Emergency Generator OFF-LOAD and ON-LOAD TEST. | SOLAS Regulation for Emergency Power Supply.

Поделиться
HTML-код
  • Опубликовано: 2 май 2023

Комментарии • 19

  • @pogssss5058
    @pogssss5058 Месяц назад

    Thank You Sir,

  • @vladimirshandrenko5139
    @vladimirshandrenko5139 Месяц назад

    Thanks a lot

  • @francisglenndimacuha4030
    @francisglenndimacuha4030 10 месяцев назад +1

    Thank you Lecky

  • @hunskhant-xq7pv
    @hunskhant-xq7pv 6 месяцев назад

    Wow very good post migo.. good working habits. ❤❤❤❤

  • @WandiSuardi
    @WandiSuardi 10 месяцев назад +1

    thank you for your great video sir, thats really help..

  • @natnaeltesfaye8280
    @natnaeltesfaye8280 5 месяцев назад

    Thank you and pls make another video how to setting the 45 sec time relay and point as the located

  • @malakadananjaya2046
    @malakadananjaya2046 Год назад

    Great video

    • @leckylouie
      @leckylouie  Год назад

      Thank you for watching sir..

  • @denwa-pres
    @denwa-pres 7 месяцев назад

    Ayos ka lecky

  • @thanhtutaungetr
    @thanhtutaungetr 3 месяца назад +1

    Thanks for your vidoe

    • @leckylouie
      @leckylouie  3 месяца назад

      thank you.keep watching

  • @anasamery2186
    @anasamery2186 4 месяца назад

    Thank you. I have a question after I disconnected the supply from the main power in the case of the test.... After the generator starts and supplies the emergency switch board, what will be the fate of the electricity generated during the emergency, because in the case of the examination, the main generator is the one that supplies the power,

    • @leckylouie
      @leckylouie  4 месяца назад +1

      Sir, during the test of Emergency Generator, the TIE BREAKER between MSB and ESB will automatically open. then the MSB has still normal power. But the ESB is totally blackout during the test and the back up Emergency generator will start and gives supply to ESB.

  • @randynotarte9943
    @randynotarte9943 22 дня назад

    Sir paano Yung dalswang g/e nka parallel tapos pag tsnggalen Ang load Ng Isang g/e nag prefential trip

  • @sultanhussain6051
    @sultanhussain6051 19 дней назад

    For on load test should we required to turn off radar equipment etc ...kindly reply

    • @leckylouie
      @leckylouie  11 дней назад

      Yes, to avoid damaging the radar and other bridge equipment. always inform the bridge duty officer to shutdown radar and ecdis prior blackout simulation test.

    • @sultanhussain6051
      @sultanhussain6051 11 дней назад

      @@leckylouie yup ...many Thanks

  • @spanasia317
    @spanasia317 7 месяцев назад

    SIR SAAN MAKITA ANG TIMER RELAY PARA MEET NIYA YONG BELOW 45 SECOND.

    • @leckylouie
      @leckylouie  7 месяцев назад

      sir,.sa.loob ng.emergency.switchboard, andoon ang mga.timer relay. naka.set ng.SECONDS.