Hi Julia really enjoyed your video today You made a really good job of machining the smoke box ring 👍🏻👍🏻 I must say I find it very therapeutic watching someone machining metal down on a lathe It will look good when it’s altogether I am sure 👍🏻👍🏻👍🏻👍🏻🚂🚂🚂🚂
Happy Sunday morning Julia, have you checked the centre height of the boiler, it may be its set too low. I'm not looking forward to my 2 1/2" Dyaks boiler lol
Nice job on the smokebox ring Julia👍👍👍👍🚂🚂🚂🚂 Can't offer any solution to the boiler fit other than, Looks like the Weigh "t" shaft needs modifying Someone likes "Quality Street"😄😄😄😄👍👍😉😉🚂🚂🚂🚂 regards kev
Great use of material. I think I would lift the smoke box by 2-3mm with a larger spacer plate. The fire box grate looks to low if this was also lifted to allow better fit up and would avoid interference with bolt heads.
Hi Julia really enjoyed your video today
You made a really good job of machining the smoke box ring 👍🏻👍🏻
I must say I find it very
therapeutic watching someone machining metal down on a lathe
It will look good when it’s altogether I am sure 👍🏻👍🏻👍🏻👍🏻🚂🚂🚂🚂
Happy Sunday morning Julia, have you checked the centre height of the boiler, it may be its set too low.
I'm not looking forward to my 2 1/2" Dyaks boiler lol
Nice job on the smokebox ring Julia👍👍👍👍🚂🚂🚂🚂
Can't offer any solution to the boiler fit other than,
Looks like the Weigh "t" shaft needs modifying
Someone likes "Quality Street"😄😄😄😄👍👍😉😉🚂🚂🚂🚂
regards
kev
I know Kev 😳 trying to think and speak at the same time never works that well. 🤣 What can I say? I'm a Quality Gal ☺️
Great use of material. I think I would lift the smoke box by 2-3mm with a larger spacer plate. The fire box grate looks to low if this was also lifted to allow better fit up and would avoid interference with bolt heads.