Timer Relays | TELE Session 2

Поделиться
HTML-код
  • Опубликовано: 20 окт 2024
  • НаукаНаука

Комментарии • 8

  • @billspooks
    @billspooks 3 года назад +1

    At 19:00 starting STEP 3, it would be helpful if the graphic showed the actual dialed number you selected. The bottom should show the pointer at "E" for delay on, the middle should show the pointer at 10H and the top should show the pointer at the 6 for a total delay of 6 hours before the relay activated. This would be helpful for those who are trying to learn about your product.

    • @TELEControlsInc
      @TELEControlsInc  3 года назад +1

      Thanks for leaving a comment, Bill Michael. We appreciate you taking the time to review the content. We will certainly include the setup section in one of our next videos.

  • @rickyr4853
    @rickyr4853 Год назад

    So once power is off/ disrupted, function A will keep the zone valve active for 2 to 3 minutes

  • @rickyr4853
    @rickyr4853 Год назад +1

    V2ZA10 3MIN 24-240V AC/DC
    I just purchase this unit for 24 volte application ( to be install on 24 volt zone valve) The reason is once the power is cut off from the zone valve I need the zone valve to have power for at lease for one minute. ( I assume its theOFF-Delay without auxiliary voltage) Question. what are the wiring connections and the settings for 30 seconds. Is there any drawings showing these connections

    • @TELEControlsInc
      @TELEControlsInc  Год назад

      Hi Ricky,
      Connection diagrams can be found in the datasheets for the product, see: www.tele-online.com/en/produkt/v2za10-3min-24-240v-acdc/
      The true off delay without aux voltage function “A” will hold the integrated relay for the set time “t” active once the power is lost.
      However, the timer relay itself does not provide any voltage on the output since it’s just the switching crelay itself. We would recommend a battery backup or power supply connected to the relay contact to provvide 24V to your valve system.

  • @rickyr4853
    @rickyr4853 Год назад +1

    Re: V2ZA10-3
    This is my understanding of the
    V2ZA10-3
    must have power connected to A1 and A2
    In my case 24 volt that supply power to the V2ZA10-3 unit
    Once the power is disrupted on A1 and A2 then the V2ZA10-3 will supply power to the zone valve for about 0 to 3 minutes only after which it will shut off? Once power is restored to A1 and A2 the process starts all over again.
    This is exactly what I’m looking for
    Which of the functions do I select for this purpose
    A
    E
    nWa
    nWu
    nWuWa
    Please advise
    Thanks
    Ricky

    • @TELEControlsInc
      @TELEControlsInc  Год назад

      Ricky, Our true off delay function “A” will make sure that the output relay on the timer stays active for the set time “t”, allowing your valve to stay active.

  • @linossinkala7840
    @linossinkala7840 3 года назад +1

    Thankyou this is super