Edge Girder Install | Gordie Howe International Bridge [4K] Detroit, Michigan

Поделиться
HTML-код
  • Опубликовано: 26 апр 2024
  • Join this channel to get access to perks, including early viewing before releases:
    / @michaelanthonyvideos
    To buy Michael a coffee as a way to say thanks or help the channel go to:
    buymeacoffee.com/michaelantho...
    Thank you for your support!
    The channel has surpassed 1,000,000 million views.
    Thank you very much to all the viewers and subscribers!
    A special thank you to the channel members and Patreon members! Your support helps so much.
    The construction of the Gordie Howe International Bridge is a major infrastructure project spanning both the United States and Canada. The bridge is named after Gordie Howe, a Canadian ice hockey player who was one of the greatest players in the history of the sport.
    The project involves a significant workforce, including engineers, construction workers, project managers, environmental specialists, and various other professionals. These workers come from both sides of the border and collaborate to ensure the successful completion of the bridge.
    NOTICE
    17 U.S. Code § 106 - Exclusive rights in copyrighted works
    The Digital Millennium Copyright Act (DMCA)
    Intellectual Property Organization (WIPO) treaties: the WIPO Copyright Treaty and
    the WIPO Performances and Phonograms Treaty. The DMCA also addresses a
    number of other significant copyright-related issues.
    REPODUCTION OF A PUBLISHED VIDEO AND PLAGAIRISM IS ILLEGAL
    www.copyright.gov/legislation...
    DJI Mini Pro 4 aerial drone video 4K
    Michael Anthony Videos
    If you enjoy this content, please consider subscribing to the channel.
    #megaprojects #detroit #michigan #ontario #canada

Комментарии • 90

  • @robertkaspert4092
    @robertkaspert4092 Месяц назад +23

    Another awesome video Michael. These have to be the best videos on RUclips thanks. The crane operator and all the bridge builder's are the best 👍👍👍👍👍👍👍👍👍.

  • @lonniejohnson7092
    @lonniejohnson7092 Месяц назад +19

    WOW - Absolutely Amazing - These workers really know what they are doing - and Everyone seems to be so SAFETY CONSCIOUS.

    • @dougall1687
      @dougall1687 Месяц назад +3

      Well, apart from at 2:26 when the guy in orange at the bottom of the mobile scaffolding shifts it to one side while the guy in green balanced on the top of it almost falls off ... and then seems to give the guy below a bit of an earful.

    • @michaelanthonyvideos
      @michaelanthonyvideos  Месяц назад

      @@dougall1687 yeah that was pretty shaky.

    • @michaelsharp9925
      @michaelsharp9925 Месяц назад +1

      Safety conscious- duaaa

    • @DavidZwarych
      @DavidZwarych 29 дней назад

      ​@@dougall1687 Sharp eye!

  • @skywatcherca
    @skywatcherca Месяц назад +20

    Be careful everyone; no one is allowed to get hurt on this project - Canada/USA - best friends on the planet...NO INJURIES...everyone goes home safe. GREAT project.

  • @wesleydolen9180
    @wesleydolen9180 Месяц назад +10

    Wow! That crane operator has amazing skills!

    • @blackmoom
      @blackmoom Месяц назад +5

      Those huge cranes just mesmerize me. The best of the best, those operators ⭐

  • @WeazelJaguar
    @WeazelJaguar Месяц назад +11

    So nice to see how easily the bolts just slid right in, accuracy plus!!!

  • @blueman5924
    @blueman5924 Месяц назад +8

    Nine buckets of bolts on the beam, Hanging in the air, workin the livin dream. Nice flying too. 🇨🇦🤙

  • @blackmoom
    @blackmoom Месяц назад +6

    I bet those guys sleep well at night! Hard work 💪. Thanks for posting and keep 'em coming!

  • @williamjones7163
    @williamjones7163 Месяц назад +6

    The person operating the crane doesn't get paid enough!!! !!!😊

    • @WeazelJaguar
      @WeazelJaguar Месяц назад +2

      Oh he gets paid enough!
      He pension will be great too, he earnns it every day!
      Now think of the operator in the tall tower crane, who gets to just watch most of the action from up high, and yes, they earn it too!

  • @railpast
    @railpast Месяц назад +3

    Those crane operators are going to be millionaires after the project but it's worth it they sure do a great job

  • @richardchampion4826
    @richardchampion4826 Месяц назад +1

    Son was in town 3 weeks ago to visit, took him for a ride to see the construction, he was impressed. Drove under it on the American side.

  • @wdhewson
    @wdhewson Месяц назад +3

    Proof that there is great honour and dignity in work !!

  • @geomodelrailroader
    @geomodelrailroader Месяц назад +6

    final Canadian and American edge beams are going in we are now down to 20 feet.

  • @wesadrian6981
    @wesadrian6981 Месяц назад +6

    One Humungous Lego set😂

    • @refich
      @refich Месяц назад +1

      My thought, too.

