How I Merge Notion Databases: A Master Calendar Use-Case

Поделиться
HTML-код
  • Опубликовано: 27 дек 2024

Комментарии • 293

  • @elizabethpoggi6727
    @elizabethpoggi6727 4 года назад +184

    You just solved my biggest problem, you're doing such a great job with these videos can't thank you enough!

  • @betsywalker275
    @betsywalker275 3 года назад +14

    I just want to say as a Notion newbie, but one who has watched at least 30 videos, yours are the absolute best. You present meaningful topics in a clear way, but even more than that, you bring it all together. I got more from watching this one video than I got spending 2 hours scouring Reddit r/notion posts, doing Google searches, and the Notion documentation. Thank you for your contributions to the Notion community.

  • @srishti.rathour
    @srishti.rathour 2 года назад +18

    Thank you SO MUCH. This is EXACTLY what I was searching for and everyone else I found was only teaching how to create the linked databases whereas I already had my individual databases & wanted to create a master database from my existing ones. Your video was so specific and easy to understand. Thank you sooo very much!!

  • @sazzyt5000
    @sazzyt5000 Год назад +6

    Red, you’re a gem! I’ve actually been really struggling with managing my time, as I’ve got so many activities that I’m venturing into, and have been looking for ways to merge all of my notion to do lists as they’ve been getting out of hand. So this is an absolute lifesaver. I can’t thank you enough honestly!

  • @bzylarisa
    @bzylarisa 3 года назад +2

    You don't know how much your videos are helping me. I've been struggling to build a satisfactory and practical Notion system of my own. Before, I was like having dozens of disorganized databases all around my Notion. I didn't know what I was doing. All seemed too complicated and I thought I was too old for this. But I've been learning with your videos and it all started to make so much sense. It was mindblowing and eye-opening to actually be able to see all the potential Notion has. What you do is magnificent! You have inspired me a lot. Thank you so much.

  • @lucascorreiap
    @lucascorreiap 4 года назад +50

    this was very helpful, this "merged calendar" was bugging my head lately because I couldn't do it by myself so i would still need google calendar and notion, but now I can do it only with notion thanks for the video ;)

  • @marianaalvesresidencialimp7042
    @marianaalvesresidencialimp7042 2 года назад +1

    THANK YOU. your channel its the best for notion for sure! ive watched almost 10 videos already and you helped in every one of them. My notion is functional for my company in a way a never imagined. Thank youuuu

  • @rolfgehring9238
    @rolfgehring9238 4 года назад +14

    Thank you for the great inspiration. Instead of many relations and rollups, everything is now in one calendar. I used the Christmas holidays for the renovation and thanks to the great tips I'm starting the new year very clearly. All the best for 2021.

  • @overthinkinglisa
    @overthinkinglisa 3 года назад +8

    Omg changing to text property just fixed my life you glorious human!!!

  • @anasugahara1699
    @anasugahara1699 3 года назад +19

    You're a genius and I cannot thank you enough for creating this video. This is exactly what I was looking for and it saved me from so much work and confusion trying to figure out what I was going to do.

  • @wendycervera1637
    @wendycervera1637 2 года назад

    Literally have asked on so many forums about how to do this. You just blew my mind. I wish I had known this MONTHS ago! Makes complete sense! You are a genius!

    • @wendycervera1637
      @wendycervera1637 2 года назад

      LOL, well attempted multiple times tonight and kept having to revert. :) Thought I fully understood it but guess not. Will keep rewatching!

  • @SengerVampeer
    @SengerVampeer 2 года назад

    I have been using Notion for about 2 weeks now and your videos and code have helped me immensly. Thank you.

  • @momoxstarx
    @momoxstarx 3 года назад +3

    Hi, I'm a newbie at Notion and I had some anxiety starting up databases because I first thought of "but how do I combine everything?" and really needed a Master calendar before anything... So Thank you for a great video! It gave me tons of great advice of how to move forward and organize myself. I also appreciate that it took you less than 15 minutes to teach me this!!

  • @amazing_minds
    @amazing_minds 2 месяца назад

    This was a great video. It solved my exact issue of difficulty in managing multiple Notion Databases. Thanks for showing merges with different types of Notion databases!

  • @EmmaLersch
    @EmmaLersch 11 месяцев назад

    I just discovered your channel while making a notion for my first year in grad school - super helpful and easy to follow along!! Thank you for these videos!!!

