  • @deepakrana4522
    @deepakrana4522 3 года назад +1

    RERA is there to protect builder not buyer.

  • @samchowdhury6230
    @samchowdhury6230 4 года назад +2

    All builders flout law openly no one is there stop them

  • @arunkulshreshtha7336
    @arunkulshreshtha7336 5 лет назад +4

    RERA is an organized Government body which gives full support to the builders who are again very well sheltered by the Politicians. The orders of RERA REGARDING RECOVERY are not at all executed at ground level. RERA has not been successful in getting the possession of the flats to the buyers. BY ALL MEANS, IT IS BENEFICAL TO THE BUILDERS AND NOT THE BUYERS.

    • @Sequeira1989
      @Sequeira1989 2 года назад

      I agree to your above comment. Rera is an organised body which gives full support to the builders, Builder registers his projects with Rera, giving a certain dt of possession, but does not handover possession on that date & again approaches Rera authority for extension of date to complete his project and Rera gives permission to extend for another 2 years, With no relief for buyer who is waiting for 10 years, The order too given by Honourable Gautam Chaterjee is in favour of Builder with delayed date & year of compensation for Total amount already paid to Builder.Very disappointed with Rera order and again had to Appeal under act 39 of the Rera law.Waiting patiently for a favourable reply from the time registered complaint in the year 2017, 7 years have past, Builder is still waiting to receive OC to handover possession of my flat and to compensate from deducting in final amount under Rule 18 of Rera Act.

  • @shailendrabhati5807
    @shailendrabhati5807 4 года назад +1

    प्रिय सर,
    मैं जोधपुर (राजस्थान) से हूँ मेने RERA रजिस्टर्ड प्रोजेक्ट में विला खरीदने हेंतु (एक लाख) 100,000 रूपये बिल्डर को बुकिंग हेंतु दिए, विला की कीमत 16,00,000 रूपये हैं, बिल्डर के साथ एग्रीमेंट होने से पहले मैंने फाइनेंसियल रीज़न से बुकिंग कैंसिल करवाई है, बिल्डर रिफंड देने से मना कर रहा है, इसके बिल्डर तीन कारण बता रहा है ___1. बुकिंग कैंसिल एक महीने के पहले नहीं करवाई, 2. बुकिंग का GST जमा करवा दिया है , 3.हमारी कंपनी नॉर्म्स के हिसाब से बुकिंग कैंसिल करने पर रिफंड नहीं करते.
    मुझे कहा शिकायत करनी चाहिए ..?? RERA नॉर्म्स के अनुसार मुझे रिफंड मिल सकता है क्या.. .?? रिफंड प्राप्त करने की क्या प्रक्रिया है. ..??
    कृपया मुझे इस सम्बन्ध में जानकारी देने की कृपा करे. .....!!!!

  • @RajeshKumar-rr8gm
    @RajeshKumar-rr8gm 2 года назад +1

    श्री मान जी मैने july 2016 मे खेल गाव ग्रेट, नोएडा w मे book करवाया था। Ma ajnara buld, को 11लाख 18th, दे चुका हु pardhanmatri आवास योजना के तहत सर्विस person को ajnara buld, ने बेचने के लिए काफी लुबावने परचार किए pardhanmantri जी के नाम से काफी परचार किया था। आज तक वाह ना कोई काम हुआ है। ना ही buld, कोई जबाब देता है। मै seniour citizen retirement hokar दर दर की ठोकर खा रहा। बुढापे मे मरने की कगार पर पुहंच गया हु। आप batlay मुझे क्या करना चाइये। या चुप बैठ कर गुट गुट कर मौत का इंतजार करना चाइये 🙏 ये नामी grami Ajnara buld. का हाल है।

    • @Sequeira1989
      @Sequeira1989 2 года назад

      Register online complaint against builder in Rera who is delaying the Bldg project and also not giving compensation or showing responsibility to complete the Bldg in time.Go to Rera office in Noida or Delhi enquire and take help to register online complaint against Ajnara builder

