Its a lot easier to start with an end cabinet. (make sure its level)Then the work your way across with the smaller cabinets across the top to the other end cabinets. Then after they are connected do the table. Do minor level adjustments as you work your way across. Don't do your major tweaking until its all assembled or you will be chasing your tale.
I wanna give a big shout out to the lazy Rick Flar looking guy In the green shirt that all he did was watch you guys work while he just sat on his lazy butt…. But then he redeemed himself!!! Bravo Rick flar !! Oh yeah love the video and results
@@avengednick may I know how much you paid for it? In another video, some users paid between 1400 and 1600 almost a year ago. Not sure if I can wait for the price to go down a bit
I’d have to check, but I bought mine a year ago on sale and everything has increased in price but I believe it was $2k+. Keep in mind there’s a basic and pro option, this is the pro option with thicker sheet metal, those $1400-1600 ones may have been the same configuration in the basic model
Great job!
Thank you!
The set-up is all-Pro, looking forward to seeing some mechanical episodes in the near future. Keep it up very inspiring.
Looks good bro! Makes me excited to finally assemble mine 😩
Can you tell me the thread size of the adjusters the screw into the legs.
Sorry, I’m not sure what size those are and I don’t have an extra to measure
is this finish semi gloss powdercoat or fine tex black?
It’s a fine texture
Its a lot easier to start with an end cabinet. (make sure its level)Then the work your way across with the smaller cabinets across the top to the other end cabinets. Then after they are connected do the table. Do minor level adjustments as you work your way across. Don't do your major tweaking until its all assembled or you will be chasing your tale.
That’s what we did, started with the left end cabinet since that side was slightly higher.
Are these the black or the gray cabinets?
They’re black
@@avengednick Thank you!
@@avengednick Are you still liking them? Have you found any negatives?
for your z what type of diff do you have becasue i swa you said you had a base model isnt it stock open diff
Yup it’s a base model with a welded diff
Why tape it and move d it up if ur putting cabinets up
Cause I can’t help myself and always go overboard. I wanted the wall finished before putting the cabinets up
I wanna give a big shout out to the lazy Rick Flar looking guy In the green shirt that all he did was watch you guys work while he just sat on his lazy butt…. But then he redeemed himself!!! Bravo Rick flar !! Oh yeah love the video and results
Aye put some respect on Papa Avenged! Haha that man provided the guidance throughout the whole project.
@@avengednick 👍🏾👍🏾😆👍🏾👍🏾
$2300 for this
Yes, the cabinets are pretty spending but worth every penny
@@avengednick may I know how much you paid for it? In another video, some users paid between 1400 and 1600 almost a year ago. Not sure if I can wait for the price to go down a bit
I’d have to check, but I bought mine a year ago on sale and everything has increased in price but I believe it was $2k+. Keep in mind there’s a basic and pro option, this is the pro option with thicker sheet metal, those $1400-1600 ones may have been the same configuration in the basic model
@@avengednick yeah, the one I'm eyeing isn't pro ones. Prices kept going up since.