London Overground serves its 3rd London terminal | Class 378 observations at London Bridge

Поделиться
HTML-код
  • Опубликовано: 6 сен 2024
  • Yesterday, 31/03/24, London Overground served London Bridge for the first time. They did trials at London Bridge a while ago but today they were in service for the public. The publicity at London Bridge was really fantastic.
    The reason for this was engineering works between Canada Water & Highbury & Islington. Originally terminating at New Cross Gate in the past (I believe) today, LO served London Bridge and proved to be really useful as a lot of trains were receiving traffic. I personally think this should be the norm during a core section closure on the London Overground! Enjoy!
    Copyright ©️ Plasma UKTransport 2024

Комментарии • 1