  • @sandeeppatnaik4519
    @sandeeppatnaik4519 5 лет назад +2

    1). If the promoter( landlord or investor) or builder does not Agree to the RERA clauses to be put in agreement for sale even though the project is RERA approved, what can be done in such situation? Are we as buyers still eligible with all RERA rights even though the clauses are not part of Agreement of sale or sale deed?
    2). When we approach to some promoter or builder, they insist on cash payments and term it as legal by registering the property at a lower cost than the actual sale consideration. Even though the subregistrar is aware of this, they still don’t question the buyer and seller. What action can be taken according to RERA ? If we disagree for such transaction, they deny the property to us. What provision we have to deal with such cases? Strange part is it’s such a deep rooted problem in our society, people say property dealings are not possible without black money.
    3). Where do we get to see registered real estate agents? We still see many brokers and agents are still marketing without being registered under RERA. What can be done if the agent is not revealing their RERA Registration number? Where in RERA, can we raise our voice if they are misbehaving or threatening us?
    4). What precaution should we as buyers take while giving token money? Some times it’s so fast that we can’t go for a bond paper deal for token money. Bond paper is scarce now in our city as well. Promoter and builder take advantage of that and deny the property later on after the token money is paid and many times we have to run after them to get that back. In my case the dealers threatened me of not giving my money back. They did not turn up for agreement and blamed me for delay in further payments and missed date of agreement of sale.
    5). What RERA can do if we see a Nexus of bankers, promoters and builders or any other powerful set of people who dominate and bully over the rights of a common buyer. Can we give an anonymous complaint? Anonymous because it’s not only a risk to a single person but the entire family.
    6). People in the real estate field get away with black money transactions day in day out and forcing common genuine buyers to do the same. What can RERA do to control this menace and can this be investigated from your side upon complaint? I as a common buyer might not be able to give you credible evidence as we don’t intend to gather evidence like this during our purchase but we come across these demands of cash transaction.
    7). What are the clauses for TDS? Is it applicable for property with a work order ? For example, if the total sale consideration is 80 lakhs, work order is generated for 40 lakhs and the sale deed is executed at 40 lakhs.
    8). Some promoters and builder mention the date of completion to the maximum limit in the RERA links but they don’t need that much time line to complete the project. Is there any way RERA can audit such information as per their other documents that they share with Muncipal corporation, Development Authority, Banks etc.
    9). What can we as buyers if we don’t get enough transparency in getting all the information from the promoters or builders.
    10). Many a times even with construction linked payments, the builder constructs to an extent(example until slab work) where they can gain the maximum lump sum and the buyer keeps on paying interest until possession and it’s clear that the other part of construction goes very slowly where the money disbursement is low in that phase of construction.

  • @vikassawkar8268
    @vikassawkar8268 3 года назад

    RERA is beneficial to the builders Any purchaser is booking flat for his n family's use But there is no provision to provide alternate flat instead of termination of Agmt There must be provision to give alternate flat of same area,cost and as per location choice of the purchaser Vikas Sawkar Panaji Goa

  • @krishnashukla644
    @krishnashukla644 5 лет назад +5

    Ab to rera hearing ki date bhi builder ke according milti hai

  • @amolkadam8444
    @amolkadam8444 6 лет назад +2

    Mr . Gautam Sir ,you infomed runwal builder to returned rs 283069 and resolved issue with understanding at time of hearing but till Runwal builder not returned my amount.Runwal builder take 24% Rate of interest on delay payment and forfait all paid amount. please take action against runwal builder.

  • @sunitawakalkar2243
    @sunitawakalkar2243 2 года назад

    Without receiving OC builders shouldn't be allowed to sell the flats

  • @naveedshaikshaik6069
    @naveedshaikshaik6069 5 лет назад +1

    sir xrbiya may bhi yahi huraha hay

  • @rameshvyas9824
    @rameshvyas9824 4 года назад +1

    Builder ko member ko 100 0/0 bandhkam dena farjiyat hai.58 0/0 dete hai.kya kare ?

  • @bcool1364
    @bcool1364 6 лет назад +2

    Why rera is not cross verifying information submitted by builder.reta is supporting builder.

  • @honestfeedback5331
    @honestfeedback5331 3 года назад

    Karmvir group ...he has promised possession in 2016 and till 2021 march not able to obtain OC. Playing with lives of people. One buyer went to Rera but his payment cheque bounced he started writing poetries to shame builder and rera. Please just investigate this builder could be a big fraud. He has more than 15 on going projects. All in progress he is just routing money from one to another. Sad fact is RERA is protecting builders.

