(Video 6) Hornby Class 43 HST Cross Country running session on the Valebridge Model Railway Layout

Поделиться
HTML-код
  • Опубликовано: 13 янв 2025

Комментарии • 18

  • @mangleytown
    @mangleytown 2 года назад

    Does look great running on your layout, always love an HST 😀

  • @peter7452
    @peter7452 2 года назад

    A great video XC one of my favourite HST’s
    Peter
    Llanwoody Junction

  • @tonyjones1662
    @tonyjones1662 2 года назад

    Hi, just watched all your videos brilliant well done stay safe all the best TONY [ GRIFFIN STATION ].

  • @mikeatpudhamjunction2323
    @mikeatpudhamjunction2323 2 года назад

    Nicely put together. Stay safe

  • @st.davidsgreen2530
    @st.davidsgreen2530 2 года назад

    Very nice layout you have there….would love to see a full layout tour .
    Very impressive 👍
    Eric ( st Davids Green)

    • @theeventhorizon-valebridge9512
      @theeventhorizon-valebridge9512  2 года назад +1

      Thank you Eric, it has a long way to go yet. I'm still wrestling with the upper tracks. I've relaid some areas into the station this week which gives a better flow through, but at the cost of reducing the storage line's lengths. I'm hoping to release another traincam video this weekend which will give you more idea of the layout. I'll save a full tour video for another time when I've got a little more of it completed. Regards Julian

  • @capitallines
    @capitallines 2 года назад

    Another good session!

  • @GoodfordModelRailway
    @GoodfordModelRailway 2 года назад

    Looks good, would be great to see it running in other sections of your layout too 👍

    • @theeventhorizon-valebridge9512
      @theeventhorizon-valebridge9512  2 года назад +1

      Thank you. Yes it would and I will in the future as the other areas get worked on. The layout section shown in this video is the only part of the lower circuit partly completed. (There's still plenty more detailing to do here) It's about a third of the visible lower layer, so about one sixth of the lower circuit as only about half the circuit is visible and half hidden under the top layer. The top layer is only partly finished too, again about a third has some scenery and ballasting. As you can appreciate this is a long haul project! All the trains seen on my videos so far are just testing trains whilst I'm building the layout so a bit of a mish-mash really. 90% of the rollingstock is boxed away, otherwise I'd have no room to work! :) Regards Julian

  • @newdurhamjunctionmodelrail9236
    @newdurhamjunctionmodelrail9236 2 года назад

    Subbed via Jason's stream

  • @lonelysignalbox
    @lonelysignalbox Год назад

    Do you know how many coaches you need for a full rake. I have coaches A-F but I see a 7 coach rake in real life and such. There’s no G coach that I’m aware of. Could u help me out?

    • @theeventhorizon-valebridge9512
      @theeventhorizon-valebridge9512  Год назад

      I'm afraid I have no detailed knowledge of the specifics of real life rakes. I just run the trains for fun and know very little about the facts as to what's prototypical, sorry!
      Regards Julian