Inland Rail
Inland Rail
  • Видео 183
  • Просмотров 318 372
Our Visualisations: Hamilton Street, Broadford, Victoria 3D fly-through 2024
In Broadford, we’re replacing the Hamilton Street bridge and lowering the tracks to allow sufficient clearance for double-stacked freight trains.
Community benefits of the design include:
- Improved connectivity with a shared use path and pedestrian access
- Lowering the track to reduce the height of the new bridge
- Changing road layouts to improve traffic flow and safety
- Landscaping and new seating areas
- Maintaining access throughout construction.
This visualisation is an indicative representation and is for illustration purposes only. It should not be considered the final design, which may be subject to change.
For more information visit inlandrail.com.au
Просмотров: 902

Видео

Our Visualisations: Short Street, Broadford, Victoria, 3D fly-through 2024
Просмотров 570День назад
In Broadford, we’re replacing the Short Street bridge and lowering the tracks to allow sufficient clearance for double-stacked freight trains. Community benefits of the design include: - Improved connectivity with a shared use path and pedestrian access - Lowering the tracks to reduce the height of the new bridge - Changes to road layouts to improve traffic flow and safety - Landscaping and art...
Our Work: Final concrete beams installed on Seymour-Avenel Rd bridge in Seymour, Vic
Просмотров 43314 дней назад
The last of six concrete beams have been lifted into place at Seymour-Avenel Road in Seymour, Victoria to enable remaining critical works on the 35-metre-long bridge to continue. At Seymour-Avenel Road, we're replacing the existing bridge with a higher bridge in the same location to allow sufficient clearance for double-stacked freight trains to pass safely. For more information, visit www.inla...
Our Visualisations: Euroa Station Precinct and Anderson Street 3D fly-through 2024
Просмотров 1,5 тыс.14 дней назад
In Euroa, we’re modifying the station precinct and replacing the Anderson Street bridge with a vehicle underpass to allow sufficient clearance for double-stacked freight trains. Plans include relocating the western rail track, building a new station platform and adding an accessible pedestrian underpass with lifts, ramps and stairs. This visualisation is an indicative representation and is for ...
Our Work: Sustainability in construction, 3D printed nesting boxes
Просмотров 27021 день назад
In an Australian rail-project first, computer-generated three-dimensional printed nesting boxes have been installed near an Inland Rail construction site to shelter and protect local wildlife. Inland Rail and our construction partner McConnell Dowell have joined with University of Melbourne researchers to install eighteen 3D printed nesting boxes on the Seymour-Avenel Road construction site in ...
Our Work: Inland Rail Skills Academy graduates get on the tools
Просмотров 165Месяц назад
Inland Rail Skills Academy is creating a solid pathway into employment for a trio of graduates, who have started work with Inland Rail contractor Martinus Rail, after they completed a five-week course through the Skills Academy. Brett, Lawrence and Hamilton gained work on the Stockinbingal to Parkes (S2P) section of Inland Rail and are now making positive contributions to the project.
Focus On: Crossing loops with engineer Kurt Uebergang
Просмотров 1,2 тыс.Месяц назад
What are crossing loops and turnouts in rail and how do they work? How do trains pass each other? Our Senior Engineering Manager Kurt Uebergang tells us how crossing loops and turnouts are essential for managing the flow of trains on single-track railways like Inland Rail.
Our work: Wyndham Avenue bridge track lower at Forbes, NSW - September 2024
Просмотров 745Месяц назад
Inland Rail construction in Forbes powered ahead during a work blitz from 14 to 18 September 2024. We undertook round-the-clock works at Wyndham Avenue, Forbes, where the existing track under the road bridge was lowered by two metres to create increased vertical clearance for double-stacked freight trains. Using more than 500 sleepers and 1000 tonnes of stone ballast, a length of track 320 metr...
Local businesses attend 'Meet the Contractor' sessions about work on Beveridge to Albury Tranche 2
Просмотров 1412 месяца назад
Prospective suppliers, subcontractors and equipment providers attended Meet the Contractor events in Broadford, Euroa and Benalla to find out about opportunities on the Inland Rail project. In Victoria, Inland Rail is replacing road bridges, lowering rail tracks, and modifying railway stations to enable the safe operation and passage of double-stacked freight trains. Construction partner, John ...
Our work: Green Street bridge lift in Wangaratta, Victoria - September 2024
Просмотров 5452 месяца назад
Inland Rail achieved another milestone in Victoria lifting the Green Street bridge superstructure into place in September 2024. A 650-tonne Superlift crawler crane was used to install the 200-plus tonne steel bridge structure. Green Street bridge is being replaced and the tracks have been lowered to allow double-stacked freight trains to use the line. For more information visit, inlandrail.artc...