  • @jeffdragna316
    @jeffdragna316 24 дня назад

    These workers are awesome what accomplishment

  • @refich
    @refich Месяц назад +2

    Glad to see all the safety harnesses used today. I have observed that this is not always the case.

  • @thomasduff3725
    @thomasduff3725 Месяц назад +3

    looks like the ironworker on the scaffold did not know his placement was bad and someone was going to move it for him!

  • @JohnnyMotel99
    @JohnnyMotel99 25 дней назад

    I like the row of buckets along the girder, I guess for the few hundred bolts.

  • @jeffdragna316
    @jeffdragna316 24 дня назад

    Awesome videos

  • @Nightsweeper
    @Nightsweeper Месяц назад +3

    Don’t spill those buckets of blots and nuts.😃

  • @jeffdragna316
    @jeffdragna316 24 дня назад

    So cool

  • @kenhuelin4003
    @kenhuelin4003 Месяц назад

    What is the size and quantity of bolts required just to make up each end of the main outside beam connection? Very impressive footage of the construction.

  • @nedkent5239
    @nedkent5239 Месяц назад +1

    Unions build this country 🇺🇸!

    • @bobhall4588
      @bobhall4588 27 дней назад +1

      Union workers NOT unions!

  • @davidmoran1422
    @davidmoran1422 Месяц назад +1

    Very nice. Thanks for sharing.

  • @happyhome41
    @happyhome41 Месяц назад +2

    I would be interested to see a chart of the loads, with margins, on the suspension cables. As more edge girders are added, the angle of the stays becomes more acute, increasing the load, as more of the force is in compression (toward the tower) in order to maintain the same level of suspension. And will the stays continue all the way to where the bridge is joined in the middle, or will longer “bridge” girders be used to fill the gap ?

    • @PaulLaginess
      @PaulLaginess Месяц назад +3

      As I understand it, there is one more set of edge girders and cross beams to go on each side (15 meters length) and one more pair of stays attached to each. Then they'll add a single piece in the middle. At this point, I'm sure they know exactly what the dimensions of that piece will be. I'd love to know where that's being manufactured and how far along they are in getting it ready for installation.

    • @kkarllwt
      @kkarllwt Месяц назад +3

      @@PaulLaginess Would that center piece have to be some kind of slip joint to allow for 120 degree temp differences of the steel. And earth movement of the towers over time. North america is still rising, and distant earthquakes. New Mardrid Fault. Charleston fault.

    • @5thgen916
      @5thgen916 Месяц назад +3

      The compression is vertical on the tower from both the over land and over water spans. They are in balance to avoid a horizontal load on the tower. It's a big swing with an anchor point at the back of both over land spans. The middle section is just a wedge to transfer wave loads of moving traffic between those two points. Charts and loads are moot. The purpose is to balance them with an engineered range based on respective material strengths.

  • @thomasrobinson8336
    @thomasrobinson8336 Месяц назад

    Just amazing

  • @joefin5900
    @joefin5900 Месяц назад +2

    One of those connectors will be first to cross! Lucky him.

  • @VincentOLeary-ku7oi
    @VincentOLeary-ku7oi Месяц назад +4

    Its amazing does anyone know if those bolts have double nuts on it

    • @guynorth3277
      @guynorth3277 Месяц назад +2

      I'm pretty sure Canada doesn't want their bridge to fall, they've put a lot of effort into it, and they are hoping it will aid their economy. That noise in the back ground is like something you'd find on NPR 0600 hours on Sat and Sun mornings.

    • @dangroat4438
      @dangroat4438 Месяц назад +2

      Probably and I would bet that the last nut is welded to the bolt to prevent it from coming loose once they tighten it.

    • @kkarllwt
      @kkarllwt Месяц назад +2

      Probably a pre applied locktite of some sort.

    • @BasementEngineer
      @BasementEngineer Месяц назад +3

      Vin: I doubt it very much. The bolts are tightened such that the stress in the plastic range. They will not loosen due to vibration. Having said that, it is absolutely imperative that all bolts are properly tightened as proscribed by the Canadian Handbook of Steel Construction. Not doing so will cause the joint and bolts to fail in fatigue.
      Structural bolted joints have now been in use for 90 years or so and I know of only 1 instance where a joint failed in fatigue. This was caused by improper tightening of the respective bolts.

  • @robertrisk93
    @robertrisk93 Месяц назад +1

    How long is each one of those girders?

  • @markpettijohn9195
    @markpettijohn9195 Месяц назад +1

    How about shooting a video of the cable stay placement?

  • @thuanphong6677
    @thuanphong6677 Месяц назад +1

    Quá tyệt vời.❤❤❤

  • @falconseyeaerialservicesll8176
    @falconseyeaerialservicesll8176 Месяц назад

    As a licensed drone pilot, awesome video. Great flying and perfect choice of music. I am now a new subscriber of this stunning video. May I ask the name of song and artist of this music in this video?