  • @Juliusgunn1
    @Juliusgunn1 Год назад

    You are a true angel. Thank you for this video. My family and I genuinely appreciate the time you spent to give back to the world. 🙏🤟💌

  • @mehere1482
    @mehere1482 2 года назад +50

    Is there a way to do this but to still keep the contents in the other database as well? I want the information to be consolidated into a big database, but to also stay in the one that they were originally in as well

    • @josh.nuttall
      @josh.nuttall 2 года назад +5

      Yes with linked databases

    • @kaisinli7530
      @kaisinli7530 2 года назад +1

      @@josh.nuttall can you link more than 1?

    • @Taylor_King
      @Taylor_King 2 года назад +4

      yeah this is what i came here for... I don't know if there's a way to link more than 1 together

    • @apes2426
      @apes2426 2 года назад

      @@josh.nuttall yes, i understand on the database on the original page can simply linked to the master database, but I believed you will end up having like mixed status and select option with other original database, i.e. both Books and Projects can have "Status", but they both have different options under them, but because you append them into the master database, now you have all the status mixed up and once you create a linked database from Books to Masterbase, you will see Projects's Status as well... I believe @me here is trying to ask if you can resolve thhe problem which many people are facing

    • @apes2426
      @apes2426 2 года назад +1

      @Josh Nuttall yes, i understand on the database on the original page can simply linked to the master database, but I believed you will end up having like mixed status and select option with other original database, i.e. both Books and Projects can have "Status", but they both have different options under them, but because you append them into the master database, now you have all the status mixed up and once you create a linked database from Books to Masterbase, you will see Projects's Status as well... I believe @me here is trying to ask if you can resolve thhe problem which many people are facing
      How do you think?

  • @sautambhattacharya322
    @sautambhattacharya322 3 года назад

    So many people have been saying about , but they show how they are doing it! I couldn’t find anyone yet who told about /linked-database , Thank you! This was the biggest problem I was having!

  • @nk52358
    @nk52358 3 года назад

    Genius. You are so underrated. And I understand this channel is growing. I can see you getting a lot of subscribers soon! I believe in Notion Supremacy!

  • @SASHATOYZ
    @SASHATOYZ 2 года назад

    thanks for sharing! Searching for this info for 2 hours and no ones explained it like you :)

  • @seancasgamer
    @seancasgamer 3 года назад +2

    You have no idea how valuable this was for me. Thank you.
    I wish Notion had a way to create a "page view" that allowed me to hide and expose certain properties from something like this on a page level, but alas, that doesn't exist yet.
    Either way, this was super helpful.

  • @rozliliasalgadolue9811
    @rozliliasalgadolue9811 3 года назад +4

    Super helpful. The way you broke things down was very clear and thoughtful. This is the first time I've seen any of your videos. You're doing a great job of walking people through. Thanks so much for your help. I feel pretty confident that you gave me the tools to clear my headspace! :)

  • @NataliaRebeccaIsaac
    @NataliaRebeccaIsaac 3 года назад +3

    This is a game changer! I've seen master calendars on Notion but didn't know how to make one, and this video cleared it up fast and how. Thank you so much :)

  • @TyMar10
    @TyMar10 11 месяцев назад

    A master database to rule them all ! Thank you for this video, that's what I was looking for as I manage multiple different projects at the same time so I needed a unique database view and calendar but also wanted to keep each project isolated.

  • @DavidEsp1
    @DavidEsp1 4 года назад +18

    Reason for changing Select -> Text: Otherwise the destination property is empty (found out by experimenting).
    Also, it doesn't matter if a tag (value) has spaces in it - when you "turn into text", tag/select values get separated by commas

  • @nammafootysquad
    @nammafootysquad 2 года назад

    Thank you so much for you spending your time an energy in all your videos. This one was very useful and very much what I was looking for. Lots of love from Bengaluru, India

  • @annika8883
    @annika8883 2 года назад

    This might still be a year+ old post but super relevant to me who has just build a nest of Databases in Notion. Thank you so much for sharing!

  • @nirjrasethiaa550
    @nirjrasethiaa550 Год назад

    OMG! I spent the last 12 hours literally looking to do that!!! Thank you so much, you are a gem!!!

  • @ChrisBeaumontPhoto
    @ChrisBeaumontPhoto 4 года назад +8

    Do you know if there's a way to move db entries that have relation properties from one db to another?

