Phase 2 construction Episode 4

Поделиться
HTML-код
  • Опубликовано: 1 окт 2024
  • Continued construction of my HO scale model railroad layout. This episode focuses on construction of McClusky hill which is a 2% to 2 1/2% incline from the Mainline to the mining operation.
    Cardboard strips were webbed together covered by plaster cloth to create the hill surface. Drywall compound and textured primer formed the face of the Hill.
    A special Thank You to Charlie of the Chadwick Model Railway for inspiration on constructing the incline.

Комментарии •