Solar Installers get a SHOCK at an Installation

Поделиться
HTML-код
  • Опубликовано: 28 дек 2024

Комментарии • 9

  • @Roobubba
    @Roobubba 8 месяцев назад

    Jez and his team worked for Heatable on our solar/battery install back in February, and I cannot praise them all enough for the care they took and the quality of the work they all did to get our system installed.
    The microinverters were what first led me to Heatable, and i couldn't be happier with the results: we charge the givenergy AIO battery at 7.5p/kWh overnight on intelligent Octopus go, then export as much solar during the day as possible at 15p/kWh, so we're not using the solar to charge the battery, but instead load shifting the grid power. That means we don't have meaningful AC/DC conversion loss issues compared to a string inverter system with DC coupled battery, because the solar is being used in the house with excess exported.
    Top teams! And where we had some queries and technical issues related to our weird house, they were sorted out so quickly, that's the real test of a company's customer service, and Heatable (and Jez's team!) were absolutely great

    • @Heatable
      @Heatable  8 месяцев назад +1

      always lovely to hear this feedback - we'll pass the kind words on to Jez and his team ❤

  • @Davem100
    @Davem100 8 месяцев назад

    Great product and great video! I think you’ll dominate the solar industry within the year.

    • @Heatable
      @Heatable  8 месяцев назад

      Thanks Dave - that's the goal 🚀

  • @shrugitov
    @shrugitov 8 месяцев назад

    Is there an IQ Envoy module fitted to this system, didn’t hear it mentioned?

    • @Heatable
      @Heatable  8 месяцев назад

      Yes this system had an Enphase Envoy IQ Gateway fitted.

  • @wajopek2679
    @wajopek2679 8 месяцев назад

    A premium “glass on glass panel” (ie bifacial) with integral IQ8 has to be the way to go. No white plastic to delaminate and peel off after a number of years….which you cannot see either till a problem occurs.

  • @alanc1406
    @alanc1406 8 месяцев назад +1

    I don't think the dno would approve of the meter box being used to house sub mains. Tell me if I'm wrong. I'm not an electrician

    • @spikemonster95
      @spikemonster95 8 месяцев назад

      You are correct. I was only made aware of this after my installers did the same. ruclips.net/video/864pJSfAuOY/видео.htmlsi=xpnAyujR3w2IWKj4