Nemesis Testing Sunday 3rd March 2024 Alton Towers

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • Nemesis Testing today Sunday 3rd March 2024
    the roar is still there but definitely quieter
    they were running trains constantly

Комментарии • 15

  • @crashcoaster3852
    @crashcoaster3852 6 месяцев назад +1

    I'm sure that lift hill is faster than it used to be.

  • @renegade-master29
    @renegade-master29 6 месяцев назад +5

    I've heard King Charles will be the first to ride it on the official opening day

  • @Supermkdons
    @Supermkdons 6 месяцев назад +5

    It still got it raw

    • @ianclark3953
      @ianclark3953  6 месяцев назад +2

      I thought it sounded a lot quieter than it used to, sounds very smooth

    • @Supermkdons
      @Supermkdons 6 месяцев назад +1

      @ianclark3953 it do sound quieter then it was. But it still got the raw that's the main thing

  • @tosspot1305
    @tosspot1305 6 месяцев назад +2

    Actually looks slower if that's even possible.? Never seen it struggle like that on the loop before, even when empty

  • @MvsticDreamz
    @MvsticDreamz 6 месяцев назад +1

    im going on my birthday 16th march cant wait

    • @Shushurmush575
      @Shushurmush575 6 месяцев назад

      Same!

    • @MvsticDreamz
      @MvsticDreamz 6 месяцев назад

      you have same birthday? thats so cool!@@Shushurmush575

  • @cooliuswizard4034
    @cooliuswizard4034 6 месяцев назад

    Not as loud but still cool and wonder how they did that without the sand?

    • @edwardlack2578
      @edwardlack2578 6 месяцев назад

      The sand is in the supports rather than the main spine, and I think in the rails too

  • @Boybuildsnotfnaf
    @Boybuildsnotfnaf 6 месяцев назад

    China