How to Dig a Pipeline Riser

Поделиться
HTML-код
  • Опубликовано: 10 сен 2024
  • #RiserInstallation #PipelineRiser #FacilityRiser #Hitachi350
    Digging in a 8’ foot deep riser with 3’ feet of frost. Start with the math on how wide to dig. Rip the frost, frost removal and Riser install. Taking shots with a builders level to get the dirt as close as possible to the right elevation before lowering in the riser.

Комментарии • 11