    • @naseemahmad1905
      @naseemahmad1905 11 месяцев назад

      For sure. In fact builders are controlling RERA.

  • @naturaltips2245
    @naturaltips2245 5 лет назад +1

    Form 16 by JKG construction Noida changed from 30-06-18 to 30-06-19 without cause of Major Force. Sale deed not made. In allotment letter no possession date mentioned, no action taken by Rera.

    • @HSShorts176
      @HSShorts176 5 лет назад

      I booked a flat in JKG palm court ....in 2017...I have facing same problem .....

  • @jagdishkadu4481
    @jagdishkadu4481 5 лет назад +1

    Most of builders taking cash & not giving receipt e.g.Vishal Infrastructure nagpur

  • @anitathakur2505
    @anitathakur2505 4 года назад +3

    रेरा को पैसे खिलाते हैं बिलडर और मनमानी करते हैं बिलडर..???

    • @shashipandey2298
      @shashipandey2298 4 года назад

      बिल्डर अफोर्डेबल हाउसिंग का अपने हिसाब से पैसा ले रहे हैं

  • @cinemediacombines1130
    @cinemediacombines1130 2 года назад

    रेरा अथार्टी के आर्डर को बिल्डर मानते ही नहीं है। मेरा फ्लैट BPTP पार्क एलिट फ्लोर में है। 13/90/21 को रेरा कार्ट का आर्डर आया लेकिन बिल्डर मानने को तैयार ही नहीं है।

  • @vithaldasbhandarkar8596
    @vithaldasbhandarkar8596 3 года назад +1

    shayad RERA bhi currupt to nahi?, kyo ki Sarkari agency hai.

    • @naseemahmad1905
      @naseemahmad1905 11 месяцев назад

      Clear your dought and let us know

  • @amolkadam8444
    @amolkadam8444 6 лет назад +2

    Without any action on Runwal builder,maharera closed my case. I have send so many mail to maharera but I haven't received single reply. and not submitted closing reported.

  • @vishaldoshi6641
    @vishaldoshi6641 2 года назад

    Some builder are asking GPA which overrides GPA

  • @Sunitajoshi711
    @Sunitajoshi711 2 года назад

    Commited things not provided or changed them?? Swimming pools, garden or jim ka lalach dekar bad me manahi?? To kya??

  • @chhayamane3948
    @chhayamane3948 2 года назад

    Rera la registration rules mufa mai accepted hai kya please inform 🙏

  • @rockingflute4772
    @rockingflute4772 4 года назад +1

    very we are fighting against one builder and up rera has given wrong judgement , rera is totally protecting builders

  • @gajodharpatel1219
    @gajodharpatel1219 4 года назад

    Sir, many builders and developers are not registering themselves with RERA. But Registration and Stamp Duty is collecting in Restration office. Can we say such projects are legal one . ??? And can the consumer trust on such projects??? Pls reply

  • @kirankulkarni7146
    @kirankulkarni7146 5 лет назад +1

    From past one year I am waiting for registration . He had given in agreement by 2018 but still pending . I am from Karnataka. How to get my compensation . Even in parking place builder has constructed a flat so we r having parking problem. Still work Not completed we r fed up of giving interest in bank and people staying in dust

  • @GANESHKUMAR-gg5yw
    @GANESHKUMAR-gg5yw 4 года назад

    Sir nanbanking company alchemist ghotale ke bare me batayiye realstate or tounship per paisa lekar nahi lauta rahi hai

  • @lifewithazina6088
    @lifewithazina6088 6 лет назад +3

    Builder ko 10% say jyada nahi Lena hai. Air builder ko agreement banwana honga .lekin Jo builder 70% take lekar bhi agreement nahi Kiya hai uska koi punishment nahi hai . Ye tho rera help Kar raha hai builder ko

    • @abcdxyz3255
      @abcdxyz3255 5 лет назад +1

      Abey chyute ,bina agreement koi 70 takka deta hai kya koi.. chyutyapa tum karo ..aur REra pe ungali uthao.. India ka public chyutya hai .. BJP bhi chyuti hai jo beakal public Ko RERA diya , pahele hi achha tha builder gand marte the logo ko aur log fir bhi chyute hai..

