Capacity Planning - Overview and Key Concepts

Поделиться
HTML-код
  • Опубликовано: 30 сен 2024
  • Capacity Planning and Management are explained in this video.
    ___________
    👉 Optimize your production with our Lean Bulk!
    Resources, checklists, and templates to excel in Lean Manufacturing.
    Discover more now! www.leanvlog.c...
    ___________
    The text was created by an experienced Lean Thinker that gives his point of view on the "Capacity Topic". Thanks to Alberto Robledo for the text of this video.
    In the video, you will find information about:
    - Planned Capacity
    - Effective Capacity
    - Utilization
    - Short Term Capacity
    - Medium Term Capacity
    - Long Term Capacity
    👉 Learn Lean Manufacturing Faster
    www.leanvlog.c...
    ✏️ Here the transcript of the video
    Capacity Planning.
    ▶ Capacity is the maximum rate of output of a process or system
    Capacity is in our daily life:
    - How many people should a concert hall have?
    - How many people should a restaurant be able to serve?
    - How many batteries should a plant be able to produce?
    ▶ Design Capacity: Theoretical Maximum output in a given period under ideal conditions. Project engineer design machine to run at 200 parts per minute
    ▶ Effective Capacity: Output expected by the company under current operations constraints (for example different product mix as was initially designed, some capacity cushions, ...)
    Capacity available is affected by
    A) Work content change
    B) Product mix change
    C) Equipment change
    D) Speed or pace at which the work is done
    ▶ Measure
    - Utilization = Real Production / Design Capacity
    - Efficiency = Real Production / Effective Capacity
    Efficiency is the main driver for the Operations Director
    ▶ Capacity and Strategy:
    1. Add capacity to go ahead with demand
    This is an expansionist strategy. This can result in economies of scale
    2. Wait and see
    This is a conservative strategy. It follows demand and expands in smaller increments. One risk is that we perhaps can be unable to respond to high demand.
    Management should choose between these 2 strategies or another in between.
    According to the horizon, we can talk about:
    ▶ Short-term capacity (0-3 months). Our main drivers for capacity management are planning jobs, planning people, schedule machines
    ▶ Medium-term capacity (3-12 months). Our main drivers are Subcontract operations, Add manpower, Increase or use stocks, add shifts, add equipment
    ▶ Long-term capacity planning (1-5 years). Our main drivers have added installations, add equipment with long installation lead time...
    Of course in short-term capacity planning, you can also add overtime work.
    ツ CONNECT WITH ME ツ
    Hi,
    my name is Mark Anderson a 20+ year Lean Expert.
    I have created LeanVlog because I want to spread Lean Thinking worldwide and I think the video is the most effective way to teach, learn, and spread knowledge.
    If you want to stay in touch with me you can choose the channel you prefer.
    A) Let us connect on Linkedin
    / mark-anderson-leanvlog
    B) Meet on Facebook
    • Facebook: / leanlab-146290372099121
    C) Latest Videos and Playlist
    • Website: www.leanvlog.com
    D) 2 Videos Every Week
    • Telegram Channel: t.me/leanvlog
    #LeanVlog #Lean_Production #Capacity_Planning

Комментарии • 11