West Libra Power Slip Installation (Time Lapse)

Поделиться
HTML-код
  • Опубликовано: 26 апр 2018
  • NOV I&C team installing Power Slip (PS30) on Main Well for MMC commissioning.
    Credit: Dennis Landt (NOV)
    Music Credit: www.bensound.com

Комментарии • 2

  • @TheDidiButter
    @TheDidiButter 3 года назад

    Those removed are insert bowl and master bushing? Or just the bowl?