We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
Sir mujhe intna batao ki solar structure hot dip galvanized C channel nut bolt best hai ya Apollo gt welding kartey hai wo achha hai plz apki ray jaruri hai....
मुझको सब्सीडी योजना के अंतर्गत अपने घर पर 4kw का ऑन ग्रिड + net metering लगवाना है। आज की डेट में 4kw के लिए बेस्ट इन्वर्टर बताइए प्लीज और अधिक पावर जेनरेशन के लिए पैनल किस टेक्नोलॉजी के लगवाए जाएं? कृप्या उत्तर अवश्य दें
@Solarismypassion 5 KW Three Phase connection k liye 5 KW On Grid system me Solar Inverter konsa lagwana chahiye - 5 KW Single Phase ya 5 KW Three Phase?? Please help.. Thank you..
Sir plz aap mujhe ye btaye... Jaise hamare yaha 3 kw ka ongrid solar system lagwaya h.. Hamari input unit 50 hoti and export unit 300 hoti h jisme - 250 unit humne grid ko transfer kr di... Ab wo 250 unit ka payment hydill wale customer ko dete h ya nhi... Kyuki hamri 1 year ki complete grid ko di gyi average unit 3000 unit hogi... Agar costomer ko payment nhi mila to 3000 unit ka hydil department ko fyada hoga..(approx 3000*4rs per unit=12000rs) And costomer ko loss... Ab aap btaye ki hume payment recieve hoga ya nhi.... Agar koi purana bill ho to aap us bill k dwara detail se bta dijiye...
Sir agar meter postpaid ki jaga prepaid ho, tab on grid system kese kaam kar sakta hain, as humne plan kiya hi hain solar lagwane ka but recently hume jankari mili ki humare meter prepaid meter hone wali hain.. please make a dedicated video for this.
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
5 KW Three Phase connection k liye 5 KW On Grid system me Solar Inverter konsa lagwana chahiye - 5 KW Single Phase ya 5 KW Three Phase?? Please help.. Thank you..
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
Sir mera agriculture 3 phase ka 15kv ka connection hai . Maine usi k No ke behalf se 3 kw solar connection apply kiya hai. Mera application successful submit ho gaya. Ab kya mera agriculture connection close ho jayega ya wo bhi continue rahega
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
मानलो मेने 3kw का सिस्टम लगाया dcr के साथमे और 78000 का बेनिफिट भी ले लिया फिर 1 साल बाद मेने हाइब्रिड इन्वर्टर लगवा कर घर में बिजली यूज किया तो क्या होगा में चला शकता हू?
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
छत्तीसगढ़ में किसान अपने खेत पर 1 मेगावाट का सोलर पॉवर प्लांट कैसे लगवा सकता है प्लीज् सर इस पर एक विडियो बना दीजिये कहि पर से जानकारी नहीं मिल रहा है प्लीज् सर हेल्प कर दीजिये
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
1. Digital meter ke Rs kon dega ye kon btaeega. 2. Solor ki sbhi unit free milegi ya only 300 unit hi milegi bs solor or gird ki milake ..? 3. 100000 m to bina subsidy hi lg rha h 3kw ka to isme esa kya h ..... Totaly govt apna benefits dekh rhi h lgwane wale ko koi benifits nhi h..... Ye dhyan rhe solor ka connection apke ghr se nhi hoke gird se hoga
Subsidy company ko fayda pohchane ke liye hai. Dcr panel ka daam pata kar lo kitna mehnga hai. 😅 .. Aur ye subsidy ka Paisa kaha se aya? Public ka Paisa hai, taxpayer ka.
Answer: Sara Paisa tum he doge. Subsidy ac me ayega Kai months baad. Ye subsidy on grid connection hai sirf. Sara generated unit free hoga ( free sirf bola ja raha hai). Koi free nahi hai, Paisa kon diya installation ka? Subsidy se aam admi ko sirf 15-20k ka fayda hoga, may be 20%. 80% panel company ko jayega.
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
20% gov. Subsidy de rahi hai gov. Pahelesehi Solar panel inverter net meter sab material pe 12% gst vasul kar rahi hai to total subsidy 8% hi rahe jati hai usme bhi vender apni manmani cost charges laga rahe hai... to grahak ko kuch nahi milta sivay pachtanese....
