Hinkley Point C: The Race To Beat The 2026 Deadline

Поделиться
HTML-код
  • Опубликовано: 4 янв 2025

Комментарии • 11

  • @bobmanyo1
    @bobmanyo1 3 месяца назад +2

    great video, needs more views

  • @johnbyrne1433
    @johnbyrne1433 15 дней назад

    I work at HPC and not a chance of finishing more like 2030 and that's NI1

  • @cartman67ch204
    @cartman67ch204 10 дней назад

    man you dont even talk of the polar crane inside the building! no heavy equipment lifted without it

  • @Psi-Storm
    @Psi-Storm 3 месяца назад +1

    The car charging example is off by a magnitude. The 3200 MW the power plant produces, can only charge 16000 cars at 200kw at the same time, not 1.6 million.

  • @eddaines237
    @eddaines237 Месяц назад +2

    So many errors here. Cheap AI clickbait.

  • @TheOtherSteel
    @TheOtherSteel 3 месяца назад

    00:35 -- "...estimated at fifty-eight dollars [sic] billion..."
    That must be: "...estimated at fifty-eight billion dollars..."

  • @nvbnvb2240
    @nvbnvb2240 3 месяца назад

    its all about scale wanted it cheap you should have ordered 10 times same design or better(ur missing easy way to retro fit aca enable 120 years or longer + bye swapping out boiler...the biggest cost is the concrete shell and shielding bye making design with swapable boiler you automaticly make the project nearly free (thanks to inflation)) aca 70% nclr 0 co2

  • @RaySqw785
    @RaySqw785 Месяц назад +1

    total BS on everything , luv dah eco greenies fanboyos vids about industrial plants!

  • @TheEntrncd
    @TheEntrncd 3 месяца назад

    This is ai