KSH.12BILLION EASTERN BYPASS EXPANSION PROJECT Is almost complete In NAIROBI KENYA 🇰🇪

Поделиться
HTML-код
  • Опубликовано: 7 фев 2025

Комментарии • 43

  • @josephkariuki5878
    @josephkariuki5878 2 года назад +5

    Thanks, Good work Siaya, keep it up! Can u pls, also, give us the names of the various sections of the road, by captions, or otherwise. I think this will make it easier for your viewers to get more insight

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад +1

      Thanks soo much for the feedback,,let me do it..

  • @zurucarhire4218
    @zurucarhire4218 2 года назад +1

    This bypasses will be engine for the next growth phase of the city

  • @kenatco967
    @kenatco967 2 года назад +2

    nice shots and great aerial view

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад +1

      The birds enjoy the great views of this nation 👍

  • @zurucarhire4218
    @zurucarhire4218 2 года назад +1

    Great job wuod siaya

  • @kim1570
    @kim1570 2 года назад +2

    I love your spirit, Wuod Siaya. Keep the good work up.

  • @johnkahaguri277
    @johnkahaguri277 2 года назад +4

    I mean fantastic

  • @patriiotmkenya2919
    @patriiotmkenya2919 2 года назад +2

    Kudos Mr president Uhuru

  • @mwash2g
    @mwash2g 2 года назад +1

    We need some recent updates on this project... I have been refreshing you page to see if you have an update on eastern bypass... Please give us an updated drone footage..

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад +2

      Thanks for this,,,my drone crashed, am yet to repair it,,it's costly enough to delay everything,,,Thanks once more.

    • @mwash2g
      @mwash2g 2 года назад

      @@wuodsiaya6610 Ooh no... Sad to hear that.. All shall be well and hoping to see you back soon... You do a great job.

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад

      @@mwash2g Thanks soo much for your continued support..I hope things will be well soon.

  • @saimzmuiruri
    @saimzmuiruri 2 года назад +2

    Great aerial shots and ground progress.

  • @patriiotmkenya2919
    @patriiotmkenya2919 2 года назад +1

    great video

  • @kuronoi1ole.628
    @kuronoi1ole.628 2 года назад +1

    Good work Siaya,keep it up.

  • @sammody.
    @sammody. 2 года назад +2

    This is superb for sure

  • @petermunjogu7056
    @petermunjogu7056 2 года назад +1

    Thanks man for update I can see the road is on high gear at faster rate like expressway next show us on the langata missing link.

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад +1

      THANKS SOO MUCH,,,I WILL BE THERE SOON

  • @kennethkiriinya8005
    @kennethkiriinya8005 2 года назад +1

    Epic

  • @82phalanX
    @82phalanX 2 года назад +1

    The Eastern bypass does not stop at Thika Road, coverage needs to begin from the Ruiru - Kamiti junction @ BTL onwards to the North Airport Road. That will be full coverage 👍

    • @wuodsiaya6610
      @wuodsiaya6610  2 года назад +3

      Noted, thanks.

    • @stevenmutumbu2860
      @stevenmutumbu2860 2 года назад +1

      @@wuodsiaya6610 COMPREHENSIVE VIEW WE LOVE IT +4= LONDON AZIMIO LOCKED

  • @Leonmuigz
    @Leonmuigz 2 года назад +3

    So many properties had been built on road reserves

    • @ichooseviolence2532
      @ichooseviolence2532 2 года назад +2

      Not really coz they know they can be kicked out anytime

  • @petermbatia9384
    @petermbatia9384 2 года назад +2

    Please do a drone video of james gichuru to rironi road.

  • @righttoknowwiththomas9178
    @righttoknowwiththomas9178 2 года назад +2

    kindly put emphasis on millions of people who use footpaths and pedestrian walk .It inever complete dissatisfaction

  • @itskaharadavesnr
    @itskaharadavesnr 2 года назад +1

    I can say its 60% Done. The target was to complete by end of June 2022 but this does not seem feasible. But as much as possible the current administration does not want the project to extend beyond the August 2022 elections. You missed the section between Ruai Bypass and the 75 Battalion roundabout. Most concentration is on this part at the moment. The road expansion has eased the perennial jam between the old Utawala junction and China Road Construction site.

    • @zurucarhire4218
      @zurucarhire4218 2 года назад

      Had no idea there was 75 battalion on this route

    • @itskaharadavesnr
      @itskaharadavesnr 2 года назад

      @@zurucarhire4218 There is also GSU And Administration Police training colleges

  • @gemkachar
    @gemkachar 2 года назад

    Weka captions za location

  • @mkulimamtulivu821
    @mkulimamtulivu821 2 года назад

    Reddamac ile ya viatu bado iko?

  • @danwaweru5732
    @danwaweru5732 2 года назад

    Could just covered the whole stretch to the barracks