  • @LatriceFowler
    @LatriceFowler 3 года назад

    This is exactly what I was looking for and on my first search. You are the "🐐" of Notion my dear. I have about 15 different databases that I totally need to consolidate and this was the 🔑! Thank you so much!!!

  • @rezende5138
    @rezende5138 8 месяцев назад

    I hope the departure was for good reasons. It appeared on RUclips, I had to listen to it again. Good luck, you deserve it!

  • @kinga6606
    @kinga6606 2 года назад +3

    As always, amazing tutorial. I love how smart, calm and friendly your instructions are :)

  • @jenanddoug
    @jenanddoug Год назад

    thank you! I've been searching for how to connect all my to-do lists from different databases and I think this might just be the best way to run my Notion account...simplify is my moto this year! Beautiful!

  • @maartjevankampen1706
    @maartjevankampen1706 2 года назад +1

    does anyone know where I can find explanation on a master to-do list which has all the tasks from separate to-do lists, while still keeping all the separate lists? like, I want a school task list, a work task-list and a household tasklist, but also a main one on my homepage which has everything compiled... someone help please

  • @adamchan9232
    @adamchan9232 3 года назад

    You are a wonderful speaker. I fall in love with your intro

  • @alanamiller2595
    @alanamiller2595 5 месяцев назад

    Thank you! This video is still helping people 3 years later

  • @maggieduncan386
    @maggieduncan386 2 года назад

    So relieved I searched for this before trying to manually bring over entries! Super helpful explanation - thank you !!

  • @MartinSchabbauer
    @MartinSchabbauer 3 года назад

    Genius. This is how to explain a complex process in a nice, friendly and professional way. Thanks.

  • @MrGamerChoi
    @MrGamerChoi 3 года назад +4

    Is that possible to "Link" instead of "Merge" my databases?
    Let's say I have multiple databases called: Study, Work, Personal
    These three databases include different articles for different purposes. I don't want to merge them all into one single Master database. Is that possible to link these three databases and filter out the "Featured" tag from my tag property so I can show specific articles that I want to show in my Dashboard?

  • @fabriziodurand8443
    @fabriziodurand8443 3 года назад +1

    During the video, u were solving every single question that showed up in my mind. I do hope this would help me too. Thank u

  • @sarabjketo
    @sarabjketo 3 года назад +2

    Hi! I explain my problem:
    I need 4 databases:
    - clients
    - contacts
    - tickets
    - final costumers
    The last 3 databases belongs to clients (so in each client I can see only his tickets, his contacts and his final costumers)
    i know how to do all of that.
    Now, when I create a ticket, I need that notion picks the information of the final costumer that I want, for example, I have the costumer phone number, and I want to select that costumer by his phone number, so now it appears in my ticket, but I also that another properties can be autofilled, for example the costumer’s name or som notes I have written about him before.
    I would also want to send a notificarion with the information I want to show to the client. Is it that possible?

  • @olafwilloughby3495
    @olafwilloughby3495 4 года назад +4

    Really useful and perfect end of year timing - thanks!

  • @edwardhosmer6852
    @edwardhosmer6852 4 года назад +3

    Red thank you so much for doing these videos! I greatly enjoy your teaching style. Very helpful.

  • @yvesschleich1917
    @yvesschleich1917 Год назад

    Awesome, thanks. So smart turning the logic around and not creating several databases and trying to link them in one (What is nevertheless not possible) you create one master and use this as a reference 🤯 Love it! It helped me a lot!

  • @jeniferdefigueiredo4500
    @jeniferdefigueiredo4500 Год назад

    Wow! Thanks much! Very excited to merge our Content database with our Events/conferences Database and be able to see it all on the calendar!!!

  • @abbywixx84
    @abbywixx84 3 года назад +3

    This isn't working for me. When I move the other line items it just shows a page icon on the master.

    • @iamkodenusi
      @iamkodenusi 2 года назад

      I'm having the exact same thing happening to me as well. Any luck fixing it?

  • @isabellaocampo5704
    @isabellaocampo5704 Год назад

    I don't leave comments often, but this really saved me!

  • @antonkaufmann9848
    @antonkaufmann9848 2 года назад

    I don't want to flatter you, but you are one of the best Notion teachers, explaining Notion here on RUclips! I am looking for a solution to the following problem, and I think you gave me the inspiration for a solution in this video. I use Bardeen to scrape LinkedIn Profile Data to a Notion Database. I have another database for LinkedIn Profiles too. The two databases have some fields that are the same and other fields that are specific to the respective database. When I run the Bardeen Playbook to scrape LinkedIn Profiles, I want to add the new scraping results to my other database too.

