HS2 before now and after Banbury areas 2024

Поделиться
HTML-код
  • Опубликовано: 25 дек 2024
  • HS2 has begun assembling a half-kilometre long viaduct at Edgcote. The 515m-long structure will carry the new railway across the floodplain of the River Cherwell, south of Chipping Warden.
    All the major structural elements of the viaduct have been manufactured off-site which HS2 says helps speed up construction, boost efficiency and reduce the number of lorry movements on local roads.
    Edgcote is one of more than 50 major viaducts being built as part of the HS2 project. At between six and eight metres high, the viaduct will be supported by 20 pairs of pre-cast concrete piers. These will be lifted into position with their steel reinforcing rods slotted into pre-prepared sleeves within the pile caps. The gaps are then sealed with grout.
    Two major new wildlife sites will be created where the viaduct crosses the floodplain, with new and enhanced fen, marshland and meadow alongside new woodland planting.
    The viaduct passes close to the site of the medieval Battle of Edgcote, fought on July 26, 1469, during the Wars of the Roses.
    As work on the viaduct continues the government has announced measures to bring the cost and delivery of HS2 back under control.
    Over the years, the cost of Phase One has soared, with poor project management, inflation and poor performance from the supply chain blamed.
    The Transport Secretary, Louise Haigh, has launched an independent review to ensure lessons are learned. The Government is also reinstating ministerial oversight of the project to ensure greater accountability.
    Louise Haigh said: “It has long been clear that the costs of HS2 have been allowed to spiral out of control, but since becoming Transport Secretary I have seen up close the scale of failure in project delivery - and it’s dire.
    “Taxpayers have a right to expect HS2 is delivered efficiently and I won’t stand for anything less.  
    “I have promised to work fast and fix things and that’s exactly why I have announced urgent measures to get a grip on HS2’s costs and ensure taxpayers’ money is put to good use.  It’s high time we make sure lessons are learnt and the mistakes of HS2 are never repeated again.”
    Music: www.bensound.c...
    License code: 1TGZT9MSTPWHDFUF
    A content creater using you tube

Комментарии • 3

  • @Polarbear1-b6j
    @Polarbear1-b6j Месяц назад +5

    The trace looking everywhere more defined, and some nice greening up going on.

  • @willhemmings
    @willhemmings Месяц назад +1

    No amount of tree planting is going to disguise the scar through Cubbington Wood and the position of the pear tree in that old hedgerow cutting diagonally through the view at 5.00. Not for anyone standing on the overbridges at Offchurch and Rugby Road; and I don't need the sombre music to remind me that the losses to this landscape are permanent and irreplaceable

    • @JohnHoward-wc9kk
      @JohnHoward-wc9kk Месяц назад +6

      Trees can be planted and will grow, just like the woods that stand there now; all planted by someone once upon a time. New hedgerows can be set and planted, as those that are their now. Almost every acre of this country has been 'engineered' by farmers, landowners & sheep/cattle for centuries.