  • @mahasewansivam6453
    @mahasewansivam6453 2 года назад

    With English Very good explanation
    I like your nice and ample talk

  • @kashmirengineeringvision
    @kashmirengineeringvision 2 года назад +22

    if your generator is 80% efficient then you need 457 kva generator

  • @Islamic_video_BD
    @Islamic_video_BD 3 года назад +24

    Steps-5 366.3/(80/100)=457.875KVA So Calculate Generator Capacity Is 457.875 KVA .

    • @ibrahimpattasseri
      @ibrahimpattasseri 3 года назад +1

      Correct.

    • @truefaceofmo8307
      @truefaceofmo8307 3 года назад +4

      80% of 366.3 is 293.04 ... Go back to school bro..

    • @ahmadabdalwahab
      @ahmadabdalwahab 4 месяца назад +1

      @@truefaceofmo8307no brother he said the generator should always work at 80% capacity so the 80% should be equal to the demand and we add an extra 20% over that so it will be somewhere around 440 KVA

  • @james.8985
    @james.8985 2 года назад +1

    Thank you Sir for the broadcast presentation that was very informative.
    I would love to watch and learn more regarding generator sizing for star delta motor starting. 👍🇦🇺

  • @josephnesh4514
    @josephnesh4514 3 года назад +41

    80% efficiency means u need a higher kva generator to compensate not lower 🤦🏻‍♂️

    • @oserebright6505
      @oserebright6505 Год назад +2

      He was supposed to divide by .8. I think he corrected this in sizing transformers

    • @cavalier1953
      @cavalier1953 Год назад

      Yes correct

  • @renzofficial2435
    @renzofficial2435 3 года назад +1

    Good tutorial master sir, mabuhay

  • @tareqahmed9181
    @tareqahmed9181 3 года назад +6

    what about air conditioning loads ?
    What about calculation of starting rating or locked rotor rating? these are very important , you omitted

  • @ssempalacharles4623
    @ssempalacharles4623 2 года назад

    Thanks 🙏🙏🙏🙏 so much for your lecture

  • @nacanielitabua3143
    @nacanielitabua3143 Год назад +2

    Efficiency of DG must divided..Not multiplied.....Because you want to be able supply that power....

  • @balasubramanian8738
    @balasubramanian8738 3 года назад +1

    How much duration will it take to install dg sets for nuclear power at site

  • @truefaceofmo8307
    @truefaceofmo8307 3 года назад +2

    So KVA and KW is same because demand factor and efficiency is same 😎.... Here you should also take into consideration the inductive and capacitive load..

  • @thth5549
    @thth5549 Год назад

    Please i have water booster pump 180kw, i do not know what is size of generator good to run that booster

  • @javadasghari3436
    @javadasghari3436 3 года назад

    Is this 320kva should be prime size or continues rating of genset?

  • @Innocente1994
    @Innocente1994 2 года назад

    There is diversity of demand also. The diversity factor have to be also taken into consideration. Otherwise the size of the generator may very large and be uneconomical.

    • @oserebright6505
      @oserebright6505 Год назад

      This is usually considered before arriving here.

  • @kAAmi181
    @kAAmi181 2 года назад +3

    Why u have taken 80% working power. 457 KVA is true value of DEG by considering 80% working load on safer side.

  • @MohammadFarzaneh-l7m
    @MohammadFarzaneh-l7m Год назад +1

    I think it's better speak about the starting ampere of elevator. it's more than name plate. we should calculate this .isn't true?

  • @gurubasavarajjagalur2437
    @gurubasavarajjagalur2437 7 дней назад

    What about UPS load.?

  • @somasekhar1931
    @somasekhar1931 3 года назад

    Sir machine load amps how to calculate with checking multimeter and convert kva.

  • @dukaleashokdukaleshravan2029
    @dukaleashokdukaleshravan2029 2 года назад

    What is raw power & DG auxiliary load

  • @dalinsrin9797
    @dalinsrin9797 2 года назад

    Sir , could I ask references of calculations. I’m student so I need book for cases studying

  • @envitech02
    @envitech02 10 месяцев назад

    Calculated generator capacity is 366.3 / 0.8 = 457 KVA.

  • @mohameddeik9556
    @mohameddeik9556 4 года назад

    Thank you very much . Please can you abload me how to connect gerators in prallel ticnically and and as a drawing

  • @MohamedSaad-lc4eq
    @MohamedSaad-lc4eq 3 года назад +2

    it is not the correct study, what about the A/C's and other loads that have a high starting current, all the loads are steady-state loads! what about the 80% efficiency of the Gen-Set it's mean you select the higher rating, not a lower one. better to choose the software and add the loads as a step to avoid a higher selection of units.
    the application of unit also is very important (Means standby, prime, or continue dayacenter application)

  • @soorejnambiar83
    @soorejnambiar83 8 месяцев назад

    Very good explanation but I think your last step is wrong

    • @ashokkumar-mk5uo
      @ashokkumar-mk5uo 7 месяцев назад

      Sir unga number kadaikumaa Enku Dout eruku ethu Enku purila so koncha explain pnalama

  • @vipinmathew5036
    @vipinmathew5036 Год назад

    I saw your videos for selection of diesel generator and transformer.
    I think there is a small mistake.
    For transformer 90% efficiency , 366*90%= 407 (i check its 329.67)
    At the same for generator 80% efficiency, 366*80%=293.04
    Pls clear my doubt. I am your subscriber and trying to watching all your videos

  • @khansokha4097
    @khansokha4097 4 месяца назад

    excuse me Sir =10*33.3/100 = 33.3 why T.C.L = 366.3 kw

  • @masoudizadinejad2789
    @masoudizadinejad2789 Год назад

    Hi l think you have made mistake about calculate generator capacity

  • @anuj5084
    @anuj5084 5 месяцев назад

    Wrong