NEW CONSTRUCTION SITE. SETTING OUT, SURVEYING IN CONSTRUCTION. Landscape works, kerbs and paving.

Поделиться
HTML-код
  • Опубликовано: 5 сен 2024

Комментарии • 58

  • @Azadi707
    @Azadi707 3 года назад +1

    Fantastic, as always 👍

    • @SITENG
      @SITENG  3 года назад

      Thank you very much Khalid :)

  • @femidunmoye4637
    @femidunmoye4637 2 года назад +1

    Hi Greg, I watched some of your youtube videos on setting out and they are mind blowing. I doff my hat! Well done.

    • @SITENG
      @SITENG  2 года назад

      Thank you! I am very happy to know there are people who appreciate my work!

    • @femidunmoye4637
      @femidunmoye4637 2 года назад +2

      Hi Greg, Please, is there any update regarding the proposed SITENG training/course?

    • @SITENG
      @SITENG  2 года назад +1

      Hi Femi, in 2 weeks time you'll know everything. Drop me an e-mail on siteng.community@gmail.com and I'll send you the info max in 2 weeks

  • @AndreiMovanu
    @AndreiMovanu 3 года назад +1

    hi! thats another good video! thanks.
    yes. it would be helpful to know more about the paving, curbes, roads..
    drawings and setting out.

    • @SITENG
      @SITENG  3 года назад +1

      Thank you Andrei! I will do some vids about it then :)

  • @ishtiyaqahmad1106
    @ishtiyaqahmad1106 3 года назад +1

    Thanks 👍

    • @SITENG
      @SITENG  3 года назад

      No problem 👍

  • @tedchannel7611
    @tedchannel7611 3 года назад +1

    thanks for the content gregg.

    • @SITENG
      @SITENG  3 года назад

      Thanks for appreciating Ted :)

  • @waseemiftikhar2233
    @waseemiftikhar2233 3 года назад +1

    I am to Land Surveyor for the last 12 years to working in UAE all types of construction works..

  • @abdurrahimmia62933
    @abdurrahimmia62933 3 года назад +2

    I love u boss

    • @SITENG
      @SITENG  3 года назад

      Thank you!!!

  • @huskodgn
    @huskodgn Год назад +1

    👍

  • @tonymaguire9498
    @tonymaguire9498 3 года назад +2

    With all these new communities tfl are going to need another tube line to serve it

    • @SITENG
      @SITENG  3 года назад +1

      I think northern line is being extended, but what do you mean exactly ?

    • @unda25
      @unda25 2 года назад

      @@SITENG he look we are too many people and too many new building

    • @SITENG
      @SITENG  2 года назад

      @@unda25 maybe, looks like the trend is now to limit the population....
      TBH all well developed societies reducing in population so the best solution would be to just help all the world to get to that point and problem solved

  • @mitchmackenzie3293
    @mitchmackenzie3293 8 месяцев назад +1

    So do surveyors in the UK only do cadastral?

    • @SITENG
      @SITENG  8 месяцев назад

      Not only, on bigger projects surveyors work setting out, as builts, setting the control for the job etc etc. Also many surveyors working as a setting out engineers. Setting out engineer is a specific role really as it's a surveyor & engineer 😀

  • @Patrick-zu5eo
    @Patrick-zu5eo 3 года назад +1

    Hello Greg, when marking up column positions and grid lines in RC frame construction, do you use the 360 prism on prism pole? Do you get the required accuracy with this method as the prism is elevated above the point, thus relying on a steady hand and the accuracy of the spirit bubble in the pogo pole? Do you ever use the mini prism to achieve better accuracy? In this video you briefly covered marking the point, do you make an indent in the ground with the tip of prism pole, put the prism pole aside and then use a marker pen to mark an X. If you could demonstrate this process in one of your videos, also covering how you lay out the lines with the spray paint, I have seen it done whereby they use two bricks to tighten up the line on the ground and spray over the top of the line. Thanking You.

    • @SITENG
      @SITENG  3 года назад +1

      Hi Patrick! I was using the small one, or shooting using the laser. I know people are using pole for setting out columns, but I don't like it myself. In this case I used a laser and for as built survey I used a pole+prism. I will show soon the procedure then :) I have a chalk line so I ask someone to help me, or if it's a string line to hold it and I am spraying :)

  • @karolkaliszuk2470
    @karolkaliszuk2470 3 года назад +1

    Hello Greg. Its very intresting video. Thanks for it😃
    Small sugest for you, please chech in google what is 'gst 4 tripod star' its good for slyppery surface too.

    • @ahmadmohamad6384
      @ahmadmohamad6384 3 года назад +2

      Reason why he did not place tripod on the ground was due to the membrane placed on the ground. The tripod feet would pierce it damaging the membrane.

