Raimondi gru MRT213 tower cranes.m4v

Поделиться
HTML-код
  • Опубликовано: 4 сен 2024
  • Raimondi Cranes has taken the challenge out of new building projects by including the following:
    Turn Table Group: counter-Jib equipped with all the drives pre-assembled at the factory for faster erection and easy maintenance.
    Maximum Safety: no protruding parts on Counter-Jib. Inclusion of hand rails on the walking platforms.
    Tubular Structure of the Masts: for more stability and less wind resistance.
    Tensile Bolts for Tower Connection: for higher stability of crane, easy dis-assembly and elimination of maintenance.
    Frequency Variation Hoisting Winches: to guarantee smooth engine start ups and reaction time in line with manoeuvring to avoid structural overloads.
    Lebus Type Drums: this is to reduce load oscillations and consequent structural vibrations. It also guarantees longer life of ropes against wear.

Комментарии • 10