MTA NYC Subway: Tour of ADA Renovation Progress at Westchester Square-East Tremont Avenue Station

Поделиться
HTML-код
  • Опубликовано: 11 сен 2024
  • Tour of ADA accessibility upgrades construction work and renovation progress work at Westchester Square-East Tremont Avenue subway station in the Bronx, New York City, which serves the 6 train along the IRT Pelham Line. As of June 2024, this video showcases the construction progress of elevator installation and the replacement of windscreens and staircases, along with some Bombardier R62A 6 train action.

Комментарии • 8

  • @mood4eva98
    @mood4eva98 Месяц назад

    OMG THANK YOU SOO MUCH I'VE BEEN WONDERING WHAT'S GOING ON

  • @nyctransitrailfan
    @nyctransitrailfan Месяц назад

    They preserved the stations old fences at each end of the station while they were removed completely on the 7 😔 those new long fences on the 7 sucks

    • @r42productions69
      @r42productions69  Месяц назад

      @@nyctransitrailfan true, they also this to the J when they renovated their stations

  • @aaronainsworth212
    @aaronainsworth212 Месяц назад

    Do you know the exact date of when this station will be finished?

    • @r42productions69
      @r42productions69  Месяц назад +1

      @@aaronainsworth212 Not sure tbh

    • @aaronainsworth212
      @aaronainsworth212 Месяц назад

      @r42productions69 I'm not sure either because it was supposed to be done since may, but I don't know what delayed them.

  • @LuisFCruz-ov5mn
    @LuisFCruz-ov5mn Месяц назад

    I’m guessing the station will be finished by the end of 2024

    • @leecornwell5632
      @leecornwell5632 Месяц назад

      Listen carefully they are definitely gonna start digging under the train tracks to lay down the draining pipes from getting flooded on 52 or 49 tracks. That's what else is going on. Another thing to we might see some R62AS 6 laying on the middle track structures Elevated just like the elevated 1 Broadway line. I'm just letting you know. It's not over yet on the Pelham 6 line.