How to use multifunction time relay | demonstration of 10 functions

Поделиться
HTML-код
  • Опубликовано: 27 сен 2024
  • In this video, we are going to show you how to use the 10 function modes of GEYA multifunction time relay GRT8-M1.

Комментарии • 22

  • @georgesercau7094
    @georgesercau7094 7 месяцев назад +1

    Except the intermitent switch on and of ,there were two timer relays in my old days, the timing from ON and timing from OFF.This one cover both functions.If you need sone intermitent, just use two OfFF timing relays.Those days an automated machine could contain about 400-500 relays with 3or 4 NC and NO, pressure and current protection switches, and about 200-300 pages with diagrams.Not always you find the machines diagrams but never the less you were compelled to repear it and fast and you could not mistake the electrical fault with a mechanical one

  • @copernicofelinis
    @copernicofelinis Год назад +2

    Bought it today. It's very flexible. The only downside is that the terminal blocks are too small for the wires coming out of my meter and going to my load (6mm^2 and 4 mm^2).

    • @geyaelectric1302
      @geyaelectric1302  Год назад

      Thank you for your feedback.

    • @Pacasmayo2day
      @Pacasmayo2day 11 дней назад

      they are meant for smaller loads. If you need to use for a motor it's best to add a contactor. Remember the relay is electronic and not going to age well if you start big loads with it.

  • @missylorna688
    @missylorna688 Год назад

    Hi I bought this but I don't think it will do what I want. My plan is to switch the relay with 12 volt DC, the relay with switch 240 volt AC. Is this possible? Cheers

  • @fernandobuffoni317
    @fernandobuffoni317 Год назад

    Where did you hooked up b1 to?

  • @uchachidozie5572
    @uchachidozie5572 Год назад

    What if the timer does not show any signal but there is power on the timer

  • @Engineer-Samibress
    @Engineer-Samibress Год назад

    Nice job thanks for your time and keep going my friend

  • @EricHabarugira-ck7yy
    @EricHabarugira-ck7yy 5 месяцев назад

    U should have showed us the wiring process

  • @carlosbarrios6024
    @carlosbarrios6024 Год назад

    I bought 2 and the "E" and "F" modes not work as described, Once power is apply to A1 and A2 the timer started before send signal to "S" terminal, Just apply power to see energizing and it start counting.....

  • @alimohamma1234
    @alimohamma1234 4 месяца назад

    A1 B1 A2
    15 16 18
    Right now can't see ur video in up saide wire connection.

  • @besongbesong6434
    @besongbesong6434 Год назад +1

    Your manual is zero. Improve on that. Even the video doesn't show how to connect this complicated product😢.

    • @Pacasmayo2day
      @Pacasmayo2day 11 дней назад

      How will you like to use, I can help you

  • @georgesercau7094
    @georgesercau7094 7 месяцев назад

    Except the intermitent switch on and of ,there were two timer relays in my old days, the timing from ON and timing from OFF.This one cover both functions.If you need sone intermitent, just use two OfFF timing relays.Those days an automated machine could contain about 400-500 relays with 3or 4 NC and NO, pressure and current protection switches, and about 200-300 pages with diagrams.Not always you find the machines diagrams but never the less you were compelled to repear it and fast and you could not mistake the electrical fault with a mechanical one

  • @telosfd
    @telosfd Год назад

    Is there any GEYA over voltage or low voltage supervisor?

    • @geyaelectric1302
      @geyaelectric1302  Год назад +1

      Hi, thank you for reaching out. Yes, we have voltage mornitoring relays. Please send your information to sale@cngeya.com, we will offer further information to you.

  • @Zindagi-Ka-Safar.
    @Zindagi-Ka-Safar. 10 месяцев назад

    Super man

  • @muhammadnaeem4834
    @muhammadnaeem4834 Год назад

    Nice

  • @benjamincontrerascenepo1507
    @benjamincontrerascenepo1507 2 месяца назад

    Pueden subir este mismo video al español?