Track Talk: Construction surge on Beveridge to Albury section during 60-hour track possession
Просмотров 1 тыс.2 месяца назад
In this Track Talk, our Victorian project manager Russell shares what we achieved on the project during the recent 60-hour possession. This track possession involved a range of work from bridge installations to track repositioning and it’s given us an opportunity to make huge strides towards our goal of delivering the Victorian sections of Inland Rail by 2027. For latest updates on our progress...
Track Talk: Inland Rail completes major works blitz on Stockinbingal to Parkes section
Просмотров 9722 месяца назад
Introducing Track Talk, where we’ll be sharing regular construction updates! The Stockinbingal to Parkes section of Inland Rail will enhance 170 kilometres of existing rail corridor in regional New South Wales. Learn more about the work going on to build Inland Rail at inlandrail.info/3zdSfkU
Our works: Crowds watch Green Street bridge superstructure lift
Просмотров 7742 месяца назад
Inland Rail achieved another milestone in Victoria in September, successfully lifting the Green Street bridge superstructure into place. A crowd of around 150 people turned out to watch the 650-tonne Superlift crawler crane lift the 200-plus tonne steel bridge structure into place. We caught up with a couple of Wangaratta local residents who were excited to see the progress and are looking forw...
Inland Rail update with CEO Nick Miller, September 2024
Просмотров 4,1 тыс.2 месяца назад
Inland Rail CEO Nick Miller shares an update and milestones for Inland Rail from Wangaratta Station in Victoria.
Our Animations: Opening new regional rail freight opportunities - Commodities
Просмотров 1,8 тыс.2 месяца назад
Inland Rail is a fast freight line that will enhance our national freight network and supply chain capabilities, connecting existing freight routes through rail, roads and ports, and supporting Australia’s growth. It will better link businesses, manufacturers and producers to national and global markets and generate opportunities for industries and regions during construction and beyond. As eac...
Our Work: What is a track possession?
Просмотров 3603 месяца назад
Our Work: What is a track possession?
Our Work: Wangaratta Station Precinct takes shape - August 2024
Просмотров 9483 месяца назад
Our Work: Wangaratta Station Precinct takes shape - August 2024
Our Animations: Opening new regional rail freight opportunities
Просмотров 5123 месяца назад
Our Animations: Opening new regional rail freight opportunities
Our Work: Construction in Victoria is powering ahead - Beveridge to Albury progress update July 2024
Просмотров 8794 месяца назад
Our Work: Construction in Victoria is powering ahead - Beveridge to Albury progress update July 2024
Our People: Celebrating our First Nations people this NAIDOC Week
Просмотров 924 месяца назад
Our People: Celebrating our First Nations people this NAIDOC Week
Our Work: Construction contractor announced for Beveridge to Albury Tranche 2 in Victoria
Просмотров 1,1 тыс.5 месяцев назад
Our Work: Construction contractor announced for Beveridge to Albury Tranche 2 in Victoria
Our Work: Level crossing upgrade in Daroobalgie, New South Wales
Просмотров 5505 месяцев назад
Our Work: Level crossing upgrade in Daroobalgie, New South Wales
Our Visualisations: Beaconsfield Parade bridge, Glenrowan, Victoria
Просмотров 8865 месяцев назад
Our Visualisations: Beaconsfield Parade bridge, Glenrowan, Victoria
Our Visualisations: Bridge over Wee Waa Road and Narrabri viaduct 3D fly-through 2024
Просмотров 2,7 тыс.5 месяцев назад
Our Visualisations: Bridge over Wee Waa Road and Narrabri viaduct 3D fly-through 2024
Our Work: Inland Rail Skills Academy helps local workers gain skills for civil construction careers
Просмотров 1805 месяцев назад
Our Work: Inland Rail Skills Academy helps local workers gain skills for civil construction careers
Our Work: First canola in six years delivered to the Port of Newcastle via our upgraded line in NSW
Просмотров 5205 месяцев назад
Our Work: First canola in six years delivered to the Port of Newcastle via our upgraded line in NSW
Our People: Nick Miller, Chief Executive Officer
Просмотров 6076 месяцев назад
Our People: Nick Miller, Chief Executive Officer
Our Work: Construction of the new Beaconsfield Parade bridge, Glenrowan, Victoria
Просмотров 1,6 тыс.6 месяцев назад
Our Work: Construction of the new Beaconsfield Parade bridge, Glenrowan, Victoria
Our Work: Inland Rail is building a better way to move goods
Просмотров 1,5 тыс.6 месяцев назад
Our Work: Inland Rail is building a better way to move goods
Our Communities: Rugby League star helps us announce partnerships for First Nations communities
Просмотров 1687 месяцев назад
Our Communities: Rugby League star helps us announce partnerships for First Nations communities