    • @SITENG
      @SITENG  3 года назад +1

      Hi Karol! I will have a look at it :)

    • @karolkaliszuk2470
      @karolkaliszuk2470 3 года назад +1

      Ahmad i know that😃if you use gst 4 tripod star under the tripod, the tripod pierce will not touching the membran. I tested it😃

  • @Yess200
    @Yess200 10 месяцев назад +1

    How do you create a custom line for example you’re one was PLV how can I create HV, or LV, or water ?

    • @Yess200
      @Yess200 10 месяцев назад +1

      (Custom line type)

    • @SITENG
      @SITENG  10 месяцев назад

      @@Yess200 TBH I used original lines from design and played a bit with scale etc. You have to create new layer on CAD and try it there

  • @keerthanashaji3441
    @keerthanashaji3441 3 года назад +1

    ❤️

    • @SITENG
      @SITENG  3 года назад

      Thank you :)

  • @michaeltobi4925
    @michaeltobi4925 2 года назад +1

    Hi I am interested in learning the setting out

    • @SITENG
      @SITENG  2 года назад

      Hi Michael, please watch the setting out series, loads of information there. The course I am preparing getting final shape now and soon you will get more details. If you would like to know more let me know on siteng.course@gmail.com and soon there will be more info about it😁

  • @ahmadmohamad6384
    @ahmadmohamad6384 3 года назад +2

    Is it not easier to use auto linework while surveying so it automatically creates the polyline instead of doing it manually in AutoCAD?

    • @SITENG
      @SITENG  3 года назад

      Not sure, have to check it, but it's not takin me a lot of time to be honest and like to draw what I know it's in :)

    • @petermontgomery8707
      @petermontgomery8707 3 года назад +1

      ruclips.net/video/o-8jyXYEtxE/видео.html
      Definitely look at this and the vid that follows it.

    • @SITENG
      @SITENG  3 года назад

      Will do, thanks!

    • @petermontgomery8707
      @petermontgomery8707 3 года назад +1

      @@SITENG ruclips.net/video/2QyXu_xJ-jw/видео.html,this is where it gets interesting and saves time on site

    • @SITENG
      @SITENG  3 года назад

      Thanks, will have a look definitely :)

  • @sujithpayyanur9624
    @sujithpayyanur9624 2 года назад +1

    Hi, can you upload the pdf drawing of the landscape?

    • @SITENG
      @SITENG  2 года назад +1

      Hi! Unfortunately I can't due to copyright issues.

  • @unknow-tn8fo
    @unknow-tn8fo 3 года назад +1

    How you are doing the setting out if there's no grid lines?

    • @jamesbrookes5893
      @jamesbrookes5893 3 года назад +1

      You don’t need gridlines to set out. He said he’s setting out via national grid so as long as your instrument is set up with national coordinates you’re good to go.

    • @SITENG
      @SITENG  3 года назад

      I have a drawing in the instrument so just taping lines really and using them in reference line.

  • @vctr196
    @vctr196 2 года назад +1

    hi, what is PLV?

    • @SITENG
      @SITENG  2 года назад +1

      Hi Victor! Private low voltage service.

  • @SNDuGamingX
    @SNDuGamingX 2 года назад +1

    Hi everyone. I am very familiar with the setting out procedure on site when I have known control points to set up the station over. However, I have been giving the task of setting out a new extension to an existing building. The CAD drawing has the existing building with the extension present but no proper X,Y,Z co-ordinates on it. There is also no known control point anywhere on this site.
    Can someone please assist me on how I go about setting out this building?? Any help would be great

    • @SITENG
      @SITENG  2 года назад

      Hi! I would shoot the existing building and set a ref line a work with it, as it really will be your 'local system' where you will be using offset as x and length of line as y.
      Let me know if you need more explanation.👍👍👍

    • @SNDuGamingX
      @SNDuGamingX 2 года назад +1

      @@SITENG Set up TS on arbitrary coords like 1000,5000,100 and then shoot the building? I can then transfer over the cad drawing onto my surveyed points and survey a few control points? Would that work

    • @SITENG
      @SITENG  2 года назад

      you can also set up 2 targets so you can have always the same reference line and than you can prepare the information in advance knowing the O and L for whatever you will be setting out.

    • @SITENG
      @SITENG  2 года назад

      Can do like that too if you have a CAD drawing, working in your local system this way

  • @simonosiecki6788
    @simonosiecki6788 2 года назад +1

    Widzę ze jest tymbark. Kto ma kaca ?

    • @SITENG
      @SITENG  2 года назад

      Na pewno nie ja ;)