

      ​@@UKLevelCrossingsTrainsyes

  • @nathanwilliams1798
    @nathanwilliams1798 3 года назад +1

    How far down line are both crossing activated at same time

  • @yabbaguy
    @yabbaguy 9 лет назад

    The barriers don't rise at the same speed, maybe that's why the blip at the end occurs?

  • @Thunderbolt_1000T
    @Thunderbolt_1000T Год назад

    why is the thing where the lights are grey?

  • @cardboard_is_not_edible
    @cardboard_is_not_edible 5 лет назад

    What is the crossing that is along the line when you zoomed into the CrossCountry?

    • @wylzo499
      @wylzo499  5 лет назад

      This is Wadborough Level Crossing; it is more or less the same road crossing back over the line after the village of Wadborough. A video is here ruclips.net/video/sQCK7zYjz4o/видео.html - at the end I zoom in to follow the passing train and you can see the barriers of Pirton crossing raise once the train has passed.

  • @delwalia
    @delwalia 6 лет назад

    Ooh that’s was a fast train there

  • @levelcrossingsandformula1c604
    @levelcrossingsandformula1c604 7 лет назад

    wow I love the LEDs is now upgraded last time the old halogens

  • @MeesterMichelM
    @MeesterMichelM 4 года назад

    I've seen it before in other clips. Might be intentional. 🤷‍♂️

  • @laytonburr
    @laytonburr 9 лет назад +1

    I know why they changed the lights because the paint was rubbed off on the old ones

  • @danielstrains168
    @danielstrains168 8 лет назад +1

    broken alarm

  • @gtnighthawk4414
    @gtnighthawk4414 8 лет назад

    i didnt realise it said 9th of august
    thats a day after my birthday lol

  • @gtnighthawk4414
    @gtnighthawk4414 8 лет назад

    good video . except
    i like this crossing but i hate the alarm but not the classic alarm like the old one from ScruffWood's of pirton level crossing with the class 66 . why would they mix up 2 alarms when the old one sounds better .

  • @WMRailSpotter
    @WMRailSpotter 4 года назад +1

    1:36 light malfunction

  • @cristobalcampos2011
    @cristobalcampos2011 4 года назад +1

    Loud

  • @danielstrains168
    @danielstrains168 8 лет назад

    come to hykeham on saturday

    • @wylzo499
      @wylzo499  8 лет назад

      +Daniel Brown Sadly I work Saturdays, and am tied up with work right up to xmas.