Leadwork Tutorial (step flashing porch)

Поделиться
HTML-код
  • Опубликовано: 4 ноя 2021
  • Me wearing the head strap with close up video showing how to mark, cut, fold and install lead step flashing.
    #stepflashing
    #leadwork
    #porchroof

Комментарии • 69

  • @TelstarTAK
    @TelstarTAK 9 месяцев назад +2

    Gave me the confidence to complete my DIY roof project at home, thanks.

  • @PeterLee-zn3jl
    @PeterLee-zn3jl Месяц назад +1

    Nice tutorial...
    Carfy on

  • @TheNorthernmunky
    @TheNorthernmunky 10 месяцев назад +1

    Loads of different skills. Top man!

  • @sabudjed1135
    @sabudjed1135 10 месяцев назад +1

    Very good work. Thanks

  • @markhope4993
    @markhope4993 Год назад

    Awesome work

  • @stevefarable
    @stevefarable Год назад +1

    Thanks 4 video

  • @brianjones2422
    @brianjones2422 11 месяцев назад +2

    Grat lead working, because I didn't know how to do it I used to just cut smaller pieces, I sure you know what I mean.
    And wear cloves.

  • @kevinmoran1216
    @kevinmoran1216 9 месяцев назад

    well done boys

  • @Reddwarf1994
    @Reddwarf1994 Год назад

    Wow

  • @dustyfruitypie1633
    @dustyfruitypie1633 6 месяцев назад

    Should the wall that the roof butts up to have stepped cavity trays in?

  • @brianjones2422
    @brianjones2422 11 месяцев назад +2

    I hadn't watched it till the end before I commented, you should have washed the dust out before you fixed it, mortar doesn't stick to dust for to long, not a dig just advice.
    Your good thought.

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  11 месяцев назад

      Thanks for your comment. We use lead sheet sealant not mortar. It miles better

  • @ollieollie5512
    @ollieollie5512 9 месяцев назад

    Grind before tiling,water line min 2 inches before marking steps ,but not a bad job 8/10

  • @vincentwhelan2484
    @vincentwhelan2484 Год назад

    Is it OK to use soakers under a small single overlap interlocking tile ?

  • @colinevans7134
    @colinevans7134 9 месяцев назад +1

    When you have felt and batten the roof, why didn't you cut the chase then for the leadwork, now you have mess over the plain tiles

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  9 месяцев назад +1

      I dont like grinding to far when i use lead sheet sealant. I find it easier to mark the grind line when you lay the lead up the roof. The lab can cut and bend it while im grinding

  • @gridman3851
    @gridman3851 5 месяцев назад

    I am trying to repair my flat roof. I have applied the adhesive to the roof. When I lay felt onto the adhesive do I have to peel off the thin plastic sheet from the felt first? Absolute beginner here😮😮.

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  5 месяцев назад

      Yes peal back 500mm. Get that stuck, then roll it back over the bit you stuck and remove the film as you roll out.

    • @gridman3851
      @gridman3851 5 месяцев назад +1

      @@pauljamieconstruction1871 Thanks Paul 😊

  • @richardevans3253
    @richardevans3253 Год назад +1

    Has lead flashing got to be stepped.. Can it be a straight piece ,if it's not going into brick work.

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  Год назад +2

      Hi Richard, on render just mark your height top and bottom, ping a line or draw with pencil, we use 2 blades in a 4" grinder

    • @richardevans3253
      @richardevans3253 Год назад

      @@pauljamieconstruction1871 Paul ,Thanks for your reply . I have a water leak along the flashing it's a bit of a nightmare . . Should've tackled it in better weather . I'm going to get a soaker ,as the bottom flash isn't doing it's Job. Hopefully it'll be successful.. I'm not a roofer ,as you've most probably guessed by now .

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  Год назад

      @@richardevans3253 what tiles are they? And is it the same this or running horizontal

    • @richardevans3253
      @richardevans3253 Год назад

      @@pauljamieconstruction1871 yes ,it's the same more or less than the roof you were on .The tiles clay & are 10 1/2 inch x 6 1/2 inch . .I don't know ,if they'll sit on top of a soaker. .