    • @michaelanthonyvideos
      @michaelanthonyvideos  Месяц назад

      Thank you for subscribing to the channel! The music credits are in the description.

  • @chuckyc6912
    @chuckyc6912 Месяц назад +2

    Great work stay safe

  • @joeminella5315
    @joeminella5315 Месяц назад +1

    👍👍👍👍👍

  • @user-gf3lw5pi4t
    @user-gf3lw5pi4t Месяц назад

    There so close when do they expect contact

  • @username22
    @username22 Месяц назад +4

    What is the length of the beam?

    • @PaulLaginess
      @PaulLaginess Месяц назад +3

      They're all 15 meters.

    • @dangroat4438
      @dangroat4438 Месяц назад +5

      At this point probably 65 to 85 feet. The beams get shorter as you near the middle, and I am just guessing there. It still weighed 90,000 pounds, and that is at least a 60 inch beam. Pretty cool to watch them install it.

    • @kkarllwt
      @kkarllwt Месяц назад +2

      @@dangroat4438 You could vary the length of the beams and use the same strength cables, or, the same length beams and increase the cable strength as you went out.

  • @railpast
    @railpast Месяц назад +2

    I'm surprised they let you get that close with the Drone

    • @michaelanthonyvideos
      @michaelanthonyvideos  Месяц назад +1

      They must like me.

    • @bobhall4588
      @bobhall4588 27 дней назад

      When we first started using drones to document progress we had to use them after the site was down. It was too distracting to the workers. Now drones are all over and most folks never notice.

    • @railpast
      @railpast 27 дней назад

      @@bobhall4588 That may be true but when they are working hundreds of feet in the air respecting their privacy and not providing even the smallest distraction should be the first priority. Drones are electronic device and there are many videos of them doing their own thing. It would be terrible if a malfunction happened and caused injury to one of the workers.

  • @GFSwinger1693
    @GFSwinger1693 Месяц назад +1

    5:30 Safety harness or not. Standing on a wobbly ass scaffold several hundered feet above a river is not for the faint of heart.

  • @LawareDavers
    @LawareDavers Месяц назад

    better

  • @jeffdragna316
    @jeffdragna316 24 дня назад

    Saftey harnesses

  • @markb9241
    @markb9241 Месяц назад +3

    Amazing how fast these union workers work when there’s a drone overlooking there every move! Should have a drone on them all the time maybe the bridge would finish on time and on budget???

    • @KAM-zi9zl
      @KAM-zi9zl Месяц назад

      You are ignorant

  • @philiphorner31
    @philiphorner31 Месяц назад

    Hopefully there's no way a ship can strike the bridge.

  • @steeleaquain
    @steeleaquain Месяц назад

    Last section?

  • @pinocircular9913
    @pinocircular9913 Месяц назад

    Don't tighten too tight...just hand tighten please....just my opinion.

  • @peterjaniceforan3080
    @peterjaniceforan3080 Месяц назад

    👷🏻‍♂️🛠️🫡

  • @PacoOtis
    @PacoOtis 7 дней назад

    Pitiful that you provide intrusive horrible music instead of the sounds of construction! Does an adult review these video prior to release? This is a rather awful format!

    • @michaelanthonyvideos
      @michaelanthonyvideos  7 дней назад

      Pitiful that you don't know how to turn down the volume if you don't like what you hear.

  • @badassat69
    @badassat69 Месяц назад +2

    This video is really instructive. Is it appropriate to ask technical questions? If so, two questions keep returning to my mind from video to video: 1.To the untrained eye, there appear to be many holes, close to each other, in the short and thin overlapping steel sections that hold the girders together; don't these holes weaken these sections? 2. Could someone indicate if there is a video that shows how the 2 meter long (or so) white tubes on the girders, where the suspension cables are inserted, how these tubes are affixed to the girder? I see many indents/holes/rivets in the other side of the wall of the girder that seem to correspond to the location of the tube. Again, to the untrained eye this installation seems superficial, mostly attached only to the wall of the girder and not to a reinforced section. Could someone provide details?

    • @BasementEngineer
      @BasementEngineer Месяц назад +2

      bad: I can give you a partial answer. The total thickness of the splice plates is equal to or slightly greater than the beam member (vertical = web, horizontal = flange) being spliced. The design engineer makes allowance for all the bolt holes in the beam members and splice plates so that the allowable stresses are not exceeded. The Canadian Handbook of Steel Construction has rules and guide lines for this type of design.
      The stay cable attachments are a bit of a puzzle. A detail drawing of this item would be interesting. One way of doing this would be to make the attachment tubes a high quality steel casting, with the attachment holes drilled and tapped (threaded) into this casting. But I really don't know how it is done on this job. A heavy weldment would be another way, perhaps utilizing submerged arc or electroslag welding to join the pieces. The final piece is then bolted to the edge beam.

    • @badassat69
      @badassat69 Месяц назад +1

      @@BasementEngineer Thank you for your concise and ponderate answers.