Emergency Generator OFF-LOAD and ON-LOAD TEST. | SOLAS Regulation for Emergency Power Supply.

Поделиться
HTML-код
  • Опубликовано: 21 сен 2024

Комментарии • 20

  • @hunskhant-xq7pv
    @hunskhant-xq7pv 8 месяцев назад

    Wow very good post migo.. good working habits. ❤❤❤❤

  • @WandiSuardi
    @WandiSuardi Год назад +1

    thank you for your great video sir, thats really help..

  • @francisglenndimacuha4030
    @francisglenndimacuha4030 11 месяцев назад +1

    Thank you Lecky

  • @natnaeltesfaye8280
    @natnaeltesfaye8280 7 месяцев назад

    Thank you and pls make another video how to setting the 45 sec time relay and point as the located

  • @malakadananjaya2046
    @malakadananjaya2046 Год назад

    Great video

    • @leckylouie
      @leckylouie  Год назад

      Thank you for watching sir..

  • @thanhtutaungetr
    @thanhtutaungetr 4 месяца назад +1

    Thanks for your vidoe

    • @leckylouie
      @leckylouie  4 месяца назад

      thank you.keep watching

  • @denwa-pres
    @denwa-pres 9 месяцев назад

    Ayos ka lecky

  • @vladimirshandrenko5139
    @vladimirshandrenko5139 3 месяца назад

    Thanks a lot

  • @pogssss5058
    @pogssss5058 3 месяца назад

    Thank You Sir,

  • @flootfivesailor9837
    @flootfivesailor9837 6 дней назад

    Sir how to solve problem in case emergency generator cannot auto load when main generator black out

  • @anasamery2186
    @anasamery2186 6 месяцев назад

    Thank you. I have a question after I disconnected the supply from the main power in the case of the test.... After the generator starts and supplies the emergency switch board, what will be the fate of the electricity generated during the emergency, because in the case of the examination, the main generator is the one that supplies the power,

    • @leckylouie
      @leckylouie  5 месяцев назад +1

      Sir, during the test of Emergency Generator, the TIE BREAKER between MSB and ESB will automatically open. then the MSB has still normal power. But the ESB is totally blackout during the test and the back up Emergency generator will start and gives supply to ESB.

  • @randynotarte9943
    @randynotarte9943 2 месяца назад

    Sir paano Yung dalswang g/e nka parallel tapos pag tsnggalen Ang load Ng Isang g/e nag prefential trip

  • @sultanhussain6051
    @sultanhussain6051 2 месяца назад

    For on load test should we required to turn off radar equipment etc ...kindly reply

    • @leckylouie
      @leckylouie  2 месяца назад

      Yes, to avoid damaging the radar and other bridge equipment. always inform the bridge duty officer to shutdown radar and ecdis prior blackout simulation test.

    • @sultanhussain6051
      @sultanhussain6051 2 месяца назад

      @@leckylouie yup ...many Thanks

  • @spanasia317
    @spanasia317 9 месяцев назад

    SIR SAAN MAKITA ANG TIMER RELAY PARA MEET NIYA YONG BELOW 45 SECOND.

    • @leckylouie
      @leckylouie  9 месяцев назад

      sir,.sa.loob ng.emergency.switchboard, andoon ang mga.timer relay. naka.set ng.SECONDS.