  • @cinemediacombines1130
    @cinemediacombines1130 2 года назад

    प्रतिशत से मुझ पर ब्याज लगा दिया गया बिजली मिटर पर लगने वाले खर्चे पर भी 9.5 प्रतिशत ब्याज लगा दिया गया इसके बावजूद बिल्डर रेरा अथार्टी के आर्डर को मान ही नहीं रहा है और मुझे अभी भी परेशान कर रहा है।

  • @ramkrishansharma6654
    @ramkrishansharma6654 2 года назад

    फ्लैट की कीमत के अतिरिक्त बिल्डर कार पार्किंग क्लव एस टी पी एवं बिजली और अन्य मदों के नाम पर लाखों लाखों रूपये लिये जा रहे हैं क्या यह रेरा के अन्तर्गत आते हैं बताने का कष्ट करें धन्यवाद जी

  • @kirtinaik3292
    @kirtinaik3292 5 лет назад

    The project liberty horizon ten square in Karjat advertising without rera number

  • @sureshjain6785
    @sureshjain6785 4 года назад

    Rajasthan Govt is diluting RERA ACT-2016. The RAj asthan Govt has not constituted REAT & REAT in the terms pof RERA ACT-2016- section 20 ,43. as consumer have reached a stage that they have no option but to suicide to get relief from fincial stress- emiof bank and rent for living unit

  • @yogimukhia1648
    @yogimukhia1648 6 лет назад

    Yes.... How to deal with Builders who are not keeping their promises.\They have taken the fund past six years and more but nothing happens. No time line ?

  • @mhadainfo5705
    @mhadainfo5705 5 лет назад

    Hello Sir I have So many Problems relating to my flat

  • @sureshhate4471
    @sureshhate4471 3 года назад

    रेरा का डर बिल्डर को नाहि है,सब मनमानी कारभार सुरू है.

  • @pranayjha2229
    @pranayjha2229 3 года назад

    One year extension ke bad bhi flat Nahi mila
    VTP realty ka bat kar raha hun pune

  • @vinodmurarka9754
    @vinodmurarka9754 4 года назад

    Is commercial include in residential property?
    Can passage shown into the leaflet be covered in to commercial shops?
    As effordable flats are calculate into luxuries and by covering the passage area i.e ground floor is the heart of the residential accomodation.
    Lift size should be defined in the leaflets and rera should check.
    It is wel establishment that lift size should be atleast 4ft x 6 ft or more as if any died in 13th floor nobody now can take the dead body by stair.
    It should be taken care that any one is not in a position that they have to use wheel chair but lift is so small that is creating puzzling in entering into lift with wheel chair.
    Further any family have born baby and if he is using stroller and again is uncomfortable to come into lift.
    Further in a small building say 10 storey inwhich 10 offices inwhich there are Three lifts of more comfortable size say 5ft x 6 fts and affordable flats building having 56 flats and are providing Two lifts are non comfortable at all and not suitable for which Rera is not taking care on approval.
    Further every building of affordable flates are having reasonable space both side outside lift instead of one side wall outside lift space is nil or say 6 inch.
    Please advise in the matter.

  • @bcool1364
    @bcool1364 6 лет назад

    Rera even not bothered to check agreement deadline.and giving extended completion date .so no use of rera.

  • @rahulsingla4823
    @rahulsingla4823 4 года назад

    Punjab rera is not doing their job well. They are try to save builders. I have filled complaint but RERA is doing nothing

  • @vinaykaria543
    @vinaykaria543 3 года назад

    What can u expect from dishonest people .

    • @naseemahmad1905
      @naseemahmad1905 11 месяцев назад

      Truly fair judgement.
      😊😊😊😊😊😊

  • @sudhirtalekar5464
    @sudhirtalekar5464 3 года назад

    Rera is a money making institute.

  • @naseemahmad1905
    @naseemahmad1905 11 месяцев назад

    Mere yaha insaf ka dastur hi nahi
    Phir bhi log aate hai insaf ke liye.

