Electric Truck Battery Upgrade Prep

Поделиться
HTML-код
  • Опубликовано: 27 ноя 2024

Комментарии • 14

  • @Evbmw
    @Evbmw 13 дней назад +3

    Greg!, You're doing it.........right......

  • @Ghia66
    @Ghia66 13 дней назад +2

    Love your methodical, lazer focus!

  • @LatutaEV
    @LatutaEV 13 дней назад +2

    Man that truck looks awesome

    • @Good-Enuff-Garage
      @Good-Enuff-Garage  13 дней назад +1

      thank you Ed, but you're a terrible liar 😉

    • @LatutaEV
      @LatutaEV 12 дней назад +1

      @Good-Enuff-Garage seriously I love it. There is some beauty in this rugged look 😉

  • @lsh3rd
    @lsh3rd 13 дней назад +3

    Negative terminal is always first to disconnect and last to re-connect because the tool can't be used to complete a circuit to ground.

  • @dbc105
    @dbc105 13 дней назад +2

    Disconnect Negative 1st and reconnect Negative Last. Reason being if you get the wrench against something grounded while it is on the battery terminal it will not short.

  • @lsh3rd
    @lsh3rd 13 дней назад +2

    Also, my Foxbody Mustang was a hodgepodge of standard and metric right from the factory! Ford went metric on the whole chassis (dating back to 1977) and I think the transmission is metric as well. However, the engine, being an evolution of a 1962 design is all standard.

  • @TheSilverBuick
    @TheSilverBuick 13 дней назад +2

    I got quagmired in engine maintenance and smogging of an old Buick (that scope creeped into improved aesthetics) and finally back on re-wiring an old with a new engine Firebird... But looking loongly at the 450H sitting on a pallet, and my Zombie and inverters sitting on a shelf.... patiently waiting their turn.

    • @Good-Enuff-Garage
      @Good-Enuff-Garage  13 дней назад +2

      sounds like Standard Operating Procedure to me 🤷🏼‍♂️ soldier on !

  • @dbc105
    @dbc105 13 дней назад +3

    Greg, do you plan another dyno test with both MG1 & MG2 at some later point? Also do you plan to enable the 2 speed trans?