  • @franciellealves5102
    @franciellealves5102 Год назад

    2023 and this video helped me a lot! I was looking for a way to get together my calendars from different activities to be more productive. So, THANK U!

  • @florianfranco8523
    @florianfranco8523 3 года назад

    You just solved a major issue for me. And on top of it sparked a lot of ideas for my Notion Workspace. Thank you so much.

  • @multosakalye
    @multosakalye 2 года назад

    Thank you so very much for this, Red! It answered all the gaps and voids of information in my head about trying to consolidate and harmonize my Notion system. Liked & Subscribed!

  • @Justo777
    @Justo777 2 года назад

    Thanks very clean and easy to understand. I wish all videos are like yours.

  • @ahjahjohnson2535
    @ahjahjohnson2535 Год назад

    Thank you so much! You explained this really well and felt that the speed of the video was new user friendly. Thank you Thank you Thank you!!!

  • @mcprince
    @mcprince 2 года назад +1

    Hi, Red! I can't get the several assignment schedules I have made for each class to merge into one master assignment schedule. I tried the paste method but it didn't transfer any of the categories info. I tried the move to method, but the other master table I made doesn't show up when I search the list that comes up. :\

  • @brightart4628
    @brightart4628 3 года назад +3

    Thank you for saying about "i hope it helps" in the end of the video!
    This inspired me to share: yes, it helps, it helps tremendously! I'm 27y.o. from Crimea, Russia. I'm trying to make a database for tracking books, trainings, sleep log, food log etc. I feel like this makes my life so much better, more calm and more proud of accomplishment since they noted.
    So I'm trying to learn how to use notion, and actually your channel is the best I found for this purpose. Your skill and point of view, your ideas and your calming voice - everything is so helpful. I watch your videos for a month already, they have been a great help.
    Also English is my third language, so your articulation is really clean, it is easy to understand what you are saying. Nd video editing skills - like, I'm seeing this formulas for the first time - and I can understand it. Because of you 🍀
    So yes, your videos are very helpful, they give me knowledge of hot to make my life better. Thank you so much 💖✌️

  • @PaskalS
    @PaskalS 3 года назад

    I've watched this video multiple times - I set up my work and personal workspaces using this technique (although it's not necessary for everything to be combined into one DB). Thanks! 🙏

  • @usuario_youtube2
    @usuario_youtube2 Год назад

    AABSURD quality of speech and display of talent and work, thank you and congratulations.

  • @nelsonrodriguez7827
    @nelsonrodriguez7827 2 года назад

    Thanks for sharing your knowledge, I would like to know if there is any way to place plain text with a date and it is attached to a calendar? that is, without going through a database only plain text, thanks

  • @rachelrhee
    @rachelrhee 4 года назад +1

    I have spent hours trying to find a tutorial on how to do this. THANK YOU

  • @raevski9096
    @raevski9096 Год назад

    Thank you so much! I just started using Notion and want to create a futureproof all-in-one system with multiple workspaces. And for that I need a single master calendar for all the various tasks, and I couldn't quite figure out how.

  • @sl2099
    @sl2099 9 месяцев назад

    Thank you! Such a great video! I'm just wondering whether it's possible to access everything from Master data base not in calendar view, but also in the table view?

  • @weezyf775
    @weezyf775 Год назад +1

    i see this video is from 2 years ago - is this still the best way to do this? or has notion solved for this natively?

    • @paulinekarpenko
      @paulinekarpenko 2 месяца назад

      There is Notion Calendar now, where you can simply display all your dbs with a date field. Or, you can create an automation to duplicate your records to a master database, once you've created them in a dedicated db, e. g. Tasks.

  • @MaryK-f7e
    @MaryK-f7e 10 месяцев назад

    This is exactly what I needed help with, and it made perfect sense to me. Thank you!

  • @YolandeduPlessiswriter
    @YolandeduPlessiswriter 3 года назад +2

    Thank you so much for the video! It was an eye opener. ⭐
    In fact, as a side note, your videos are informative and easy to understand! 👍🏻
    Perhaps, instead of saying "hope this makes sense", say "if anything is unclear, please leave a note in the comments". 😉

  • @Bomae-n6f
    @Bomae-n6f Год назад

    Thanks, i set this up. I have a "home page" with a calendar view database linked back to the master database.
    On that home page, if i add a task on the master calendar, the task comes up with every single property.
    Any way around that?

