Full Gut Rehab Project || Episode 5: Revenge of the Builder
HTML-код
- Опубликовано: 7 июл 2024
- Matthew finally finishes the demo part of this project by removing the chimney and cleaning up the rest of the lath and plaster in the house. He also begins the first step in rebuilding the addition - the floors.
Subscribe for more adventures: / @schaeferfamilyadventure Хобби
You are a ROCK STAR for doing all this on your own! Good thing that chimney demo was easy... it was totally disintegrating!! I’m glad you removed it before it fell apart and endangered someone below 😉
Doing a great job matt
Fair play to you 👍👍
Cheers!
Hi Mathew, I'm so pleased to see you survived the demolition ,take care.
Thanks! I'm glad to have finally gotten past it!
Indeed! I was worried about you after last week’s near death experience! 😳😕
Hi Matthew.
Nice to see you properly smile after so much stress.
Ray.
It does feel so good to be past the worst of it (heres to hoping anyway!). Thanks Ray!
Wow you are in the roof!
Doing my house up 17C farm house needed to do work on the chimney on the left side of the house removed one brick and centuries of heat had turned the motar to dust and the entire chimney was in my living room. Cost quadrupled but did discover the original stone fire surround which was 6 ft high by 6 ft wide on looks gorgeous. Funny how great things can come out of bad situations.
Wow! That's an incredible story, and it really is cool how the best things come from the worst situations/experiences.
Yes, as long as nobody gets crushed under a ton of bricks! Glad you found the cool old fireplace buried beneath! And survived 😉
You did better than people I heard of who were renovating a cottage in Wales.
They pulled out the nasty Edwardian fireplace just to find an equally nasty Victorian one behind it.
A Cherry Picker is great if one has the space and access for one, if not a Scaffold is the only safe option, just ensure the erectors don't damage ones roof tiles as won't be discovered until the next storm and one discovers a leak from cracked tiles.
V good advice. This cherry picker was certainly quite handy for this job - it would have been much scarier/taken much longer without it, for sure.
Really enjoying the series Matthew ... also I love the phrase "full brick condition" ... hoping it becomes part of humanities everyday language (somehow?!?!)
Full brick condition (fbc for short) will be the new "bees knees.". Just someone or something that is awesome.
I'm glad you are enjoying the series and still watching! Thanks for the comment.
Arnold Schwarzenegger was in full brick condition back in the 90s ...
How long did it take to get used to the stilts?
I've used them before actually, but they are pretty stable and have springs do they operate (kind of) like normal legs. It took me a couple of minutes to get used to them again
@@SchaeferFamilyAdventure .
Have you got a pair of very long trousers to wear at carnivals?
Wow...is there anyone helping you?
Some emotional help - but not much in the way of actual man-power! Mostly just me!
@@SchaeferFamilyAdventure wow, I think I'd of lost a few body parts by now , looking forward to you building it up again though 👍👍👍