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
yes We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
Ek no ki bakwas yojna hai...ise aise samjhe 1.the person who need 1 kw roof top......means they are consuming 4-5 unit a day.......n jo 4-5 unit consume he kar raha hoga uski economic condition hogi kya .....think about it....kya wo 30-35K bhi one time me sirf bijlee bachane ke liye de payega😊😊😊😊😊 2.same as 7-8 unit per day consumption 3.iske place par single battery off Grid system supply karke un ghro ke light fan led tv ka load hi alag kar solar par chalne do....waha 30k denge subsidy to customer sirf 10K ki cost par saal bhar ye load free me use karega
Off grid system se govt. ka koi benefit nahi hai... that's why uspe koi subsidy nahi hai. And off grid systems are good for areas with frequent power cuts. If electricity supply is more than 20 hrs then it on grid makes sense.
@@vishy787 I know sir....m only saying that yadi hum Ghar light fan led tv type ke chote equipments yadi off Grid par hi daal de to volume me kitni unit save hogi ...except 30-40 days jo heavy rain side honge waha system grid se le lega
@@moneymantra6626 kaunsi battery jiski life sirf 5 saal hi hoti hai....proper charging discharge ka khayal rakhe ,maintain kare.....achhi chalegi...bar bar cut off ke niche na jane se.... N ab to lithium ke bhandar bhi mil gaye modani ji ko.....us par bhi to Kam chalu hai
We will take your question in Sunday LIVE session You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share Thanks for sharing your doubt / question
View Solar Subsidy: solarismypassion.com/solar-subsidy/solar-rooftop-system-subsidy-in-india/
🙏Thank you sir for this wonderful information 🙏
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Very well explained Ajit ji
Thanks for liking
Sir mujhe intna batao ki solar structure hot dip galvanized C channel nut bolt best hai ya Apollo gt welding kartey hai wo achha hai plz apki ray jaruri hai....
Ss304 nut bolt
Sir shall we install solar panels ground mounted for PM SURYA GHAR Scheme, because we don't have space on roof but free space on ground
Insure that it's within same premises
Sir Ground mount solar plant ki capacity ko kaise find karenge jab hamare paas area given hai total area 20000 sqmt. h?
First fix your objective of installing the system
Hello sir kya subsidy sabko milegegi ya jin logo ki income kam hoti he unhi ko milegi pls bataye
Subko milegi
Ongrid system
Solar structure C channel type pe lagaye ya hollow pipe..Thank you..
C
मुझको सब्सीडी योजना के अंतर्गत अपने घर पर 4kw का ऑन ग्रिड + net metering लगवाना है। आज की डेट में 4kw के लिए बेस्ट इन्वर्टर बताइए प्लीज
और अधिक पावर जेनरेशन के लिए पैनल किस टेक्नोलॉजी के लगवाए जाएं? कृप्या उत्तर अवश्य दें
Mono perc,540 wp or TOPCon
@Solarismypassion
5 KW Three Phase connection k liye 5 KW On Grid system me Solar Inverter konsa lagwana chahiye - 5 KW Single Phase ya 5 KW Three Phase?? Please help.. Thank you..
Single phase sasta hai
Thank you sir.
Most welcome
Sir plz aap mujhe ye btaye... Jaise hamare yaha 3 kw ka ongrid solar system lagwaya h.. Hamari input unit 50 hoti and export unit 300 hoti h jisme - 250 unit humne grid ko transfer kr di... Ab wo 250 unit ka payment hydill wale customer ko dete h ya nhi... Kyuki hamri 1 year ki complete grid ko di gyi average unit 3000 unit hogi... Agar costomer ko payment nhi mila to 3000 unit ka hydil department ko fyada hoga..(approx 3000*4rs per unit=12000rs) And costomer ko loss... Ab aap btaye ki hume payment recieve hoga ya nhi.... Agar koi purana bill ho to aap us bill k dwara detail se bta dijiye...
Metering pe video jald dalunga
I am from Maharashtra, How much time does it take to obtain feasibility approval? I applied a month ago, but there has been no progress yet
Feasibility report generally comes in a week after application...I got it in 2 days of application here in UP.
Within 1 week
@@yuvrajjadhav9681 @@yuvrajjadhav9681
@@yuvrajjadhav9681 I applied on pmsuryaghar.gov.in. Do I need to do anything extra to obtain feasibility approval? Please guide.
@@yuvrajjadhav9681 I applied on pmsuryaghar.gov.in. Do I need to do anything extra to obtain feasibility approval? Please guide
Sir agar meter postpaid ki jaga prepaid ho, tab on grid system kese kaam kar sakta hain, as humne plan kiya hi hain solar lagwane ka but recently hume jankari mili ki humare meter prepaid meter hone wali hain.. please make a dedicated video for this.