  • @marlonbmneves
    @marlonbmneves Год назад

    E searched this in all the web and you the only people teaching that

  • @danielaknecht8994
    @danielaknecht8994 3 года назад +1

    What happens, if I move something that is linked (use case: I have a study log, that is referring to what I did from my study to do) into another DB (i.e. the study to do into a master to do). Will the link persist? Or will I have to re-link every entry in the study log to the entries in the master to do list?

    • @brendalg4
      @brendalg4 3 года назад

      Did you find out?

    • @danielaknecht8994
      @danielaknecht8994 3 года назад

      @@brendalg4 I have just tested it and it seems you will need to link things again. So if you want to merge multiple DBs that are linked, I suggest to turn the DB with the most links into that master, that way you don't have replicate ALL the links but only the one's that didn't come from one particular DB.

  • @lbeenites
    @lbeenites 3 года назад

    Red you are the true gem! Thank you for uploading this type of stuff.

  • @kcochran5700
    @kcochran5700 2 года назад

    I am unable to drag like you do. It won't let me drag up to the master database. When I drag, it removes the info from my Course Schedule, populates a tiny picture of a piece of paper in the Master; and when I click to open that, there was generated a bunch of blank pages with the same name as my assignments, but there is no data in any of those pages.

  • @leol5416
    @leol5416 Год назад

    Heyy! Thank you for your work 🙏🙏 but still I have a question : How can I do with my Relations / Rollups / Formulas ?
    Thank you 😊

  • @Evanescence4ever100
    @Evanescence4ever100 4 года назад +1

    what about habit tracking databases? i have one for habits and one for goals, both of which have checkbox properties. and each have entries for each day. can i combine those? because the dates will be duplicate, there will be one date entry with my habit info and another date entry (both of which are the of same day) with my goal info

  • @jjsereday
    @jjsereday 3 года назад +1

    Is there a way to copy Database relations from one database to the other? This is a huuuuuge problem if not 😭

  • @vektrensecurity
    @vektrensecurity 3 года назад

    Thank you for the video, it helped me understand a lot more about how database linking works. I tried linking multiple databases into a master database.. but this is so much easier to link independent databases from one master database using filters.

  • @MALOsstuff
    @MALOsstuff Месяц назад

    But what if I can't duplicate a row to another table view database? If I click on a row and go on "move to" and move it to an existing table, then just the name will appear as a new page. It won't have any information and won't be a table row, just an empty page to click on? HELP

  • @AlexisKing-t6e
    @AlexisKing-t6e Год назад

    YOU ARE THE GREATEST PERSON RIGHT NOW!

  • @AA3890
    @AA3890 3 года назад

    I‘m from Germany and new to Notion. But I love to explore new functions. Also love the way you explain, its always easy to understand. Just love your videos!❤️Keep up your good work! Hope to get to know more about relations und formulas soon as well

  • @bramelsheretan
    @bramelsheretan 4 года назад +5

    Thank you, yet another great tutorial to add to my knowledge base

  • @chloeginsberg8787
    @chloeginsberg8787 2 года назад +2

    This video was super helpful! I was wondering if anyone had a solution for the following: With this master database, all of your templates now have the same properties. Is there any way to filter properties by template? I don't always fill in every single property (which is why I don't want to use the "hide when empty option") but I would like for the relevant properties to appear on select templates, and are hidden on the others.

    • @Bomae-n6f
      @Bomae-n6f Год назад

      Did you get a solution for this?

  • @bovineox1111
    @bovineox1111 Год назад

    Great video but struggling to merge fields that may be auto-generated. I would like to be able to retain things like Created Date and Reported By but you cannot do so, you cannot even rename these and merge them to a different date or text field. Formula fields are also a problem - if you have any tips, I'd be grateful!

  • @DanAlexandruGeorge
    @DanAlexandruGeorge 2 года назад

    Hi,
    Some questions. When you merge and you delete, for example, the Journal, the Journal database doesn't exist anymore? It's not like you're creating a merged view of all of the databases but you move the pages from those three databases to the Master one. I am asking because I've just started to use Notion and my approach is to create a Big database and use views of it in different contexts, like blog content, tasks, courses etc. Thank you.

