Concrete Floor for Curbless Shower | Basement Bath

Поделиться
HTML-код
  • Опубликовано: 26 янв 2025

Комментарии • 31

  • @wjlarsen
    @wjlarsen 4 месяца назад +1

    Thank you for your content. Very informative. I'll check out the courses!

  • @youaintdeadyet
    @youaintdeadyet 5 месяцев назад +1

    Your videos are excellent and super helpful.

  • @jmcguire56
    @jmcguire56 Год назад +3

    I really enjoy this kind of job.

  • @AlLaRiviere
    @AlLaRiviere Год назад +4

    I grabbed a used mixer off of marketplace for $100. I've poured close to 100 bags in my basement project now, sure helps a lot with the heavy lifting.

    • @guysumpthin2974
      @guysumpthin2974 Год назад +4

      Don’t breathe the dust , at all . Silicosis looks the same as asbestosis on the imagery

  • @johnburns2940
    @johnburns2940 Год назад +1

    I'm watching this video with bated breath. Can't wait to see.all this preliminary work pay off.

  • @youaintdeadyet
    @youaintdeadyet 5 месяцев назад +1

    Excellent video. Thank you so much. Period. I just found this. I roughed in my plumbing for my basement shower on a flip that I am doing. I backfilled with the gravel and dirt that I dug out to put the plumbing in. Is that going to be OK or do I need to pull that out and put gravel. I am concerned that the mostly dirt and gravel will settle overtime.

  • @ML-ks2lj
    @ML-ks2lj 3 дня назад

    Mam the amount of work to get that slab out. A must have is a good concrete saw. I like a hilti with a vacuum attachment for 4 inch slabs. A good vacuum is a must have as well or good chop saw with water attachments.
    I foind this channel because i was asked to help grow a young company with 2 men that have no idea ehat they are doing. I have never remodeled many bathrooms but i know how to build and operate pretty much every tool.

  • @gentzrayamcclellan6401
    @gentzrayamcclellan6401 5 дней назад

    How do you install the drain?

  • @nickbrunette8292
    @nickbrunette8292 Год назад +2

    How'd you get all that gravel down those stairs in the wheel barrel? Thanks so much for your content you do a really great job. Helped me rough in my basement bathroom and it's mint.

    • @BathroomRemodelingTeacher
      @BathroomRemodelingTeacher  Год назад

      Luckily there’s an attached garage, no steps 😊

    • @bobscaping
      @bobscaping Год назад +1

      For tough spots during our landscaping projects, we would fill two 5-gallon buckets 75% of the way with gravel and carry them. Two balances the load. One landscaper I knew used galvanized wash tubs with handles on them to move soil, mulch and stone!

  • @ericcapucci9869
    @ericcapucci9869 4 месяца назад

    so where do you draw the line? do you make the tile too?

  • @dmytrotomashuk2212
    @dmytrotomashuk2212 Год назад

    hi, may I ask why don't you ram gravel?

  • @mickeyshanks1429
    @mickeyshanks1429 Год назад +1

    How long do you allow the concrete to cure before the shower pan?

  • @XPTechnologies
    @XPTechnologies 3 месяца назад

    Can someone explain to me please. Don't you need rebarb if you're pouring 4 in of concrete?

  • @adamnorthville5636
    @adamnorthville5636 Год назад

    Thanks

  • @sivucit
    @sivucit Год назад

    Hi where did you get the foam baord can i get one in home depot or lowes. if it is slab why do you need to have vapor barrier in bottom bcz any case you are going to water seal it with redguard or kerdi membrane.

    • @BathroomRemodelingTeacher
      @BathroomRemodelingTeacher  Год назад +2

      Yep Home Depot and lowes carry it
      And it’s for mostly insulation value for heated flooring 👍

  • @THECLARKS-c3l
    @THECLARKS-c3l 6 месяцев назад

    What would you recommend for just a straight up concrete floor? Curbless shower concrete shower floor and bathroom floor all throughout no tile or vinyl on floor?

    • @ML-ks2lj
      @ML-ks2lj 3 дня назад

      Water for plumbing basically need 1/8" of fall per foot. Concrete should be slopped to the drain by that much. If you have a 2 foot slope to a drain then it is 2/8" or a 1/4" higher at the begining of the slop to the center of the drain
      Water will eventually erode the concrete so you need to use an adequate type of cement or something that won't pit and fall apart after water is constantly hitting it

  • @kevinhornbuckle
    @kevinhornbuckle Год назад

    I am interested to see how you slope the floor leveler.

  • @ElviaCorinaBarrionuevo
    @ElviaCorinaBarrionuevo 8 месяцев назад

    It's allready cemented y Will like to know how to make a bath roo
    Bathroom

  • @michaelerickson1518
    @michaelerickson1518 8 месяцев назад

    You could have used the concrete stretcher 'after' you run short

  • @johnlong1100
    @johnlong1100 5 месяцев назад

    Okay. I see some things but I would rather ask, can you give us a bullet list of things you would do differently. Thanks

    • @BathroomRemodelingTeacher
      @BathroomRemodelingTeacher  5 месяцев назад

      Nothing major really
      Hydroban instead of Ardex 8+9
      Spectralock pro epoxy instead of Ardex epoxy

  • @MikeHoncho1775
    @MikeHoncho1775 Год назад +1

    Why didn't you dowel in that curb to the existing concrete? It's going to break off over time. Also, why didnt you use rebar anywhere? On uncompacted gravel, thats going to crack and separate from the exhsting concrete floor

  • @REGDORTNARG
    @REGDORTNARG Год назад +2

    nioe work