    @odysseusrobert6615 3 года назад +2

    Hi miss, may I know if there is any possible way for me to get this complete standards of the book Design of normal concrete 2nd edition?

  • @theotema2053
    @theotema2053 Год назад

    What if we have both uncrushed and crushed aggregate in 1.6? Do we assume 2.65 or just take 2.6/2.7?

  • @dineshedirisooriya1992
    @dineshedirisooriya1992 3 года назад

    Thank you. Very important sharing.

  • @alleyamegoie2369
    @alleyamegoie2369 Месяц назад

    thank you !

  • @khalidali3141
    @khalidali3141 3 года назад

    Mam what if, maximum size of coarse aggregate is 13mm rather than 20 mm, then how can we determine the free content ,as in the maximum size of caorse aggregates are 10mm,20mm,40mm, plz guide me i'm so confused 😕

  • @acaphesmes3079
    @acaphesmes3079 2 года назад

    macam kenal suara ni hehehe Dr. ajar subject structure design

  • @izmihaikal1898
    @izmihaikal1898 4 года назад

    what if the cement content is larger than both maximum and minimum? 17:57

    • @structureandmaterialincivi5611
      @structureandmaterialincivi5611  4 года назад

      If the cement content calculated using equation C3 is larger than maximum cement content and minimum cement content, it is thus impossible to continue the mix design. Amendment need to be done by change the type of cement or cement strength class or both.

  • @fahmieffendi2901
    @fahmieffendi2901 3 года назад

    what does mean of unrestricted design?

  • @16jaaroudmeisje19
    @16jaaroudmeisje19 3 года назад

    bien hecho

  • @enghassan1405
    @enghassan1405 3 года назад

    Thank you

  • @aziemullahumar6511
    @aziemullahumar6511 3 года назад

    what if data didn't give the min cement data and the 3.1 is larger

    • @structureandmaterialincivi5611
      @structureandmaterialincivi5611  3 года назад

      1. If cement content in 3.1 larger than maximum cement content (item 3.2), you can't proceed the design.
      2. If cement content in 3.1 less than minimum cement content (item 3.3)., use 3.3
      3. If there is no data for item 3.3, you may proceed with calculated cement content as in 3.1