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
5 KW Three Phase connection k liye 5 KW On Grid system me Solar Inverter konsa lagwana chahiye - 5 KW Single Phase ya 5 KW Three Phase?? Please help.. Thank you..
Single phase is cheaper
@@Solarismypassion Thank you for helping..But technically konsa use kare..single phase invrtr use krne me koi issue toh nahi rahega??
Hello sir up ki solar subsidy abhi mil rhi or mil rhi he to state sbsidy lene ki full prosses bata dijiye..
Coordinate with local vendors
Upneda ki site par new application band ho gyi he to kya subsidy nhi milegi
Application National Portal Suryaghar main Karo subsidy milegi.
Will open soon
Whether (discom)WBSEDCL is allowing for subsidy in west bengal ?
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Sir mera agriculture 3 phase ka 15kv ka connection hai . Maine usi k No ke behalf se 3 kw solar connection apply kiya hai. Mera application successful submit ho gaya. Ab kya mera agriculture connection close ho jayega ya wo bhi continue rahega
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Ye price kis type ke panel ke liye h
All
Dcr only. Dcr panel pe he subsidy milega. Dusre panels pe nahi milega.
Aur rate me difference hai dcr aur dusre panels me.
Poly, mono, topcon?
मानलो मेने 3kw का सिस्टम लगाया dcr के साथमे और 78000 का बेनिफिट भी ले लिया फिर 1 साल बाद मेने हाइब्रिड इन्वर्टर लगवा कर घर में बिजली यूज किया तो क्या होगा में चला शकता हू?
Try karo
मैं epc प्लेयर हूँ मेरे कस्टमर की सबसिडी क्लेम २५/०२/२०२४ को किथी अभीतक मिली नहीं है | तो आप बताये कि कितने दिन में आये गी ?प्लेस रिप्लाय करना ।
All work has shifted from seci to rec
Time lagega, don't panic
Modi ji ne kha liya
Epc player kya hota hai brother
Sir...3kw sanction hai...Panel 2700watt (540x5)lge hai to subsidy kitni milegi
60000
3kw che panel pahije
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Sir Rajasthan gov ki taraf sai bhi koi subsidy milti hai kay up ki tarah
Nahi...abhi tak toh nahi milti...aage jaa kar mile toh government notice issue kar degi 😊
No
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Ek ghar me 2 meter ho to us condition me 2 solar yojna le sakte hai kya ?
Yes sir.
Yes
Namaskar sir a Yojana commercial Liye hai kya sar our schoolon hai kya sar 🙏🙏
Ye yojana sirf Individual consumer & Housing society ke liye hai. Baki log bitha sakte hai magar subsidy nahi milegi.
R u from UP
@@Solarismypassion no sir Pune Maharashtra.
Uttarakhand me State subsidy kitna hai pls clear
No idea
1 kw pe 17 Hazar 2kw pe 34 hazar and 3 kw pe 51 hazar uske upar 51 hazar hazar fix hai
2.16=60000
3.24=90000
Gujrat me avreg price chal rahi he
Waree mono bificial panal.structur.2950miter charg ke sath
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Registered vendor are safer than non registered can we trust impaled vendor if they are not giving agreement which is provided on pmsuryaghar website
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Billing hai dadaji ke naam pe aur expired kar chuke hai... subsidy kaise milega ?
Change connection to your name and then apply
छत्तीसगढ़ में किसान अपने खेत पर 1 मेगावाट का सोलर पॉवर प्लांट कैसे लगवा सकता है प्लीज् सर इस पर एक विडियो बना दीजिये कहि पर से जानकारी नहीं मिल रहा है प्लीज् सर हेल्प कर दीजिये
Watch kusum video
Everything explained
Sir local Vander se kase contact kare me up ke Mughalsarai ka hu
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Loan services koibhi bank nahi de rahi hai... Help pls
Ask the empanelled vendors....they have contacts for loan.
Check official website, everyone is giving
1. Digital meter ke Rs kon dega ye kon btaeega. 2. Solor ki sbhi unit free milegi ya only 300 unit hi milegi bs solor or gird ki milake ..? 3. 100000 m to bina subsidy hi lg rha h 3kw ka to isme esa kya h ..... Totaly govt apna benefits dekh rhi h lgwane wale ko koi benifits nhi h..... Ye dhyan rhe solor ka connection apke ghr se nhi hoke gird se hoga
Subsidy company ko fayda pohchane ke liye hai. Dcr panel ka daam pata kar lo kitna mehnga hai. 😅
.. Aur ye subsidy ka Paisa kaha se aya? Public ka Paisa hai, taxpayer ka.