    • @naseemahmad1905
      @naseemahmad1905 11 месяцев назад

      Builders ki Jai Ho.
      Builder Bhai Karo kamai
      Aisa mauka kabhi n aayi

  • @theworldoflove8412
    @theworldoflove8412 4 года назад

    रेरा के निर्देश नुसार कारपेट एरिया का पैसा लिया जाय न कि बिल्टअप एरिया का पैसा लिया जाए बिल्डर बिल्टअप एरिया का पैसा लेते है और कारपेट का रजिस्ट्रेशन करवाते है
    अम्बरनाथ से कर्जत तक सारे प्रोजेक्ट

  • @pankajsharma1876
    @pankajsharma1876 3 года назад +1

    Maha rera ko ab builder hi chala rahe hai yesa koi rashta batao ki Rera ke upar court mein case kar sake kyo ki rera me bhi to ek hindustani insan kaam karta hai or upar se unko khane ka moka milta hai to kese piche rahega to aaj ki date me builder jo hai corona ke naam par logo ki fasa rahe hai jab ke 2019 me jitna tha utna hi kaam aaj bhi hai or rera wale 19/20/or ab 21 ki date dedi hai rera ke naam par pareshan logose 5000 ki kamai bhi kar rahe hai rera wale or sarkar lekin talwe chat te wo builder ke hi hai

  • @jagdishshah7789
    @jagdishshah7789 6 лет назад

    Rashmi Star city -naigawn palghar

  • @santoshvarma106
    @santoshvarma106 2 года назад

    Koi sacchai aur imandari se apna kaam karna hi nhi chahte sab baimani se paisa kamana chahte h

  • @satyanarainsharma6140
    @satyanarainsharma6140 3 года назад

    Builder is not transparent and they have powers to influence.....

  • @naveedshaikshaik6069
    @naveedshaikshaik6069 5 лет назад

    sir boking date 2018 diya tha 2019 bulraha hay abhi us ki ofice may 2022 bulraha hay

  • @gajananchavan4256
    @gajananchavan4256 6 лет назад +1

    बिल्डर घर कार्पेट से देता ही नही । कूछ तो किजीए साहब*

  • @gopalanadapattuchakkan1034
    @gopalanadapattuchakkan1034 3 года назад

    MahaRERA is pro big builder body.

  • @naushadshaikh9932
    @naushadshaikh9932 6 лет назад +1

    Kanoon banana Aasan hai usko Amal me Lana Mushkil Hai Kyuki corruption Hamari ragrag me Bhara Hua Hai jo officer iski zimidar hai woh Apna Kaam sahi se nahi karte is wajah se builder apni Manmani kar rahe hai

  • @abhijitsahani944
    @abhijitsahani944 4 года назад

    Rera bahut pehele hona chaiye tha sir

  • @Vijay-xf4or
    @Vijay-xf4or 3 года назад

    रेरा मे हेराफेरी हो गई तब तहसील को सस्पेंड करो.

  • @sunitawakalkar2243
    @sunitawakalkar2243 2 года назад

    Builders original o c nahi de rehe hai or Ghar bech rahe hai

  • @VikasSharma-hi1be
    @VikasSharma-hi1be 5 лет назад

    Mene supertect valley me affordable flat book kiya tha aur kisi karan se mujhe vo cancel krana pdaa but abhi tak mujhe meraa refund nhi milaa 8 mhine ho chuke hi. Rera is not so effective

  • @naveedshaikshaik6069
    @naveedshaikshaik6069 5 лет назад +1

    xrbia vagni ka projact hay

  • @techgyan2871
    @techgyan2871 6 лет назад +1

    Ye to hona hi tha

  • @amolkadam8444
    @amolkadam8444 5 лет назад

    Behavior of runwal builder is not good. critical treatment of your family member then also will not give your money back.Maharera infomed to returned rs 283069 on hearing. he take 24% Rate of interest on delay payment and forfait all paid amount & forced own rule on customer.

  • @deepakrana4522
    @deepakrana4522 3 года назад

    RERA is total Failure favoring only builder.

  • @naveedshaikshaik6069
    @naveedshaikshaik6069 5 лет назад

    awr sir painulti diyah jaraha hay pymnt may laith huty hy tu

  • @aloysiusfernandes7390
    @aloysiusfernandes7390 4 года назад

    Total useless rera I filed a case in rera and lost to the builder without the builder providing any proof I bought a flat in 2011 and I lost my case in 2020 just imagine the case in the builders favour wooowwww...

