2 pumps, 500 cubic meters, LETS GO!!!

Поделиться
HTML-код
  • Опубликовано: 14 дек 2024
  • Pouring a 500 cubic meters suspended concrete slab with two PUTZMEISTER concrete pumps.

Комментарии • 40

  • @jamessomero3617
    @jamessomero3617 6 месяцев назад +5

    Love the slapping of the pipes and the Kriss cross boom good job as always ❤❤❤❤

  • @markrobinson6883
    @markrobinson6883 6 месяцев назад +4

    Good times 🎉 Boom pumping 💪, nose to nose 39 meter putzmeister action
    Love the sound of boom pipe slapping 👌
    Thanks for the technical knowledge knowhow ❤
    Gotta love a pump nerd 😂

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +2

      “Pump-nerd” ???? How dare you Mark!!!
      lol!!! I will gladly own the title of “Ginormous Pump-Nerd” 😁😁😁

    • @markrobinson6883
      @markrobinson6883 6 месяцев назад +2

      @@canadianconcretepumper1979 Quite possibly the most interesting "ginormous pump 🤓 nerd" on RUclips 😀🤓🤙🏻

  • @MAGLtd-hh3ct
    @MAGLtd-hh3ct 6 месяцев назад +5

    That sound! It’s the sound of money! Cha-Ching !👍🇨🇦

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +1

      With the price of pipe/elbows/hoses these day, it’s definitely cha-ching…. just perhaps not necessarily in a direction which favours our bottom line 😂😂😂

  • @adambowers3438
    @adambowers3438 6 месяцев назад +6

    Music to my ears!

  • @workinghardusa
    @workinghardusa 6 месяцев назад +2

    Excellent, well done!

  • @sirmister4411
    @sirmister4411 6 месяцев назад +5

    When the concrete here and it’s gotta be pumped Who ya gonna call. A Js pumping.

  • @HighTQCummins
    @HighTQCummins 6 месяцев назад +2

    ive noticed, both your 39 and 56 have double oil coolers. is that something putz does factory for the 13 and 18 cell kits? none of the 16 cell pumps the company I work for run have double coolers.

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +1

      That’s a really good question. I always just assumed it was due to the larger hydraulic pumps and increased flow of the 13HPD and 18HLS kits. I’m going to see if I can’t get a more definite answer on this one.

  • @ShuwebMohamed-sv6or
    @ShuwebMohamed-sv6or 6 месяцев назад +3

    Big video building Machines Loading

  • @BenBNC
    @BenBNC 6 месяцев назад +2

    Damn the water pipe over the water box is pretty awesome

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +2

      If you want to see a kick-ass water-box full setup, checkout our Liebherr vids we shot a few weeks ago.

  • @TheConcreteman006
    @TheConcreteman006 6 месяцев назад

    I use a 4-3.5 reducer too...

  • @robertaustin-y7j
    @robertaustin-y7j 6 месяцев назад +2

    Hey Scott what's up man I hope everything's going well up there for everybody yeah on your you ask the question about those hose clamps the pan and the other one for that you have their I think the pan depending on what you're doing is easy easier you know but because it has a hooks the handles on it the other one that you have their from the the company those are good because they don't look like they don't look on anything you can drag them anywhere so it depends on what your situation is

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +1

      Hey buddy! I’ve found it really depends on the size and spacing of the rebar which we are pulling the hose over top of. For the majority of situations, the concrete placers seem to prefer the hose-eggs, but there definitely are some instances where the hose-pans work a little better.

  • @kencleopas4392
    @kencleopas4392 6 месяцев назад

    Pumping all the way also from 🇵🇭 Mack's a good pump truck, but it has mobility issues, it cannot go on tight corners

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад

      Our bigger Mack trucks with the steerable rear axles do pretty well, but are quite cumbersome I believe to many of the available options overseas.

  • @keyonwilliams1633
    @keyonwilliams1633 6 месяцев назад +1

    that's the sound I love to her in the morning when ther is no concrete to pump work is not fun

  • @MaxCrete
    @MaxCrete 6 месяцев назад +2

    pans ovet eggs every day except when line dragons are in play....
    43sx is a place anywhere pump, my opinion

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +1

      I’ve heard nothing but great things about those 43SX Schwing from guys who’ve run them.

    • @MaxCrete
      @MaxCrete 6 месяцев назад

      @@canadianconcretepumper1979
      Side note.. 42m Liebhrer does have a smaller footprint..... and you can do funkier setups with their outrigger capabilities....
      43sx with whatever punp kit is a volume production machine and some how has low ceiling height .....i dont sell them and dont makd a dollar but its a great machine...
      rear telescoping outriggers would always a preferred choice

  • @greghughey9738
    @greghughey9738 19 дней назад

    36m off-set SMOKES 38-5 in almost every way. Still a slewmotor, TINY foot print, and LIGHTNING fast resets..all while getting 2 1/4-2 1/2 sections in the building. 38m is a bastard footprint, and a bastard truck size.

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  19 дней назад

      @@greghughey9738 I love our first gen 38-5. I’m not a fan our 39Z however (which shares its footprint with the 2nd Gen 38-5). The 25’ wide spread in the rear is what really gets my goat about it.
      I can’t speak to the 2014+ 36Z as I’ve never run one, but I do LOVE the 5 section RZ-boom in comparison to the 4 section Z of our current 39Z and/or previous 40Z.
      You definitely got me thinking about that 36Z though. If a could clean, one ever came up in the used market 🤔🤔🤔

  • @nilst1003
    @nilst1003 2 месяца назад

    500 meter mit 2 Pumpen?

  • @mikeeemike988
    @mikeeemike988 6 месяцев назад +2

    Pipe slap = $$$

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад +1

      In just the past few weeks we’ve had to re-pipe 3 full boom kits. It’s definitely the sound of $$$. The question becomes, in which direction exactly is the $$$ flowing??? 😂😂😂

  • @uncivilengineer
    @uncivilengineer 6 месяцев назад +2

    Lotsa bar doing lotsa nothing @5:10.....

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад

      It would be well above my concrete pump operator pay grade to speculate how much bar is/is not sufficient. I just do my best to make the concrete go into one end of the pump, and reappear out the other. 😁😁😁

    • @uncivilengineer
      @uncivilengineer 6 месяцев назад +1

      @@canadianconcretepumper1979 Fair enough 😂

  • @fredyounger5850
    @fredyounger5850 6 месяцев назад +2

    YOU GOT A COUPLE OF THE BIG BOYS OUT THERE TODAY, GOD I MISS POURING MUD AND FORMING IT UP , I DON'T MISS STRIPPING FORMS THOUGH, THAT WAS NOT THE BEST THING I EVER DID

    • @canadianconcretepumper1979
      @canadianconcretepumper1979  6 месяцев назад

      It’s pretty common in our market for the forming contractors just to sub-contract out the stripping of forms to a crew which specializes in doing so. Stripping forms all day, every single day… what a gig!!!

  • @USMANMUGHAL11503
    @USMANMUGHAL11503 4 месяца назад

    I am pump oprator putzmeister i want work permit canada plz give me your contact number i am Pakistani i work saudia Arabi 10 year experience 😮😊