Company kon sa hai sab se bada dcr panel ka? Pata kar lo to answer mil jayega. 😅😂
Answer: Sara Paisa tum he doge. Subsidy ac me ayega Kai months baad.
Ye subsidy on grid connection hai sirf.
Sara generated unit free hoga ( free sirf bola ja raha hai). Koi free nahi hai, Paisa kon diya installation ka?
Subsidy se aam admi ko sirf 15-20k ka fayda hoga, may be 20%. 80% panel company ko jayega.
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
❤
Enjoy
Mere Ghar par 1kw and 2kw ka alag alag solar system laga h
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
1 kw का installation price 1lakh
2 kw 1.3lakh
3 kw 1.78 lakh
Parbhani Maharashtra
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
5 kw ka total 265000 ka karcha ayaa
Yes
20% gov. Subsidy de rahi hai gov. Pahelesehi Solar panel inverter net meter sab material pe 12% gst vasul kar rahi hai to total subsidy 8% hi rahe jati hai usme bhi vender apni manmani cost charges laga rahe hai... to grahak ko kuch nahi milta sivay pachtanese....
Pehle subsidy Kum kar diya hai 😅😂 aur GST ke sath hum ko pagal bana rahe hai.
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
दाम ज्यादा बता रहे हैं आप असलमे कम है
Kya jyada h bhai
क्या Price है 1 2 3 KW की असलं मार्केट मे ?
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
5 kw 280000 varanasi me
Ye sab pagal bana rahe hai subsidy, dcr ke naam pe. 80% company ko fayda milega.
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Vendor 1kw ka solar system lagane ko taiyar nahi aur yadi koi vendor taiyar bhi to woh 1 lakh rupees bata rahe hai
yes
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
2 kw 1.20lakh
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Visit ke liye 2000 rupay mang yah kya barabar
लोड बढाने के लिए पैसा मांग रहे 3000 रुपये
@@balasodafale7395 इतना तो लगभग आता है per KW 2 सें 2.5 हजार
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Subsidy kum karne ka bhi jashn mana rahe hai, acha bata rahe hai youtubers 😂😅 middle class ko middle finger dikha rahe hai. kalyug he hai 😂
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Cost jada hai
It is more if you are looking for subsidy. Else you can get it done from non empanelled vendors for less.
@@vishy787 उसमे कितना खर्चा आयेगा Without Subsidy अगर जाये Non empaneled से लगवाये aur Non DCR पॅनल लगाये ongrid system.
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
It is not useful for 1 kw
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question
Loot lo ham sab ko
Nothing is free
@@Solarismypassion 60000
@@Solarismypassion tumhra video dekh kar sabhi vendor price badha de ham log barbaad ho jaayenge
Ek no ki bakwas yojna hai...ise aise samjhe
1.the person who need 1 kw roof top......means they are consuming 4-5 unit a day.......n jo 4-5 unit consume he kar raha hoga uski economic condition hogi kya .....think about it....kya wo 30-35K bhi one time me sirf bijlee bachane ke liye de payega😊😊😊😊😊
2.same as 7-8 unit per day consumption
3.iske place par single battery off Grid system supply karke un ghro ke light fan led tv ka load hi alag kar solar par chalne do....waha 30k denge subsidy to customer sirf 10K ki cost par saal bhar ye load free me use karega
Off grid system se govt. ka koi benefit nahi hai... that's why uspe koi subsidy nahi hai. And off grid systems are good for areas with frequent power cuts. If electricity supply is more than 20 hrs then it on grid makes sense.
@@vishy787 I know sir....m only saying that yadi hum Ghar light fan led tv type ke chote equipments yadi off Grid par hi daal de to volume me kitni unit save hogi ...except 30-40 days jo heavy rain side honge waha system grid se le lega
Aur 5 saal baad battery change krne ke liye jo charges lagege vo bhi add krna pdega....jitna bachaya utna dena pdega
@@moneymantra6626 kaunsi battery jiski life sirf 5 saal hi hoti hai....proper charging discharge ka khayal rakhe ,maintain kare.....achhi chalegi...bar bar cut off ke niche na jane se.... N ab to lithium ke bhandar bhi mil gaye modani ji ko.....us par bhi to Kam chalu hai
We will take your question in Sunday LIVE session
You can set reminder : ruclips.net/user/liveXwZ5Peo4Q2U?feature=share
Thanks for sharing your doubt / question