  • @dionneyoga
    @dionneyoga Год назад

    the way i liked and subscribed with a quickness! thank you! been wondering how to do this for years! 💜

  • @chloeforbesk
    @chloeforbesk 3 года назад

    Thank you so much for creating this video! I was getting so frustrated with relations and rollups. This is so much simpler and easier to use. I cannot express just how helpful this was! Thank you. :)

  • @jajohnson1959
    @jajohnson1959 3 года назад

    Very Helpful, I have 2 companies to run and way to much to do. Started using Notion and things are getting messy. Thanks and keep up the good work.

  • @aimeecortez5899
    @aimeecortez5899 3 года назад

    Thank you so much!! I had no idea about the "turn multiselect etc into text" trick, it was super useful!

  • @mariacamilapinzon9809
    @mariacamilapinzon9809 3 года назад +1

    This is awesome! I've been looking for how to do it for ages, thank youuu

  • @c4rmenius
    @c4rmenius 10 месяцев назад

    What if one of the pages where I need the tasks for my master calendar is a shared one? Bc I dont want to mess up the shared Tasks - and if I do a copy I wont get any of the new tasks?

  • @lukeMac
    @lukeMac 3 года назад +4

    Notion has improved this since 2020 - you no longer have to change the select to text but you need to make sure that the destination database has ALL the options that the origin database has, or the property will be blank when you move it. Selects take on the colour of the destination database too.

  • @generationsarising
    @generationsarising 3 года назад

    I am having issues when I use a template to create my tasks. It's changing on every item I add instead of just on the new one I created with the template.

  • @BrianTheoret
    @BrianTheoret 3 года назад

    This is amazing stuff! Thanks for the info!

  • @giuseppedesena5184
    @giuseppedesena5184 10 месяцев назад

    Hi nice video and thank you for it! But can someone explain me why it doesn't work to me? More precisely, when i try to drag rows from an existing database to a new empty one that should be the master, properties are not pasted. Why it happen? I will be very grateful to anyone who answers me

  • @lizzylizzy744
    @lizzylizzy744 4 года назад +5

    Thank you very much, your explanations are very clear! And yes, I’m gonna simplify !

  • @spg223
    @spg223 Год назад

    Thanks so much! is there a way to do this while maintaining the tasks in their original databases - but getting them to also appear in the new master database?

    • @paulinekarpenko
      @paulinekarpenko 2 месяца назад

      You can do this by setting an automation to duplicate the record to the master db, once you've added it to a dedicated db like Tasks.

  • @DomoNumero
    @DomoNumero 2 года назад

    when i add a new view, the data from the first view copies over and I cant delete it cuz it essentially deletes everything? I'm not sure how to fix this :(

  • @freespiritkaro3414
    @freespiritkaro3414 3 года назад

    Yessssssss Gurl !!! Thanks so much 🙏 My question is: Is it possible to use Notion as a website, where people can book appointments & book themselves into online events INTO a calendar like this, which I publish as I go along ? How would this work and is it possible for this set-up to be free in the beginning, as I am building a clientele ?
    I’ve figured lately that I spend so much time in Notion for so much private life & biz management anyway, that it could be quicker and easier, if I could integrate the 2 and just make certain pages public for customers and voila ! Note: I am not a developer and might need help with this. I just wonder if this is more time efficient as opposed to planning a project in Notion and then publishing the same end result in Wix (or else) again ?

  • @camerontan
    @camerontan Год назад

    got the help i was looking for! highly informative and easy to follow, thank you sooo much!!!

  • @flowerflower1154
    @flowerflower1154 3 года назад

    OH MY GOD... this is what I have been looking for .... Thank you so much for the super tool! I (and my boss) will definitely be happy.

  • @anjenettecasino6450
    @anjenettecasino6450 3 года назад

    I've been struggling to do this for weeks!!! Thank you so much!!

  • @AprilAprilQQuillosa
    @AprilAprilQQuillosa Год назад

    Hi Red,
    Just want to confirm that the dropdown view is no longer available in Notion right?
    Because I tried to add a view, but it is not showing as dropdown, it looks more like added tab like in excel.
    Can you please confirm? or is there a way to make it a dropdown view list like the one in your video?
    Thanks a lot in advance. you are so helpful your videos help me a lot at my work.

  • @findingmyplanner-self5216
    @findingmyplanner-self5216 4 года назад +2

    Thank you for this. I’m just starting out so I am excited to create a merged calender from the get go!

  • @Ghaleon
    @Ghaleon 3 года назад

    I have 4 databases (Planner for each platform).
    IS there a way to create a single calendar to join the 4 databases? (they all have the same "deadline" field)