Our Work: Level crossing upgrade in Daroobalgie, New South Wales

Поделиться
HTML-код
  • Опубликовано: 1 дек 2024
  • Construction works at Daroobalgie, about 300km west of Sydney, powered ahead during a rail track possession in March 2024.
    The level crossing was upgraded with works including upgrades to existing under track and road drainage, and reconditioning works to support the future installation of new turnouts for the crossing loop.

Комментарии •