4:09 wouldn’t you need a string line on the boards to be sure they are straight before doing triangles?
What if the elevation has to be increased…by like a foot. Do you still take top soil before adding a foot of class 5 fill?
where are the footing?
What are you building on it?
I assumed this is a 4” thickness slab, but how thick and wide are the edges? 12”x12” or 18”x 18”
He said 12x12
Rebar?
there is a segment on rebar coming from the slab thanks
Are you ever afraid of hitting a certain type of line when you stake something into the ground?
Lol, squaring with a fiberglass tape?
Good enough for concrete…
Just to get rid of the 1 1/2" math. Couldn't you have just made both measurements from the outside of the form and when you took your final measurement just measured from the outside of form?
4:09 wouldn’t you need a string line on the boards to be sure they are straight before doing triangles?
What if the elevation has to be increased…by like a foot. Do you still take top soil before adding a foot of class 5 fill?
where are the footing?
What are you building on it?
I assumed this is a 4” thickness slab, but how thick and wide are the edges? 12”x12” or 18”x 18”
He said 12x12
Rebar?
there is a segment on rebar coming from the slab thanks
Are you ever afraid of hitting a certain type of line when you stake something into the ground?
Lol, squaring with a fiberglass tape?
Good enough for concrete…
Just to get rid of the 1 1/2" math. Couldn't you have just made both measurements from the outside of the form and when you took your final measurement just measured from the outside of form?