  • @rodgegr
    @rodgegr 5 лет назад

    Govt. hi Kam nahi karti...to builders to corruption to karege hi na

  • @512477499
    @512477499 4 года назад

    Rera I have raised my concern and my date is on 27 if my issue not solve I will do halla bool

  • @kirtinaik3292
    @kirtinaik3292 5 лет назад

    maha rera also corrupt not taking action against unregistered project

  • @pankajtrivedi5194
    @pankajtrivedi5194 5 лет назад

    RERA again indian government agency nothing remain to say,all r same.

  • @satyanarainsharma6140
    @satyanarainsharma6140 3 года назад

    Any good Activist who could advise me in builders wrong calculations, accounting and transparency. Any mob no, email where I get some guidance

  • @saffron1977
    @saffron1977 5 лет назад

    india green realty took full money from me 6 years ago. nothing is been done yet, promoter Vinod Thaker is booked for fraud and is unreachable. I feel helpless .will the rule of law or law of land help me? any news channel good samaritan activist NGO help me?

    • @Factopedia-r4m
      @Factopedia-r4m 5 лет назад

      Carpet k hisab se ya built up area k hisab se payment karna hota hai

  • @jagdishshah7789
    @jagdishshah7789 6 лет назад

    Mere sath bhi yahi huya hi, Rashmi housing Pvt ltd, Naigawn, dist-palghar,
    Maine booking kiya tha 2010 me,
    Builder bola tha 2013 me position dena tha,
    Abhi rera me Mai dekh raha hu usme time diya hi 2021, 2025,
    Mujhe ye bataw mai kaha jau,

    • @adityashantanu48
      @adityashantanu48 6 лет назад

      Jagdish Shah you file a complaint in RERA maharastra ..

    • @advocatedensonjoseph
      @advocatedensonjoseph 6 лет назад

      What is the value of your Flat.Send in all details with copies of the agreement to my email ID advocatedenson@gmail.com will advise you after studying the details.

    • @bcool1364
      @bcool1364 6 лет назад

      Jagdish Shah consumer court

    • @rameshduhan4829
      @rameshduhan4829 6 лет назад

      Zrkpur m motiya royal citi ambala chd road pr h yaha builder maintainance bhi ly raha h or ifms bhi residents ka use kr raha h usny kai prkar ki kamiya h floor tile bhi leveld nahi h bath room ka pani bhi vipor sy nikalna pdta h walls pr sipage aa rahi h carparking area bhi pura nahi h logo sy carpat bada kr rs charge kiy gy h pdos m ak building ban rahi jiska kam din ratt chal raha h jisky karn old age or ill people suffring ho rahy h hamry builder n dusry builder sy agreement kr liya h ki vo hamara sari eminanties use kr sakta h but dusra builder n koi bhi rs maintainance or ifms rwa ko nhi deya h but his residents our park jim swiming pool club house use kr rahy h but not paying single paisa to residents rwa request for handed taken of building charge with maintainace and ifms complete charge he can not ready kindly guide us for next course of action

  • @AN-uf7mk
    @AN-uf7mk 4 года назад

    RERA is useless system .....start forward the issues to direct PMO office for resolution

    • @pratikahire806
      @pratikahire806 3 года назад +1

      Pmo is also useless

    • @gopalanadapattuchakkan1034
      @gopalanadapattuchakkan1034 3 года назад

      PMO will not interfere in real estate cases as real estate business is state subject. Mostly PM Po is a PR excercise, as nd d image building excercise.

  • @bcool1364
    @bcool1364 6 лет назад

    Most bogus law.congress garib ko loot raha tha.bjp amir ko.but lootna chalu hain. Rera builder ke liye hain.

  • @bcool1364
    @bcool1364 6 лет назад

    Rera bogus bogus bogus.

  • @jayshreemayachandra8548
    @jayshreemayachandra8548 4 года назад

    mera ansal lucknow se refund dilaye

  • @krishnashukla644
    @krishnashukla644 5 лет назад

    Sb dekhawa hai. ...dhokha hai.