Kaiser Permanente Demolition (Part 8), Washington

Поделиться
HTML-код
  • Опубликовано: 28 дек 2024

Комментарии •

  • @tonischuster2751
    @tonischuster2751 11 месяцев назад +2

    Manchmal frage ich mich ob er nicht weis was als nächstes getan werden muss

    • @ernstst.7671
      @ernstst.7671 5 месяцев назад

      Er weiß es wirklich nicht. Amerikanische Fachkraft.

  • @pavelvilsov2437
    @pavelvilsov2437 Год назад +1

    I like to watch, it probably looks strange. But this car is with the most powerful hydraulics, thanks for the video)))

  • @RobertLake-mf2qt
    @RobertLake-mf2qt 9 месяцев назад

    I think the attachment on the excavator should be better as a cutter than for ripping apart. With so much rebar, a cutter would take better care of the project.

    • @AlexLindley-u5f
      @AlexLindley-u5f 2 месяца назад

      How are they going to get to the Rebar without Munching the Concrete first ?- The Muncher is the Primary Tool to get the building down where the materials can be sorted and secondary pulverised and segregated for Scrap and waste on the ground where it is more accessible.
      The Big Machine just Tracking around/Working on top will break it up a lot also.
      There are better Munchers tbh and the operator wastes loads o time tbh

  • @inescividanes2403
    @inescividanes2403 Год назад +3

    Operador muito fraco. Não tem meta , quebra aqui depois quebra llá , não tem meta. tem que fazer uma reciclagem

  • @customadeig503
    @customadeig503 Год назад +3

    Like watching paint dry, either this is a normal pace or a terrible operator, not actually sure but it doesn’t look very productive at this pace but what do I know 🤷🏻‍♂️