    • @richardevans3253
      @richardevans3253 Год назад

      ...as the roof you were on ,I meant to say

  • @Sitdown570
    @Sitdown570 2 месяца назад +1

    You should only mark lead with lead and it should never be longer than 1.5 metres

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  2 месяца назад +1

      Thanks for your comment. This is 1.5m fyi.

    • @Sitdown570
      @Sitdown570 2 месяца назад +1

      @@pauljamieconstruction1871 sorry it looked longer 👌

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  2 месяца назад

      @@Sitdown570 I bought a 3m roll and cut it in half . 1 on each side. And was still short 🙈

    • @Sitdown570
      @Sitdown570 2 месяца назад +1

      @@pauljamieconstruction1871 did that mean another journey back for more lead 😫😫😫

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  2 месяца назад +1

      @@Sitdown570 absolutely. Had a second visit

  • @barrywood7400
    @barrywood7400 Год назад +2

    “ I know, lets make the job as difficult as possible “ !!!!!! Would you get a bricklayer to lay bricks at that height going up and down a fucking ladder!!! No doubt your gaffer said you don’t need scaffold. Ha !

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  Год назад +4

      What a wonderfull comment thank you. Unfortunately sometimes people dont supply a scaffold, so instead of moaning we just get it done

    • @barrywood7400
      @barrywood7400 Год назад +1

      @@pauljamieconstruction1871 Spot on pal, been there a few times myself and retired now. Got to say though your work is great and nice to see a bit of pride took in the job as well just getting on with it. I bought a small amount of scaffolding and put it up myself just for that situation ! Crack on regardless chaps.

  • @PeakyBlinder
    @PeakyBlinder Месяц назад

    Chase the walls first

  • @user-yf6uq2co4i
    @user-yf6uq2co4i Год назад +1

    Cowboys

    • @Orgakoyd
      @Orgakoyd 10 месяцев назад

      How is this?

  • @richardevans3253
    @richardevans3253 Год назад

    ?

  • @sats7819
    @sats7819 Год назад +1

    Pukka

  • @andrew38741
    @andrew38741 Год назад +5

    Looks a lot longer than meter and half matey lead shouldn’t be over 1.5m

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  Год назад

      Thanks for your comment, i used to be a lead worker when i first started, its defo 1.5 bro 👍🏼

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  9 месяцев назад

      Count the tiles courses . You should no they are 100mm

    • @AK4ourty7even47
      @AK4ourty7even47 9 месяцев назад

      The length of the set square is 300 , it looks fairly close to 5 of those 7:41

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  9 месяцев назад

      @@AK4ourty7even47 what do you mean

    • @AK4ourty7even47
      @AK4ourty7even47 9 месяцев назад +1

      @@pauljamieconstruction1871 i was explaining how you can see its 1.5m by using the set square as a guide when its laid down while you were marking out on the back of your truck

  • @ASQUITHZ9
    @ASQUITHZ9 8 месяцев назад

    I don't think your good enough to give anybody any advice! You always always carry lead up on a board there's plenty of stuff lying around on that scruffy site pf yours . Individual flashings are three times better and we always fixed ours in with a concave form to fill the joont It was for English Heritage though!? 5/ 10 kid

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  8 месяцев назад +1

      What on earth are you talking about. I carried the lead in the air, no one carries it on a board

  • @patrickdaly2121
    @patrickdaly2121 Месяц назад

    Can’t you people make a tutorial with out using filthy language? Seems not.

  • @James1993..
    @James1993.. 9 месяцев назад +2

    When I do my step flashing always have marker pens 2 different cut lines 1 for the cut and 1 for the fold lines I have done it couple times cut on the fold line lol

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  9 месяцев назад

      I used to use a marker pen for lead flat roofs as you can weld it. Can you not see the pen marks on the lead once finished

    • @James1993..
      @James1993.. 9 месяцев назад +1

      @@pauljamieconstruction1871 no I have never cut wrong with the markers before I use to mark it with nail or something and that’s when I have cut on the fold line

    • @pauljamieconstruction1871
      @pauljamieconstruction1871  9 месяцев назад

      @James1993.. once youve done miles of step flashing it becomes second nature

    • @James1993..
      @James1993.. 9 месяцев назад

      @@pauljamieconstruction1871 yeah I don’t have any issues now and definitely not trying to tell you how to do it I’m just saying that’s they way I always do it. I want to do a lead welding course that’s my next goal with leadwork