Pre Drywall Walkthrough on another house!

Поделиться
HTML-код
  • Опубликовано: 2 июл 2024
  • Here is a New Home By Bon Ton Builders in Hanover PA. Call 717-637-4136 and get started on your Dream home today!!
  • ХоббиХобби

Комментарии • 1

  • @PKJae
    @PKJae 23 дня назад

    Thanks for the walkthrough. I am in process of getting ready to build a home. When does the blocking go in for cabinet hangs in the house (kitchen, bathrooms, etc) and for things like toilet paper mount, towel racks, curtain rods, etc?
    Also, I have heard that the framing system should use midspan offset blocking in each stud cavity/bay (all exterior & interior walls), because it reinforces wall structural strength, reduces stud bowing(crowning)/twisting and avoids stud vertical compression/buckling. Do you plan to use this type of blocking before insulation goes in? This type of blocking is not fire blocking, that is a separate subject.