NS 242 in Duluth ga

Поделиться
HTML-код
  • Опубликовано: 5 фев 2025
  • NS 242 took about 40 minutes to get here after that signal changed. However the main hold up was after the call for beaver dam and before the call for Carolina. It took about 7-8 minutes for the call for Carolina to be heard after beaver dam. I guess this train was struggling up the hills because I heard that they are going to replace the trains power at Gainesville.

Комментарии •